Local

March 23, 2012

D-M successfully completes ORI

Tags:

ORI_pict
Staff Sgt. Chase Capehart, 355th Aircraft Maintenance Squadron, performs maintenance on an A-10 Warthog during an Operational Readiness Exercise at here last month in preparation for the Operational Readiness Inspection.

The votes have been tallied and a decision has been made. The Operational Readiness Inspection has come to a successful conclusion.

Inside the base theater in front of a packed house, the Air Combat Command Inspector General showed the following overall ratings. The 355th Fighter Wing received a Satisfactory, the 55th Electronic Combat Group received an Excellent and the 563rd Rescue Group received a Satisfactory.

The Desert Lightning Team has had its fair share of practice for this Phase I ORI. The base conducted its first of eight operational readiness exercises in September 2010.

“A year and a half ago, we learned we had a lot of work to do and areas that needed improvement,” said Col. John Cherrey, 355th Fighter Wing commander. “After 18 months of practicing, training and addressing the needs of our units, the DLT showed their commitment to getting the mission accomplished.”

These OREs are used as a way to review and refine the readiness processes and procedures aimed at effectively deploying Airmen and equipment on a large scale. These areas were inspected during the ORI.

“The Inspector General team focused on inspecting areas outlined in Air Force Instruction 90-201 with an emphasis on command and control, deployment readiness, employment readiness, information operations and force protection,” said Tech. Sgt. Kevin Bonavita, 355th Fighter Wing inspections.

Throughout the past year and a half, the DLT has made significant progress that has led to the bases improved ORI rating.

“The DLT has made huge strides in the last year and has responded to every challenge we’ve improved from an unsatisfactory rating in 2010 to a satisfactory in 2012,” Bonavita said. “I believe we went into the ORI ready on all fronts. Everyone from the DLT showcased their ability to rise to the occasion and excel.”

“What really impressed the inspection team were the Airmen,” Cherrey said. “They said the attitude of the Airmen was professional and they worked together as a team. The men and women of D-M have done an incredible job.”




All of this week's top headlines to your email every Friday.


 
 

 

New tool to improve cleanup at Tucson-area AF plant

The AF Civil Engineer Center has found a new method to remove toxins trapped in naturally occurring dense soils, like clay, in Tucson called Hrydrofracturing. During the 1950s to the early 1970s, Air Force Plant 44 in Tucson, a government-owned, contractor-operated manufacturing facility, disposed of metals and solvents which led to soil and groundwater contamination...
 
 

D-M to host 2nd annual Pat’s Run

Davis-Monthan is scheduled to host the Second Annual DMAFB Pat’s Run Troop Run on Saturday, April 25 at 8 a.m. The ruck/walk/run will begin at the Benko Fitness Center and will be 4.2 miles long. This event can be enjoyed by all family members! Cost for adults is $20.00 and children 12 and under are...
 
 

Dreamliner lands, defuels at D-M en route to Pima Air & Space Museum

A Boeing 787-8 Dreamliner is towed across Valencia Road to the Pima Air & Space Museum after landing and defueling at Davis-Monthan Air Force Base, March 26. The aircraft is the first large commercial aircraft to feature an airframe made almost entirely of composite materials rather than aluminum. A Boeing 787-8 Dreamliner is towed on...
 

 
(U.S. Air National Guard Photo by Staff Sgt. Erich B. Smith)

162nd Wing provides assistance as D-M security forces goes “down range”

For decades now, the 162nd Wing and Davis-Monthan Air Force Base have maintained the presence of global air power in the Tucson skies while invoking a patriotic sprit in the community. Their military presence, however, is not e...
 
 
(U.S. Air Force photo by Airman 1st Class Chris Drzazgowski)

355th Communication Squadron stands up call center

On April 1, the 355th Communications Squadron launched a new call center here for D-M customers to receive local customer support from the 355th Cobras rather than from The Enterprise Service Desk. Customers should continue usi...
 
 

Dreamliner lands at D-M en route to Pima Air & Space Museum

(U.S. Air Force photo by Airman 1st Class Chris Massey) A Boeing 787-8 Dreamliner is towed across Valencia Road to the Pima Air & Space Museum after landing and defueling at Davis-Monthan Air Force Base, March 26. The aircraft is the first large commercial aircraft to feature an airframe made almost entirely of composite materials...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>


Directory powered by Business Directory Plugin