Business

March 27, 2012

Boeing celebrates delivery of Japan Airlines’ first two 787 Dreamliners

Tags:

Boeing photograph
A Japan Airlines 787 Dreamliner taxiing towards the runway at Paine Field in Everett, Wash. Boeing and Japan Airlines celebrated the delivery of the airline's first two 787 Dreamliners March 26. JAL is the first airline to take delivery of a 787 powered by fuel-efficient General Electric GEnx engines.

Boeing and Japan Airlines celebrated the delivery of the airline’s first two 787 Dreamliners March 26.

JAL is the first airline to take delivery of a 787 powered by fuel-efficient General Electric GEnx engines.

“Today is an important moment in our 60-year relationship with Japan Airlines as we celebrate the deliveries of not one, but two Dreamliners,” said Jim Albaugh, president and CEO of Boeing Commercial Airplanes. “The 787 will provide the fuel-efficient airplane needed to serve Japan Airlines’ growing international operations.”

Boeing photograph

Japan Airlines President Yoshiharu Ueki, left, and Boeing Commercial Airplanes President and CEO Jim Albaugh cut the ribbon at a delivery ceremony in Everett, Wash.

 

The 787 Dreamliner is more efficient to operate and has lower fuel use compared with today’s similarly sized airplanes because of use of light weight composites and advancements in systems, engines and aerodynamics.

“JAL will be the first airline to start new routes that have never been flown before by taking full advantage of the efficiencies of this aircraft, starting with Boston service next month and San Diego later this year,” said Yoshiharu Ueki, president of Japan Airlines. “The 787 with GEnx engines has the performance economics that JAL is looking for to ensure route profitability, and also the enhanced in-flight comfort that our customers will be delighted with.”

Japan Airlines ceremonially took possession of the 787 Dreamliner at a celebration with Japanese Taiko drummers and a dramatic airplane unveiling earlier this morning. Guests from Boeing, Japan Airlines and General Electric attended.

Boeing photograph

The delivery ceremony in Everett, Wash. where Boeing and Japan Airlines executives unveiled JAL’s 787 Dreamliner.

 

“GE is proud that its GEnx-1B engines will power JAL’s Boeing’s 787 Dreamliner,” said Chuck Nugent, vice president and general manager of the GEnx program at GE Aviation. “The GEnx engine combines advanced technology and material to offer improved fuel efficiency, reduced emissions and less noise to benefit our operators.”

The Boeing 787 Dreamliner is an all-new airplane featuring a host of technologies that provide exceptional value to airlines and unparalleled levels of comfort to passengers. It is the first mid-size airplane capable of flying long-range routes, enabling airlines to open new, non-stop routes preferred by the traveling public.




All of this week's top headlines to your email every Friday.


 
 

 
Lockheed Martin photograph

Lockheed Martin successfully tests design changes for Orion spacecraft’s fairing separation system

Lockheed Martin photograph A protective panel for Orion’s service module is jettisoned during testing at Lockheed Martin’s Sunnyvale, California facility. This test series evaluated design changes to the spacecraft’s fair...
 
 

Australian company to provide parts for initial production of Triton UAS

Northrop Grumman has awarded the first Australian supplier contract for the U.S. Navy’s MQ-4C Triton unmanned aircraft system initial production lot to Ferra Engineering. Brisbane-based Ferra Engineering will manufacture mechanical sub-assemblies for the first four Triton air vehicles including structural components. “At Northrop Grumman it’s very important to not only develop...
 
 

Insitu awarded LRIP Lot IV RQ-21A Blackjack Systems contract

Under the terms of its latest contract, Insitu will build six RQ-21A Blackjack systems for the U.S. Navy and Marine Corps. The $78-million Small Tactical Unmanned Aircraft Systems Lot IV Low Rate Initial Production contract is the latest event in the program’s progression toward the Initial Operational Test and Evaluation phase.   “This award will...
 

 
LM-C5

Lockheed Martin delivers 29th C-5M Super Galaxy

The 29th Lockheed Martin C-5M Super Galaxy takes off on its delivery flight.  Lockheed Martin delivered the 29th C-5M Super Galaxy to the U. S. Air Force July 28. A Defense Contract Management Agency (DCMA) aircrew ferried the...
 
 

Northrop Grumman successfully delivers deformable mirror for world’s largest solar telescope

The world’s largest ground-based solar telescope is one step closer to operation with the acceptance of the deformable mirror engineered by AOA Xinetics, a Northrop Grumman company. The Daniel K. Inouye Solar Telescope, currently under construction on Haleakala on the island of Maui, Hawaii, will offer unprecedented high-resolution images of the sun using the latest...
 
 

Raytheon appoints president, Integrated Defense Systems

Raytheon Chairman and CEO Thomas A. Kennedy announced July 30 the appointment of Wesley D. Kremer as President, Integrated Defense Systems, effective immediately. Kremer, 50, previously served as vice president of the Air and Missile Defense Systems product line of Raytheon Missile Systems. He succeeds Daniel J. Crowley, who informed the company of his intention...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>