Air Force

April 18, 2014

B-1B software upgrade to ensure future warfighting capabilities

Tags:
Jet Fabara
412th TW Public Affairs

An Edwards B-1B Lancer takes off on April 1, 2014, to begin testing its new Sustainment Block 16A software upgrades. The SB 16A software will work in conjunction with the long-range bomberís new glass cockpit configuration in order to ensure its capabilities in a fast-paced integrated battlefield of the future.

In order to keep the B-1B Lancer’s capabilities ready to operate now and well into the fast-paced integrated battlefield of the future, the 419th Flight Test Squadron began testing Sustainment Block 16A (SB 16A) software upgrades here April 1, to work in conjunction with the long-range bomber’s recently added glass cockpit configuration.

The SB 16A software is a fielding configuration that will enhance the glass cockpit introduced as part of the B-1 Integrated Battle Station (IBS) modification, increase Link 16 capabilities, and provide a leap in situational awareness for the B-1 operators. Link 16 allows all Link 16-equipped military aircraft, as well as naval and ground forces, to interact and exchange overall tactical pictures in near-real time.

“The SB 16A configuration is expected to improve situational awareness to all crew members, increase the maintainability of the B-1B, and provide data link capabilities to the field. Major software enhancements include improved integration between the B-1 offensive avionics system, various onboard sensors and the data link which results in improved battlespace awareness for both the B-1 aircrew and fellow strike package assets,” said Capt. Carlos Pinedo, 419th FLTS B-1 Test Pilot and flight commander.

The 419th Flight Test Squadron began testing Sustainment Block 16A software upgrades at Edwards Air Force Base, Calif., on April 1, 2014, to work in conjunction with the long-range bomberís new glass cockpit configuration.

“The new displays allow aircrew members to seamlessly pass information and accomplish tasks that were once crew-position dependent. The overall result is improved situational awareness and a reduction in crew workload leading to improved combat effectiveness. The improved sustainability of the B-1B as a result of this program will help maintain the Air Force’s long-range strike capability for many years to come.”

According to Raymond So, 412th Test Engineering Group project lead engineer, the focus of the test squadron after April 1 is to identify any deficiencies as early as possible so that the customer has time to resolve issues and provide the warfighter with the best available product.

“The greatest challenge for the team [currently] is to understand the software maturity and requirements flowing into SB 16A. The new displays and interface will have such a great impact on B-1B tactics and situational awareness that the team is learning and identifying how the new aircraft will be used,” added So. “This has also changed our testing philosophy. We have had to adapt our testing to the new system that we are given.”

Pinedo noted that the squadron plans to test the upgrades in four phases, in which the final phase will be the configuration that the warfighter will see.

“SB 16A testing builds on and merges prior tests, which included, but are not limited to the Integrated Battle Station with the new glass cockpit design, updated Inertial Navigation Systems and the B-1B Radar Reliability and Maintainability Improvement Program,” Pinedo said. “The flight and ground tests will be accomplished in four phases, each relating to a different software drop; ultimately resulting in the first operational fielding of the new cockpit design.”

According to the test team, SB 16A testing is projected to end in February 2015 in which the 419th FLTS will have tested four different software phases. The last phase involves the final software going into operational test phase.




All of this week's top headlines to your email every Friday.


 
 

 

News Briefs August 28, 2014

Blood drive The next American Red Cross Blood Drive at Edwards AFB is 10 a.m.-4 p.m., Sept. 3 in the Chapel 1 Annex. Both walk-ins and appointments are accepted. To make an appointment you may contact the blood drive coordinators:†Senior Airman Joe Hernandez at joe.hernandez.8@us.af.mil or Senior Airman Sarah Bird at sarah.bird.2@us.af.mil. You may also...
 
 

Notice of intention to appoint school board trustee

Due to a lack of sufficient candidates for the upcoming school board election for Trustee Area #2, Office B, the Board of Trustees of the Muroc Joint Unified School District intends to appoint a qualified individual to the Board of Trustees, pursuant to Education Code section 5326. Applicants must be 18 years of age or...
 
 

New paradigm aims to ‘zeroize’ sexual assault

Why does the U.S. Air Force need a Sexual Assault Awareness Month? Is it really a problem? Isn’t sexual assault more prevalent outside the military? Where do these statistics come from anyway? Is it realistic to aim for zero assaults? Thankfully, these outrageous questions represent the vestiges of a retreating mindset. A new paradigm aims...
 

 
nasa-obit

Former NASA Astronaut Steven Nagel, veteran of four shuttle flights, dies at 67

Former NASA astronaut Steven R. Nagel, who served as a mission specialist on his first space shuttle flight, pilot on his second and commanded his final two, died Aug. 21 after a long illness. He was 67 years old. After his las...
 
 
Air Force graphic by Rebecca Amber

Being prepared in earthquake country

Air Force graphic by Rebecca Amber For National Preparedness Month, this September, the Edwards AFB Office of Emergency Management is focusing on Califorina’s most prominent natural disaster – earthquakes. Throughou...
 
 
af-band

Air Force Band of the Golden West

  Travis Brass, the multi-talented brass group of the U.S. Air Force Band of the Golden West will be performing in the area Sept. 5-7. Sept. 5, the group will be at the Santa Clarita Performing Arts Center, 26455 Rockwell ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>