Business

May 27, 2016
 

Boeing, U.S. Air Force adjust KC-46 tanker schedule

The U.S. Air Force is moving its formal production decision on the KC-46 tanker program—known as Milestone C—from June 2016 to August 2016 to allow additional time to implement the solution to a refueling boom loads issue identified during flight testing earlier this year.

The Air Force also released an updated projection from Boeing for initial KC-46 deliveries and the expected timing for delivery of the first 18 certified tanker aircraft, a milestone known as Required Assets Available.

Due to ongoing complexities associated with qualification and certification of the aircraft’s centerline drogue and wing-aerial refueling pod systems, and the previously announced higher volume of change incorporation to bring the first 18 aircraft up to the certification configuration, the first tanker delivery will move from March 2017 to August 2017 with the 18th aircraft delivered in January 2018.

According to Boeing, the underlying production system remains on track, and Boeing will have more than 18 aircraft through the factory line and in various stages of final change incorporation and certification by August 2017. The first 18 aircraft will be equipped with refueling boom and centerline drogue refueling capabilities as well as all other contract required capability except WARPs. The WARP systems required to complete full contractual RAA will be delivered separately in October 2018.

“Boeing continues to demonstrate its commitment to the U.S. Air Force and the tanker program with five aircraft now in test (including the first production aircraft), seven aircraft in final production build, and 8 aircraft in the supply chain – up to tail number 20,” the company said in a statement. “The KC-46 Tanker will play a vital role in America’s Air Mobility Forces providing both global power projection and unrivaled global reach for decades to come.”




All of this week's top headlines to your email every Friday.


 
 

 
Airbus photograph

Airbus delivers first aircraft from Mobile powered by sustainable jet fuel blend

Airbus photograph An A321 for operator JetBlue is the first aircraft produced at Airbus’ U.S.-based A320 Family production line to be partially powered by sustainable jet fuel. Airbus’ A320 Family production facility in the...
 
 
Northrop Grumman photograph

Northrop Grumman unveils ‘Vanguard’ open architecture radar solution

Northrop Grumman photograph Northrop Grumman’s Vanguard radar is a modular, scalable radar architecture that can meet a wide range of mission requirements and integrate into a variety of platforms across domains. Northrop Gru...
 
 

Cubic to deliver next-gen air combat training system for F-35

Cubic Corporation announced Sept. 20 that its Cubic Global Defense business division, was awarded a contract from Lockheed Martin to deliver its latest-generation Air Combat Training System for the F-35 Lightning II. Cubic is scheduled to deliver more than 500 F-35 Training Subsystems over the next four years as part of Lockheed Martin’s F-35 production...