U.S.

April 26, 2012

Boeing opens new navigation system repair line at Ohio facility

Boeing marked the opening April 26 of a new Electrostatically Supported Gyro repair line at the company’s Heath, Ohio, facility.

The new line increases the capability of the skilled workforce and equipment already in place for the repair and maintenance of the U.S. Navy’s Electrostatically Supported Gyro Navigator (ESGN, or Trident Navigation System).

“As the sole supplier of navigators for the U.S. Navy’s ballistic missile submarine fleet, we believe this new line will allow for a long-range sustainable advantage in product maintenance while we develop the next generation of ultra-high-precision inertial systems,” said Joe Carlin, vice president of Boeing subsidiary Argon ST.

A key component of all Navy Trident submarines, the ESGN, which started production more than three decades ago, is the world’s most accurate inertial navigation system. The new facility includes approximately 14,000 square feet of space dedicated to the ESG Stable Platform Housing refurbishment and test program, as well as space for modification, repair, maintenance and storage.

“Ohio class submarines have been patrolling the world’s oceans with the Trident II (D5) missile system for 30 years, serving as a credible strategic deterrence against enemies,” said Rear Admiral Terry J. Benedict, director of the U.S. Navy’s Strategic Systems Programs. “The Electrostatically Supported Gyro Navigator has successfully supported this mission by supplying the Trident Weapon System with critical information.”

Today’s event also celebrated Boeing’s commitment to the Heath community. Boeing made $4 million in improvements and upgrades at the facility, which also received investments from the Ohio Department of Development, the Heath-Newark-Licking County Port Authority, and American Electric Power. The Heath facility is Boeing’s Center of Excellence for maintenance, repair and overhaul of guidance and navigation systems, inertial instruments and platforms.

Under the current contract, Argon ST employees are scheduled to conduct ESG repair and maintenance at the facility until 2025.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines September 15, 2014

News: Navy identifies pilot presumed dead in crash - A Navy fighter pilot presumed dead after two fighter jets crashed in the far western Pacific Ocean has been identified.   Business: Boeing eyes 737-700 solution for new JSTARS - Boeing is officially planning a variant of its 737-700 commercial jetliner as a competitor for the Air Force’s...
 
 

News Briefs September 15, 2014

Australia contributing planes for anti-IS campaign Australia is preparing to contribute 600 troops and up to 10 military aircraft to the increasingly aggressive campaign against the Islamic State extremists in Syria and Iraq, Prime Minister Tony Abbott said Sept. 14. Abbott said Australia was responding to a formal request from the United States for specific...
 
 
Courtesy graphic

Lockheed Martin conducts flight tests of aircraft laser turret for DARPA

AFRL photograph The Aero-adaptive Aero-optic Beam Control turret that Lockheed Martin is developing for the Defense Advanced Research Projects Agency and the Air Force Research Laboratory has completed initial flight testing. T...
 

 

Lockheed Martin advances live, virtual, constructive training in flight test

https://www.youtube.com/watch?feature=player_embedded&v=jvXmOW8L3mU Lockheed Martin successfully tested a new solution for integrated live, virtual and constructive training during a flight demonstration at the company’s Aeronautics facility in Fort Worth, Texas. During the flight test, a pilot flying in a live F-16 engaged in a synthetic training exercise with a pilot flying as wing...
 
 
Image courtesy of NASA/JPL-Caltech/Univ. of Arizona

NASA’s Mars Curiosity rover arrives at Martian mountain

NASA’s Mars Curiosity rover has reached the Red Planet’s Mount Sharp, a Mount-Rainier-size mountain at the center of the vast Gale Crater and the rover mission’s long-term prime destination. “Curiosity n...
 
 

Raytheon begins full rate production on TALON Laser Guided Rockets

Under a $117 million contract awarded to Raytheon, Raytheon Missile Systems has begun production of the TALON Laser Guided Rocket. In 2013, the Armed Forces General Headquarters of the United Arab Emirates awarded Tawazun a contract to procure the TALON Laser Guided Rocket. “Full rate production of the TALON LGR is a significant milestone for...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>