Air Force

September 27, 2013

AFRL gives paint job to Thor

Tags:
Rebecca Amber
Staff writer

A group of Air Force Research Laboratory Detachment 7 volunteers painted the Douglas PGM-17A ìThorî missile in its original color scheme at the Air Force Flight Test Museum Sept. 20.

A group of company grade and non-commissioned officers†from the Air Force Research Laboratory Detachment 7†painted the Douglas PGM-17A “Thor” at the Air Force Flight Test Museum Sept. 20.

According to 1st Lt. Jonathan Fullenkamp, Advanced Tactical Booster Technology Demonstrator deputy program manager , the paint job was part two of the project. Volunteers, led by Tech. Sgt. Jeremy Page and Staff Sgt. Timothy Burkins, came out earlier in the year to give it a pressure wash and primer coat.

Thor is now painted in its original white paint scheme. Fullenkamp explained that Thor was the predecessor to Atlas, Peacekeeper and Minuteman missiles.

“Back in the 1950s this was prime technology,” said Fullenkamp. “But its range is much shorter than what we can do today.”

Thor is an operational intermediate range ballistic missile that is 65 feet long and weighs 105,000 pounds. The missile used a single-stage North American Rocketdyne LR-79 liquid oxygen rocket motor which provided 150,000 pounds of static thrust giving Thor a range of 2,000 miles. The motor was tested extensively at Edwards AFB’s†Rocket Propulsion Laboratory.

The SM-75/PGM-19A Thor intermediate range ballistic missile was the product of the early Cold War race to deploy nuclear armed missiles before the Soviets. Thor was designed to be an interim nuclear deterrent while the U.S. Air Force developed long-range intercontinental ballistic missiles as a top national priority. The IRBM concept called for a missile with a range of about 1,500 miles that would be based in Europe. Great Britain agreed to host four IRBM bases, and Thors were operational in England from June 1959 to August 1963. Royal Air Force crews operated the missiles, but U.S. Air Force personnel controlled their nuclear warheads.

The first successful launch was in 1957 and it went into active military service the following year. It was launched from a combination transporter-erector vehicle and was directed to its target by a self-contained inertial guidance system.

“Because we’re so far separated, we try to use these volunteer opportunities to stay connected with the Edwards community as a whole,” said Fullenkamp. “With AFRL being a tenant unit and 30 miles away sometimes we lose sight of what’s going on down here and vice versa so we try to use these opportunities to stay connected.”




All of this week's top headlines to your email every Friday.


 
 

 

Changes to academic degree, developmental education expectations

Air Force officials announced actions designed to set clear expectations, restore Airmen’s time and refocus officer promotions on job performance. The Air Force has addressed long-standing perceptions that to be promoted, officers must complete an advanced academic degree, and those officers selected by a promotion board to attend developmental education in-residence, are expected to firs...
 
 

Service members receiving RAND Military Workplace Survey

About 580,000 service members have begun receiving e-mails or letters inviting them to participate in the first RAND Military Workplace Study, Defense Department officials said. Active and reserve component members in all military branches and the Coast Guard are being invited to participate. “The survey is unprecedented in its scale and will influence policies that...
 
 
Air Force photograph

C-130 Hercules still going strong at 60

Air Force photograph The C-130H Hercules dons the new eight-blade NP-2000 propellers. The 418th Flight Test Squadron replaced the C-130H Hercules’ four-bladed propellers with the eight-bladed propellers in 2008 in support...
 

 
Air Force photograph by Rebecca Amber

New AF Inspection System changes inspection culture

Air Force photograph by Rebecca Amber Kimberly Strong, 412th Test Wing Inspector General Wing Inspection Team lead, works in the new Management Inspection Communication Tool. Strong is instrumental in organizing Wing Inspection...
 
 

AF implements static EPR closeout dates, eliminates change of reporting official reports*

The first in a series of changes to the enlisted evaluation and promotion systems announced July 31 will include implementation of static enlisted performance report closeout dates ñ or SCOD ñ for each grade and elimination of change of reporting official EPRs. The SCOD also drives adjusted active duty promotion eligibility cutoff dates for promotion...
 
 

Team works to solve POV shipment issues

SCOTT AIR FORCE BASE, Ill. – Military Surface Deployment and Distribution Command and U.S. Transportation Command are standing up a team of transportation experts this week to quickly address the most significant challenges and concerns military customers are facing when shipping their privately owned vehicles. On May 1, International Auto Logistics, known as IAL, assumed...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>