Business

April 30, 2012

Boeing rolls out first 787 Dreamliner built in South Carolina

The first Boeing 787 Dreamliner to be assembled in South Carolina rolled out of final assembly April 27 to great fanfare from the crowd of nearly 7,000 Boeing employees and invited guests.

The festival-like atmosphere, featuring aerial displays, music and entertainment, was a fitting celebration to commemorate assembly completion of the first 787 built at the North Charleston, S.C., facility.

The airplane’s rollout marks the first time that a Boeing commercial airplane has been produced in the Southeastern United States. “This is a proud moment for Boeing as we roll out an airplane from our third final assembly site,” said Jim Albaugh, president and chief executive officer, Commercial Airplanes. “Today I welcome the South Carolina team into a small and elite fraternity – a fraternity of workers who have built one of the most complex machines in the world – a commercial airplane.”

Boeing announced that it had selected North Charleston, S.C., as the location for the second 787 final assembly line on Oct. 28, 2009, and broke ground on the site in November of that year. The South Carolina final assembly facility was completed in June 2011, and production began later that same month.

“Every one of our South Carolina teammates should be extremely proud of this historic accomplishment,” said Jack Jones, Boeing South Carolina vice president and general manager. “This team has shown that we can build airplanes in South Carolina that meet the high Boeing quality standards, and do so with an exceptional workplace safety record.”

The airplane next goes to the flight line, where it will go through systems checks and engine runs in advance of taxi testing and first flight. The airplane remains on schedule for delivery to Air India in mid-2012.

“We’ll celebrate today, and tomorrow we begin the process of getting the airplane ready for delivery to our Air India customer,” said Jones. “What this team continues to achieve is remarkable, and is the result of the team’s energy and dedication, as well as the great partnerships with the Boeing enterprise, Commercial Airplanes, the 787 Dreamliner program, our suppliers, local community and the state of South Carolina. It’s the outstanding support we’ve received from each one of these groups that has made this day possible.”

Boeing South Carolina also has responsibility for fabrication, integration and assembly of the 787’s midbody and aftbody fuselage sections. Once complete, the fuselage sections are either delivered to the South Carolina Final Assembly facility, or transported via the Dreamlifter to Final Assembly in Everett, Wash.

 




All of this week's top headlines to your email every Friday.


 
 

 

News Briefs February 27, 2015

Ukraine will start pulling back heavy weapons in the east Ukraine’s military says it will start pulling back its heavy weapons from the front line with Russian-backed separatists as required under a cease-fire agreement. The Defense Ministry said in a statement Feb. 26 that it reserved the right to revise its withdrawal plans in the...
 
 

Northrop Grumman’s AstroMesh reflector successfully deploys for NASA’s SMAP satellite

The NASA Jet Propulsion Laboratory successfully deployed the mesh reflector and boom aboard the Soil Moisture Active Passive spacecraft, a key milestone on its mission to provide global measurements of soil moisture. Launched Jan. 31, SMAP represents the future of Earth Science by helping researchers better understand our planet. SMAP’s unmatched data capabilities are enabled...
 
 
NASA photograph by Brian Tietz

NASA offers space tech grants to early career university faculty

NASA photograph by Brian Tietz Tensegrity research is able to simulate multiple forms of locomotion. In this image, a prototype tensegrity robot reproduces forward crawling motion. NASA’s Space Technology Mission Director...
 

 
navy-china

USS Fort Worth conducts CUES with Chinese Navy

The littoral combat ship USS Fort Worth (LCS 3) practiced the Code for Unplanned Encounters at Sea (CUES) with the People’s Liberation Army-Navy Jiangkai II frigate Hengshui (FFG 572) Feb. 23 enhancing the professional ma...
 
 

AEGIS tracks, simulates engagement of three short-range ballistic missiles

The Missile Defense Agency and sailors aboard the guided-missile destroyers USS Carney (DDG 64), USS Gonzalez (DDG 66), and USS Barry (DDG 52) successfully completed a flight test involving the Aegis Ballistic Missile Defense weapon system. At approximately 2:30 a.m., EST, Feb. 26, three short-range ballistic missile targets were launched near simultaneously from NASA’s Wallops...
 
 

DOD seeks novel ideas to shape its technological future

The Defense Department is seeking novel ideas to shape its future, and officials are looking to industry, small business, academia, start-ups, the public – anyone, really – to boost its ability to prevail against adversaries whose access to technology grows daily. The program, called the Long-Range Research and Development Plan, or LRRDP, began with an...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>