Business

April 3, 2012

Raytheon awarded United Kingdom Paveway IV replenishment contract


The United Kingdom’s Ministry of Defence has awarded Raytheon UK a replenishment contract for Paveway IV, the latest generation GPS precision-guided munition, as part of a 60 million pound contract.

Raytheon UK is focused on a technological growth path which, under the UK MOD’s SPEAR (Selective Precision Effects at Range) CAP 1 program, will enhance the system’s capability with low collateral and penetrator warhead options, enhanced moving target capability and enhanced range.

“Raytheon UK has provided flexible and responsive support to Paveway operations over a considerable period; in particular, their outstanding efforts were key to the RAF success in the recent Libyan campaign where the Paveway series of weapons were used extensively,” said Wing Commander Clive Roads, IGMR FreeFall IPT Leader. “The MOD is extremely pleased to work with a company which understands the operational imperative, placing this first in their support to our Forces. Raytheon UK have been able to react very quickly to the need to replenish our stocks of the high precision, all weather, Paveway IV weapon system to maintain our ability to react at short notice to emerging threats. The weapon has now been extensively used in all types of employment roles and has proven to exceed all expectations for reliability, accuracy and its ability to limit collateral damage through its sophisticated and integrated guidance, and fuzing systems.”

Paveway IV is a UK manufacturing success story, with many companies across the UK involved in the development and manufacture of advanced components. Benefiting from the current contract are Portsmouth Aviation, who manufacture the tail system; Thales Missile Electronics, based in Basingstoke, who produce the all-electronic Aurora fuze; and EDO MBM of Brighton, who will manufacture the aircraft’s umbilical interconnect system and containers. As a result of Raytheon undertaking long lead-time procurement and working with its supply chain, the delivery schedule has been reduced to seven months from 18 months.

Bob Delorge, chief executive of Raytheon UK, commented: “The Paveway IV contract sustains highly skilled jobs in the United Kingdoms advanced manufacturing arena and is one of the UK’s leading examples of technology transfer success. A pivotal element of the RAF’s air-to-surface target engagement capability, Paveway IV enhances the nation’s military capability and has been the precision-guided bomb of choice for the Royal Air Force since 2008.”

Raytheon continues to pursue a number of export opportunities for Paveway IV, particularly where Typhoon and Tornado are deployed and the weapon is already integrated. Raytheon is also under contract to integrate Paveway IV for the UK onto the Joint Strike Fighter aircraft.

At current exchange rates of roughly $1.6 to the pound, 60 million pounds converts to approximately $96 million; and 10 million pounds converts to approximately $16 million.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>