Business

February 11, 2019
 

Northrop Grumman receives $59 million U.S. Air Force contract for next-gen navigation system

The E-2D is one of the lead platforms selected for EGI-M integration,

The U.S. Air Force has awarded Northrop Grumman a $59 million contract for the engineering and manufacturing development phase of the Embedded Global Positioning System/Inertial Navigation System-Modernization, or EGI-M, technology.

The approval to proceed to the EMD phase follows the Department of Defense’s Milestone B approval in October 2018. During the EMD phase, Northrop Grumman will develop the critical hardware and software design for the EGI-M, build hardware for integration and qualification, generate safety and civil certification documentation, qualify the new EGI-M systems to rigorous military standards, and build production units for platform testing.

Based upon modular and truly open systems architecture, the EGI-M system will support the rapid insertion of new capabilities and adaptability based on unique platform requirements. Additionally, the modernized navigation system will incorporate new generation GPS receivers, which will be capable to securely and accurately transmit the new military signals for space (M-Code). The EGI-M will be integrated into multiple platforms across all of the services and exportable versions will be developed for international customers. The lead platforms for EGI-M are F-22 and E-2D.

“This EMD award brings us an important step closer to fielding a modernized navigation system that provides accurate positioning, navigation and timing information, even when GPS is denied,” said Dean Ebert, vice president, navigation and positioning systems, Northrop Grumman. “Northrop Grumman is dedicated to ensuring the safety and mission success of our warfighters by providing a resilient assured PNT solution that will allow service members to fly, fight and win in any environment.”

EGI-M technology is designed for compatibility with current systems on legacy aircraft, allowing ease of integration and rapid adoption of new capabilities. EGI-M will also comply with the Federal Aviation Administration’s NextGen air traffic control requirements that aircraft flying at higher altitudes be equipped with Automatic Dependent Surveillance-Broadcast Out by January 2020. ADS-B Out transmits information about an aircraft’s altitude, speed and location to ground stations and to other equipped aircraft in the vicinity.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines – February 15, 2019

News Former Air Force tech sergeant who defected to Iran charged with spying – A former Air Force counterintelligence specialist, a technical sergeant, who defected to Iran about five years after leaving the Air Force, has been charged with revealing classified information as well as research about her former colleagues to representatives of the Tehran...
 
 

News Briefs – February 15, 2019

Pentagon official assures Iraqis of limited U.S. military role The top Pentagon official assured Iraqi leaders Feb. 12 that the U.S. will stick to its limited military role in Iraq, a message aimed at recent talk by some Iraqi politicians of forcing a U.S. troop withdrawal. Pat Shanahan, the acting secretary of defense, said that...
 
 
Courtesy photograph

High Desert Hangar Stories: Tony LeVier and the wall

Courtesy photograph Tony LeVier and ground crew with the XF-90. With all due respect to the rock group Pink Floyd, back in 1950 there were very few “bricks in the wall” known as the sound barrier. Today, a multitude of pilo...