Air Force

November 27, 2013

Northrop’s BACN completes 5,000 combat missions

The Battlefield Airborne Communications Node, developed by Northrop Grumman for the U.S. Air Force, has completed 5,000 combat missions connecting war fighters in the air and on the ground.

BACN is a high-altitude, airborne gateway that translates and distributes voice communications, video, imagery and other battlespace information from numerous sources. Using a suite of computers and radio systems, BACN bridges and extends communications among disparate users and different datalink networks to provide situational awareness and enable better command and control coordination between war fighters and commanders.

The BACN fleet comprises four E-11A manned systems and three Northrop Grumman EQ-4B Block 20 Global Hawk unmanned aircraft systems. BACN supports missions executed by the 430th Expeditionary Electronic Combat Squadron at Kandahar Airfield in Afghanistan, and by the 380th Air Expeditionary Wing in Southwest Asia. Together, the 430th and the 380th reached the 5,000 combat mission milestone Nov. 9, 2013.

“Initially deployed by Northrop Grumman to satisfy a joint urgent operational need, BACN is now a key enabler of surface and airborne missions theaterwide,” said Mike Twyman, sector vice president and general manager of the Defense Systems division for Northrop Grumman Information Systems. “BACN’s continuous mission availability, quick reaction capability and flexibility have made it a real game changer in theater.”

The persistent connectivity BACN provides is used to successfully execute a number of missions, including airdrops and overall air operations. The system’s beyond-line-of-sight capability has been particularly useful overcoming the communications limitations posed by Afghanistan’s rugged terrain.

“We constantly get feedback from theater telling us how important BACN is for their missions,” said Maj. William Holl, the Air Force BACN program manager at Hanscom Air Force Base, Mass. “Without BACN, ground forces would have to rely on much slower satellite communications – and a few seconds can make all the difference when you are under fire.”

BACN achieved another major milestone on Aug. 11, 2013, completing 50,000 combat flight hours of service.

Northrop Grumman is the prime contractor for developing, deploying, operating and sustaining BACN in support of U.S. Central Command. Northrop Grumman maintains the BACN E-11A aircraft platforms; the U.S. Air Force maintains the EQ-4B Global Hawk platforms.

Northrop Grumman was awarded the first BACN contract in April 2005 by the U.S. Air Force Life Cycle Management Center (previously the Air Force Electronics Systems Center), Hanscom Air Force Base.




All of this week's top headlines to your email every Friday.


 
 

 

Fighting Falcons arrive at Holloman

Courtesy photo Six F-16 Fighting Falcons from the 308th Fighter Squadron at Luke Air Force Base arrive in formation June 16 at Holloman Air Force Base, New Mexico. The 308th FS has inactivated and the soon to be activated 314th FS assumes the 308th FS mission of training F-16 pilots as a 56th Fighter Wing...
 
 
Courtesy photo

Hecker assumes command of 19th Air Force

Courtesy photo Gen. Robin Rand, Air Education and Training Command commander, presents the unit guidon to Maj. Gen. James Hecker during the 19th Air Force assumption of command ceremony June 23 at Joint Base San Antonio-Randolp...
 
 

Air Force News – June 26, 2015

Alaska Firefighters from the 673rd Civil Engineer Squadron at Joint Base Elmendorf-Richardson recently assisted with the Division of Forestry’s efforts in containing the Sockeye wildfire near Willow. The fire is estimated to cover more than 7,000 acres of land.   Virginia The 2015 Department of Defense Warrior Games opened June 19 with about 250 athletes...
 

 

People First – June 26, 2015

EPME enrollment notifications begin The Air Force Personnel Center recently initiated a phased approach to notify approximately 83,000 Airmen of the requirement to enroll in the applicable enlisted professional military education distance learning course. AFPC will notify 20,000 Airmen at the beginning of each month until all members have been notified. In July 2014, the Air...
 
 

Air Force News – June 19, 2015

Poland In support of Baltic Operations 2015 June 5 through 20, a team of Airmen from the 1st Combat Communications Squadron deployed to Powidz Air Base, maintained communication requirements for the Air Force at the installation. Baltops is a multinational maritime exercise designed to enhance flexibility and interoperability. Southwest Asia Since Aug. 8, coalition airpower...
 
 

People First – June 19, 2015

Selected MSgt evals close out Sept. 30 Regular Air Force, Air National Guard and Air Force Reserve master sergeant and master sergeant-select enlisted performance reports will now close out annually on Sept. 30. In addition, as of June 3, , master sergeants and selects will no longer receive change-of-reporting-official EPRs. Enlisted Evaluation System and Weighted...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>