Air Force

November 27, 2013

Northrop’s BACN completes 5,000 combat missions

The Battlefield Airborne Communications Node, developed by Northrop Grumman for the U.S. Air Force, has completed 5,000 combat missions connecting war fighters in the air and on the ground.

BACN is a high-altitude, airborne gateway that translates and distributes voice communications, video, imagery and other battlespace information from numerous sources. Using a suite of computers and radio systems, BACN bridges and extends communications among disparate users and different datalink networks to provide situational awareness and enable better command and control coordination between war fighters and commanders.

The BACN fleet comprises four E-11A manned systems and three Northrop Grumman EQ-4B Block 20 Global Hawk unmanned aircraft systems. BACN supports missions executed by the 430th Expeditionary Electronic Combat Squadron at Kandahar Airfield in Afghanistan, and by the 380th Air Expeditionary Wing in Southwest Asia. Together, the 430th and the 380th reached the 5,000 combat mission milestone Nov. 9, 2013.

“Initially deployed by Northrop Grumman to satisfy a joint urgent operational need, BACN is now a key enabler of surface and airborne missions theaterwide,” said Mike Twyman, sector vice president and general manager of the Defense Systems division for Northrop Grumman Information Systems. “BACN’s continuous mission availability, quick reaction capability and flexibility have made it a real game changer in theater.”

The persistent connectivity BACN provides is used to successfully execute a number of missions, including airdrops and overall air operations. The system’s beyond-line-of-sight capability has been particularly useful overcoming the communications limitations posed by Afghanistan’s rugged terrain.

“We constantly get feedback from theater telling us how important BACN is for their missions,” said Maj. William Holl, the Air Force BACN program manager at Hanscom Air Force Base, Mass. “Without BACN, ground forces would have to rely on much slower satellite communications – and a few seconds can make all the difference when you are under fire.”

BACN achieved another major milestone on Aug. 11, 2013, completing 50,000 combat flight hours of service.

Northrop Grumman is the prime contractor for developing, deploying, operating and sustaining BACN in support of U.S. Central Command. Northrop Grumman maintains the BACN E-11A aircraft platforms; the U.S. Air Force maintains the EQ-4B Global Hawk platforms.

Northrop Grumman was awarded the first BACN contract in April 2005 by the U.S. Air Force Life Cycle Management Center (previously the Air Force Electronics Systems Center), Hanscom Air Force Base.




All of this week's top headlines to your email every Friday.


 
 

 
square

Luke conducts first F-35 training deployment

Senior Airman Thomas Spangler A 61st Fighter Squadron F-35 Lightning II joint strike fighter taxis prior to take off April 15 at Nellis Air Force Base, Nevada. Ten F-35s from the 61st Fighter Squadron were sent to Nellis for th...
 
 

The gift of leadership

Gen. Mark Welsh III may have said it best, “Leadership is a gift. It’s given by those who follow. You have to be worthy of it.” As the people of this nation give their children up to serve in the armed forces we as leaders need to be ready to lead them as they are...
 
 

Have faith in Air Force system

Throughout our Air Force careers, we have all received extensive training covering the Air Force core values — integrity first, service before self and excellence in all we do. We talk about them on a daily basis in one capacity or another using them as buzz words to drive our point home or steer a...
 

 

Sidewinders fly missing-man formation

A missing-man formation flyover took place at the Air Force Academy Cemetery April 14, to honor a fallen Airman whose remains were repatriated and laid to rest. Pilots from the 311th Fighter Squadron of the 54th Fighter Group from Holloman Air Force Base, New Mexico, flew it. Capt. Richard Chorlins, U.S. Air Force Academy class...
 
 

Birth of a flagship

Courtesy photo An F-35 Lightning II joint strike fighter taxis at Lockheed Martin’s Fort Worth, Texas, facility just before its first flight March 31. This jet is one of several Lightning IIs destined for Luke Air Force Base in the near future after flight testing. Tail number 5056 is scheduled to be the 56th Fighter...
 
 

News Briefs April 24, 2015

Days of Remembrance There will be a Holocaust remembrance ceremony at 10 a.m. Thursday in the Luke Air Force Base Chapel sanctuary. The Hiding Place exhibit will be on display 11 a.m. to 4:30 p.m. Thursday and 8 a.m. to 4:30 p.m. May 1 in the chapel annex. AFA golf tournament The 16th Annual Air...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>


Directory powered by Business Directory Plugin