Business

March 28, 2012

Boeing completes programmed depot maintenance on third KC-135E for Chile

Boeing delivered the last of the Chilean Air Force’s three KC-135E Stratotankers March 9 after all the aircraft completed Programmed Depot Maintenance in San Antonio, Texas.

The final aircraft arrived at Boeing’s San Antonio facility in June for the maintenance work, which included a variety of depot-level inspections, repairs, maintenance, modification and repainting.

The KC-135E was flown to Santiago, Chile, by a crew from the U.S. Defense Contract Management Agency’s 313th Flight Test Squadron.

“Boeing worked with the Chilean Air Force to incorporate lessons learned on the first and second aircraft to deliver the final KC-135 and return it to doing what it does best,” said Mike Wright, Boeing KC-135 program director. “This highly dependable aircraft is a critical resource to Chile for refueling missions and humanitarian assistance.”

KC-135 aircraft receive PDM after five years of service or 20,000 hours of flight time. Boeing has been performing PDM for the U.S. Air Force and other international customers at its San Antonio facility since 1998.

“Boeing continues to make significant investments in Lean processes that dramatically accelerate turnaround time, decrease cost and improve quality to better serve our customer,” said Wright.

The first Chilean Air Force KC-135 to go through PDM was delivered on Feb. 18, 2010, a week before an 8.8-magnitude earthquake hit Chile. The aircraft was immediately put into use to conduct humanitarian missions. Delivery of the second aircraft took place on Aug. 30, 2011, one day before the KC-135 marked its 55th anniversary of first flight.

The Chilean government purchased three KC-135 E-model aircraft on July 8, 2009, through the U.S. Air Force Foreign Military Sales Office at Tinker Air Force Base, Okla.




All of this week's top headlines to your email every Friday.


 
 

 

Northrop, Navy celebrate legacy of EA-6B Prowler

Northrop Grumman photograph by Edgar Mills The U.S. Navy’s last operational EA-6B Prowler, designed and built by Northrop Grumman, lifts off from Naval Air Station Whidbey Island, Wash. in a ceremonial fly-away June 27 from its long time operational base. The Navy is retiring the Prowler after nearly 45 years of service.   The U.S....
 
 

Lockheed signs agreements for two full-flight simulators

Lockheed Martin Commercial Flight Training and Airbus have signed a frame contract enabling Airbus to expedite procurement of flight simulation devices for their customers, Airbus training centers and their affiliates worldwide. The frame contract emphasizes the shared intent to partner on future training programs, and combines Airbus’ and Lockheed Martin Commercial Flight Training’s expert...
 
 

Drone Aviation receives order for U.S. Army aerostat system enhancement

Drone Aviation Holding Corp., a developer of specialized lighter-than-air aerostats and tethered drones, announced June 24 that its wholly owned subsidiary, Drone Aviation Corp., has been awarded an order from U.S. Government prime contractor BAE Systems for parts and services related to enhancing and supporting two WASP aerostat systems owned and operated by the U.S....
 

 

Boeing names Muilenburg as chief executive officer

The Boeing board of directors has elected Dennis A. Muilenburg the company’s 10th chief executive, succeeding W. James (Jim) McNerney, Jr., who held the position for the past 10 years. Muilenburg, who has served as Boeing president and chief operating officer since 2013, becomes president and CEO July 1. McNerney, who joined Boeing’s board of...
 
 
boeing-thailand

Boeing, Thai Airways International celebrate 25th direct 777 delivery

  Boeing and Thai Airways International Public Company Limited celebrated the Thailand flag carrier’s 25th direct 777 delivery, a 777-300ER (Extended Range), from the Boeing delivery center in Everett, Wash.  “...
 
 

General Dynamics receives $219 million for U.S. Army’s WIN-T increment 2 systems

General Dynamics received the first full rate production order from the U.S. Army to build additional Warfighter Information Network – Tactical (WIN-T) Increment 2 systems.  The $219 million order includes the production of more than 300 vehicle-based network communication nodes along with related equipment and materials. WIN-T Increment 2 is the Army’s communications backbone providin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>