Business

March 27, 2012

Boeing celebrates delivery of Japan Airlines’ first two 787 Dreamliners

Tags:

Boeing photograph
A Japan Airlines 787 Dreamliner taxiing towards the runway at Paine Field in Everett, Wash. Boeing and Japan Airlines celebrated the delivery of the airline's first two 787 Dreamliners March 26. JAL is the first airline to take delivery of a 787 powered by fuel-efficient General Electric GEnx engines.

Boeing and Japan Airlines celebrated the delivery of the airline’s first two 787 Dreamliners March 26.

JAL is the first airline to take delivery of a 787 powered by fuel-efficient General Electric GEnx engines.

“Today is an important moment in our 60-year relationship with Japan Airlines as we celebrate the deliveries of not one, but two Dreamliners,” said Jim Albaugh, president and CEO of Boeing Commercial Airplanes. “The 787 will provide the fuel-efficient airplane needed to serve Japan Airlines’ growing international operations.”

Boeing photograph

Japan Airlines President Yoshiharu Ueki, left, and Boeing Commercial Airplanes President and CEO Jim Albaugh cut the ribbon at a delivery ceremony in Everett, Wash.

 

The 787 Dreamliner is more efficient to operate and has lower fuel use compared with today’s similarly sized airplanes because of use of light weight composites and advancements in systems, engines and aerodynamics.

“JAL will be the first airline to start new routes that have never been flown before by taking full advantage of the efficiencies of this aircraft, starting with Boston service next month and San Diego later this year,” said Yoshiharu Ueki, president of Japan Airlines. “The 787 with GEnx engines has the performance economics that JAL is looking for to ensure route profitability, and also the enhanced in-flight comfort that our customers will be delighted with.”

Japan Airlines ceremonially took possession of the 787 Dreamliner at a celebration with Japanese Taiko drummers and a dramatic airplane unveiling earlier this morning. Guests from Boeing, Japan Airlines and General Electric attended.

Boeing photograph

The delivery ceremony in Everett, Wash. where Boeing and Japan Airlines executives unveiled JAL’s 787 Dreamliner.

 

“GE is proud that its GEnx-1B engines will power JAL’s Boeing’s 787 Dreamliner,” said Chuck Nugent, vice president and general manager of the GEnx program at GE Aviation. “The GEnx engine combines advanced technology and material to offer improved fuel efficiency, reduced emissions and less noise to benefit our operators.”

The Boeing 787 Dreamliner is an all-new airplane featuring a host of technologies that provide exceptional value to airlines and unparalleled levels of comfort to passengers. It is the first mid-size airplane capable of flying long-range routes, enabling airlines to open new, non-stop routes preferred by the traveling public.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>