Business

November 13, 2015
 

Next Generation Jammer completes Preliminary Design Review milestone

El SEGUNDO, Calif.–Raytheon, in partnership with the U.S. Navy, has completed the Preliminary Design Review for the Next Generation Jammer program, a key milestone in the acquisition process.
“Raytheon and the Navy have made system engineering process discipline a top priority from the outset of the NGJ program,” said Travis Slocumb, vice president of Electronic Warfare Systems at Raytheon’s Space and Airborne Systems. “The successful completion of PDR is indicative of the strength of our partnership, and we will apply that same focus as we move into the follow-on phases of the program.”
The NGJ is scheduled to replace legacy ALQ-99 jamming pods, delivering new capabilities for the Navy’s EA-18G Growler. The Navy plans to declare Initial Operating Capability for the Jammer in 2021.
“The Jammer’s open architecture design, coupled with high-powered, solid state electronics and agile jamming techniques, will enable us to meet U.S. Navy electronic warfare mission requirements while ensuring the affordability of future upgrades,” said Daniel Theisen, Director of Airborne Electronic Attack programs for Raytheon Space and Airborne Systems.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines – March 20, 2019

News FBI joining criminal investigation into certification of Boeing 737 MAX – The FBI has joined the criminal investigation into the certification of the Boeing 737 MAX, lending its considerable resources to an inquiry already being conducted by U.S. Department of Transportation agents, according to people familiar with the matter.   Suspected militants detained in...
 
 

News Briefs – March 20, 2019

Congressman pitches Louisiana for Trump’s Space Force locale U.S. Rep. Ralph Abraham is urging President Donald Trump to consider Louisiana for the future headquarters of Trump’s proposed Space Force. The Republican congressman wrote a letter to the president, suggesting Louisiana was an “ideal location” because of its strong existing relationships with the military and NASA....
 
 

NASA’s Mars 2020 Rover is put to the test

NASA/JPL-Caltech photograph Technicians working Mars 2020’s System’s Test 1 approach their workstation in the Spacecraft Assembly Facility at NASA’s Jet Propulsion Laboratory in Pasadena, Calif. In a little mo...