Business

March 27, 2012

Boeing celebrates delivery of Japan Airlines’ first two 787 Dreamliners

Tags:

Boeing photograph
A Japan Airlines 787 Dreamliner taxiing towards the runway at Paine Field in Everett, Wash. Boeing and Japan Airlines celebrated the delivery of the airline's first two 787 Dreamliners March 26. JAL is the first airline to take delivery of a 787 powered by fuel-efficient General Electric GEnx engines.

Boeing and Japan Airlines celebrated the delivery of the airline’s first two 787 Dreamliners March 26.

JAL is the first airline to take delivery of a 787 powered by fuel-efficient General Electric GEnx engines.

“Today is an important moment in our 60-year relationship with Japan Airlines as we celebrate the deliveries of not one, but two Dreamliners,” said Jim Albaugh, president and CEO of Boeing Commercial Airplanes. “The 787 will provide the fuel-efficient airplane needed to serve Japan Airlines’ growing international operations.”

Boeing photograph

Japan Airlines President Yoshiharu Ueki, left, and Boeing Commercial Airplanes President and CEO Jim Albaugh cut the ribbon at a delivery ceremony in Everett, Wash.

 

The 787 Dreamliner is more efficient to operate and has lower fuel use compared with today’s similarly sized airplanes because of use of light weight composites and advancements in systems, engines and aerodynamics.

“JAL will be the first airline to start new routes that have never been flown before by taking full advantage of the efficiencies of this aircraft, starting with Boston service next month and San Diego later this year,” said Yoshiharu Ueki, president of Japan Airlines. “The 787 with GEnx engines has the performance economics that JAL is looking for to ensure route profitability, and also the enhanced in-flight comfort that our customers will be delighted with.”

Japan Airlines ceremonially took possession of the 787 Dreamliner at a celebration with Japanese Taiko drummers and a dramatic airplane unveiling earlier this morning. Guests from Boeing, Japan Airlines and General Electric attended.

Boeing photograph

The delivery ceremony in Everett, Wash. where Boeing and Japan Airlines executives unveiled JAL’s 787 Dreamliner.

 

“GE is proud that its GEnx-1B engines will power JAL’s Boeing’s 787 Dreamliner,” said Chuck Nugent, vice president and general manager of the GEnx program at GE Aviation. “The GEnx engine combines advanced technology and material to offer improved fuel efficiency, reduced emissions and less noise to benefit our operators.”

The Boeing 787 Dreamliner is an all-new airplane featuring a host of technologies that provide exceptional value to airlines and unparalleled levels of comfort to passengers. It is the first mid-size airplane capable of flying long-range routes, enabling airlines to open new, non-stop routes preferred by the traveling public.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines March 27, 2015

News General Dynamics withdraws as T-100 prime contractor General Dynamics Information Systems and Technology has withdrawn itself as the prime contractor on the T-100, the offering for the T-X trainer replacement program based on the Alenia Aermacchi M-346 design.   Business SpaceX’s fight with U.S. Air Force called a clash of perceptions Billionaire Elon Musk’s...
 
 

News Briefs March 27, 2015

Contractor extradited from Iraq pleads guilty in bribes case A man extradited from Iraq in a military contract bribery case has pleaded guilty to three charges in an agreement with federal prosecutors. U.S. District Judge Thomas Rose has scheduled sentencing for July 1 for Metin Atilan. His attorney, Nick Gounaris, says the two sides agreed...
 
 

Ninth Boeing GPS IIF reaches orbit, sends first signals

Boeing Global Positioning System (GPS) IIF satellites are steadily replenishing the orbiting constellation, continuing to improve reliability and accuracy for users around the world. The ninth GPS IIF reached orbit about three hours, 20 minutes after launching today aboard a United Launch Alliance (ULA) Delta IV rocket from Cape Canaveral Air Force Station, Fla., and...
 

 

F-35 Lightning II costs drop, report shows

A recent account of F-35 Lightning II aircraft program costs shows decreases, the Air Force’s F-35 program executive officer told reporters in a media roundtable March 24, 2015. Lt. Gen. Christopher C. Bogdan, citing this year’s selected acquisition report on the aircraft, called the roundtable to clarify cost and performance facts. He also acknowledged the...
 
 
NG-growler2

Northrop Grumman delivers center/aft ‘shipset’ for first international EA-18G Growler

Northrop Grumman photograph Northrop Grumman mechanics perform final quality inspections on the center/aft fuselage shipset produced by the company for the first Australian EA-18G Growler. The subassembly will be delivered to B...
 
 
Navy photograph by Monica McCoy

Navy conducts production acceptance test of Tomahawk missile

Navy photograph by Monica McCoy Members of the Explosive Ordnance Disposal Technology Division team at Naval Surface Warfare Center, Indian Head prepare a Tomahawk missile for a functional ground test at the Large Motor Test Fa...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>