NASA

August 2, 2013

Mission control center upgrades increase capability

Both of NASA Dryden’s mission control centers, the “Blue Room” shown here and the slightly smaller “Gold Room,” provide engineers with real-time data on their individual computer monitors and in-flight video on large screens.

Performing major renovations to the gold and blue rooms may sound like it’s leading to the grand re-opening of a popular night club, but at NASA’s Dryden Flight Research Center, it means an increased capability in flight operations and testing.

The almost six-month overhaul of Dryden’s MCC1 and MCC2 Mission Control Centers – known at the center as the “blue” and “gold” rooms respectively for their color schemes – included replacing hardware almost a decade old. With the demanding schedule the control rooms face, this hardware upgrade had to be planned in such a way to allow one control room to be available for scheduled research flights while upgrades were under way in the other. All 42 control room workstations, 26 in the blue room and 16 in the smaller gold room, were replaced.

“There is a lot more horsepower, a lot more onboard storage,” said Russell James, the range systems engineering group lead. “All the networking stuff is incredibly fast and robust compared to what it was.”

Additionally, upgrades were made to the software, including improvements in information technology security. High definition video was also added to the gold room along with some cosmetic changes.

NASA engineers can now follow test flights on banks of modern LED computer monitors that display flight and engineering data, geographical references and real-time flight video.

For approximately $320,000, the renovations increased the control centers’ capabilities, enabling collection, processing and display of mission data for all flight projects using the control rooms to progress with greater speed and reliability.

“This is why Dryden is here,” James said. “We fly airplanes, and to do so safely they (researchers) want to be able to monitor the health and status of the vehicle in near real time and the MCC is the place to do that.”

The flight research center needs two control rooms with nearly identical capabilities to maintain the flexibility needed to support ongoing aeronautics projects. This flexibility was especially important during the upgrade.

Dryden’s gold room has been designated the control center for the upcoming approach and landing flight tests of Sierra Nevada Corporation’s Dream Chaser. The Dream Chaser is intended to be a space-faring vehicle capable of transporting astronauts to and from low-Earth orbit and the International Space Station, and then making an airplane-style landing on a runway, similar to landings of the now-retired space shuttles.

The recently refurbished blue room is set to host the F/A-18 No. 853 Launch Vehicle Adaptive Control Experiment. The project entails in-flight validation of the launch trajectory software for NASA’s Space Launch System heavy-lift rocket now in development.

In addition to supporting NASA Dryden’s flight tests, the Western Aeronautical Test Range, of which Dryden’s control rooms are a part, support Air Force test flights.

This photo shows the layout of Dryden’s “Blue Room” control center prior to undergoing major renovations to its hardware and software.

When both control centers are up and running, researchers can use either room for monitoring research flights. That permits necessary system tests in the other. Data quality is essential to the research and to protect resources and lives that a failed flight test could endanger.

The data from flight test, according to mission control center software engineering manager Jack Sheldon, “has to be right the first time, every time.”

 




All of this week's top headlines to your email every Friday.


 
 

 

News Briefs December 19, 2014

Commissary hours The Commissary will be closed Dec. 25 and 26. Regular hours will resume Dec. 27. The Commissary will be open regular hours Dec. 31, and closed Jan. 1, 2015. For more information, call 661-277-9175. Museum hours The Air Force Flight Test Museum will be closed for the Christmas holidays starting Dec. 22 and...
 
 

412th Force Support Squadron Holiday Hours

Christmas Eve: Dec. 24 OPEN: Aero Club: 8 a.m.-4 p.m. Arts & Crafts/Auto Hobby: 9 a.m.-3 p.m. Airman & Family Readiness: 7:30 a.m.-4:30 p.m. Child Development Center: 6:15 a.m.-5 p.m. Family Child Care: 7:30 a.m.-5 p.m. High Desert Inn: Open seven-days a week, 24-hours a day Information, Tickets & Tours: 9 a.m.-5 p.m. Library: 9...
 
 
Air Force photograph by Rebecca Amber

Edwards First Sergeants council wraps up Christmas programs

Air Force photograph by Rebecca Amber The annual Angel Tree program will provide gifts for around 300 Edwards children this year. The Edwards First Sergeants Council puts on the event to help Airmen unable to buy their children...
 

 
afmc-q-and-a

Lean thinking, process improvement highlight Busch’s time at AFMC

During the last 16 years and six assignments in Air Force Materiel Command, Vice Commander Lt. Gen. Andrew Busch was challenged to find new methods to operate more efficiently in one of the most complex and diverse commands tha...
 
 
flu

Flu season: What you need to know

Flu is officially upon us. If you have ever had the flu, you know it can knock you out ó with members of your family, friends and co-workers not far behind. Today, it’s more important than ever to get your facts straight...
 
 
driving-safety

Driving safely on snow or icy roads

Unless you’re traveling through the mountains of Southern California in the winter, driving in the snow doesn’t occur very often. First off, don’t assume your vehicle can handle any road condition. Even four-w...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>