Business

April 30, 2012

Boeing rolls out first 787 Dreamliner built in South Carolina

The first Boeing 787 Dreamliner to be assembled in South Carolina rolled out of final assembly April 27 to great fanfare from the crowd of nearly 7,000 Boeing employees and invited guests.

The festival-like atmosphere, featuring aerial displays, music and entertainment, was a fitting celebration to commemorate assembly completion of the first 787 built at the North Charleston, S.C., facility.

The airplane’s rollout marks the first time that a Boeing commercial airplane has been produced in the Southeastern United States. “This is a proud moment for Boeing as we roll out an airplane from our third final assembly site,” said Jim Albaugh, president and chief executive officer, Commercial Airplanes. “Today I welcome the South Carolina team into a small and elite fraternity – a fraternity of workers who have built one of the most complex machines in the world – a commercial airplane.”

Boeing announced that it had selected North Charleston, S.C., as the location for the second 787 final assembly line on Oct. 28, 2009, and broke ground on the site in November of that year. The South Carolina final assembly facility was completed in June 2011, and production began later that same month.

“Every one of our South Carolina teammates should be extremely proud of this historic accomplishment,” said Jack Jones, Boeing South Carolina vice president and general manager. “This team has shown that we can build airplanes in South Carolina that meet the high Boeing quality standards, and do so with an exceptional workplace safety record.”

The airplane next goes to the flight line, where it will go through systems checks and engine runs in advance of taxi testing and first flight. The airplane remains on schedule for delivery to Air India in mid-2012.

“We’ll celebrate today, and tomorrow we begin the process of getting the airplane ready for delivery to our Air India customer,” said Jones. “What this team continues to achieve is remarkable, and is the result of the team’s energy and dedication, as well as the great partnerships with the Boeing enterprise, Commercial Airplanes, the 787 Dreamliner program, our suppliers, local community and the state of South Carolina. It’s the outstanding support we’ve received from each one of these groups that has made this day possible.”

Boeing South Carolina also has responsibility for fabrication, integration and assembly of the 787′s midbody and aftbody fuselage sections. Once complete, the fuselage sections are either delivered to the South Carolina Final Assembly facility, or transported via the Dreamlifter to Final Assembly in Everett, Wash.

 




All of this week's top headlines to your email every Friday.


 
 

 

Boeing announces SF Airlines order for Boeing converted freighters

Boeing announced Oct. 23 that SF Airlines has placed an order for an undisclosed number of 767-300ER passenger-to-freighter conversions (Boeing Converted Freighters). SF Airlines, a subsidiary of Shenzhen, China-based delivery services company SF Express, will accept its first redelivered 767 in the second half of 2015. “SF Express aims to become China’s most respected and...
 
 
LM-C130

Another Super Herc Little Rock Rollin’

  Lockheed Martin delivered another C-130J Super Hercules to the 61st Airlift Squadron at Little Rock Air Force Base, Ark., Oct. 23. Little Rock AFB’s new C-130J was ferried from the Lockheed Martin Aeronautics facility ...
 
 

United Technologies beats third quarter profit expectations

United Technologies Corp. Oct. 23 reported third-quarter profit of $1.85 billion as sales increased across all its businesses and the aerospace giant reported favorable tax settlements. The Hartford, Conn.,-based company said it had profit of $2.04 per share and earnings, adjusted for non-recurring gains, came to $1.82 per share. The results topped Wall Street expectations,...
 

 

Raytheon SM-6s intercept targets in ‘engage on remote’ tests

During the U.S. Navy’s Combat Ship System Qualification Trials, the USS Chancellorsville (CG 62) tested two Raytheon Standard Missile-6 interceptors against anti-ship and cruise missile targets. As part of ‘engage on remote’ scenarios, the ship launched the SM-6 interceptors prior to its own radars ‘seeing’ the incoming threats, using targeting information from ano...
 
 

General Dynamics receives $19 million contract for submarine planning services

The U.S. Navy has awarded General Dynamics Electric Boat an $18.9 million contract modification to perform reactor-plant planning yard services for nuclear submarines and support-yard services for moored training ships. Electric Boat is a wholly owned subsidiary of General Dynamics. Initially awarded in November 2011, the contract has a potential value of $121.2 million through...
 
 

Passenger jets push Boeing’s profit up 18 percent

Robust demand for commercial jets and an increased pace of production helped Boeing earn $1.36 billion in the third quarter, up 18 percent from the same period last year. On a per-share basis, the Chicago-based company said it had a profit of $1.86. Adjusted for non-operating costs, earnings came to $2.14 per share, better than...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>