Business

June 2, 2017
 

U.S. Air Force awards Lockheed Martin $413 million for JASSM®-ER production

PRNewswire Lockheed Martin has received a $413.8 million contract from the U.S. Air Force for Lot 15 production of the Joint Air-to-Surface Standoff Missile (JASSM)-Extended Range (ER) version.

The Lot 15 contract includes 360 JASSM-ER missiles, data, tooling and test equipment. These 360 missiles bring JASSM-ER missiles under contract to 910, and to more than 3,000 missiles for JASSM and JASSM-ER combined.

“We have focused our efforts on enhancing the capabilities of this formidable and highly reliable missile for U.S. and allied warfighters,” said Jason Denney, program director of Long Range Strike Systems at Lockheed Martin Missiles and Fire Control. “Lot 15 and future production lots will benefit from the enhancements and the many affordability initiatives we are executing.”

Armed with a penetrating blast-fragmentation warhead, both missiles can be used in all weather conditions. They share the same powerful capabilities and stealth characteristics, though JASSM-ER has more than two-and-a-half times the range of JASSM for greater standoff range. These 2,000-pound cruise missiles employ an infrared seeker and enhanced digital anti-jam GPS receiver to dial into specific points on targets.

Effective against high-value, well-fortified, fixed and relocatable targets, JASSM is integrated on the U.S. Air Force’s B-1B, B-2, B-52, F-16 and F-15E. The B-1B also carries JASSM-ER. Internationally, JASSM is carried on the F/A-18A/B and the F-18C/D aircraft.

Produced at the company’s manufacturing facility in Troy, Ala., more than 2,150 JASSMs have been delivered.




All of this week's top headlines to your email every Friday.


 
 

 

Boeing’s 787-10 Dreamliner cleared for commercial service by FAA

Boeing announced Jan. 22 the 787-10 Dreamliner received an amended type certificate from the U.S. Federal Aviation Administration, clearing the airplane for commercial service. The awarding of ATC caps a successful flight test program that began in March 2017 and involved three flight test airplanes that accumulated about 900 test hours. Boeing’s flight test program...
 
 

Airbus could abandon A380 superjumbo amid lackluster sales

Airbus said Jan. 15 it will stop making the costly A380 superjumbo if it can’t strike a long-term deal with the airline Emirates for a steady supply of the planes. Abandoning the A380 would be a disappointing defeat for Airbus, which spent many years and many billions developing the double-decker behemoth, even as skeptics questioned...
 
 

Boeing, Adient launch new company to design, build airplane seats

Boeing and Adient announced Jan. 16 the formation of Adient Aerospace, a joint venture that will develop, manufacture and sell a portfolio of seating products to airlines and aircraft leasing companies. The seats will be available for installation on new airplanes and as retrofit configurations for aircraft produced by Boeing and other commercial airplane manufacturers....