Business

April 30, 2012

Boeing rolls out first 787 Dreamliner built in South Carolina

The first Boeing 787 Dreamliner to be assembled in South Carolina rolled out of final assembly April 27 to great fanfare from the crowd of nearly 7,000 Boeing employees and invited guests.

The festival-like atmosphere, featuring aerial displays, music and entertainment, was a fitting celebration to commemorate assembly completion of the first 787 built at the North Charleston, S.C., facility.

The airplane’s rollout marks the first time that a Boeing commercial airplane has been produced in the Southeastern United States. “This is a proud moment for Boeing as we roll out an airplane from our third final assembly site,” said Jim Albaugh, president and chief executive officer, Commercial Airplanes. “Today I welcome the South Carolina team into a small and elite fraternity – a fraternity of workers who have built one of the most complex machines in the world – a commercial airplane.”

Boeing announced that it had selected North Charleston, S.C., as the location for the second 787 final assembly line on Oct. 28, 2009, and broke ground on the site in November of that year. The South Carolina final assembly facility was completed in June 2011, and production began later that same month.

“Every one of our South Carolina teammates should be extremely proud of this historic accomplishment,” said Jack Jones, Boeing South Carolina vice president and general manager. “This team has shown that we can build airplanes in South Carolina that meet the high Boeing quality standards, and do so with an exceptional workplace safety record.”

The airplane next goes to the flight line, where it will go through systems checks and engine runs in advance of taxi testing and first flight. The airplane remains on schedule for delivery to Air India in mid-2012.

“We’ll celebrate today, and tomorrow we begin the process of getting the airplane ready for delivery to our Air India customer,” said Jones. “What this team continues to achieve is remarkable, and is the result of the team’s energy and dedication, as well as the great partnerships with the Boeing enterprise, Commercial Airplanes, the 787 Dreamliner program, our suppliers, local community and the state of South Carolina. It’s the outstanding support we’ve received from each one of these groups that has made this day possible.”

Boeing South Carolina also has responsibility for fabrication, integration and assembly of the 787′s midbody and aftbody fuselage sections. Once complete, the fuselage sections are either delivered to the South Carolina Final Assembly facility, or transported via the Dreamlifter to Final Assembly in Everett, Wash.

 




All of this week's top headlines to your email every Friday.


 
 

 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 
 

Raytheon fires four TALON Laser-Guided Rockets from MD 530G helicopter

Raytheon and MD Helicopters, Inc. successfully fired four TALON laser guided rockets from the MD 530G armed aerial scout helicopter during a series of tests at Yuma Proving Ground, Ariz. “This test further demonstrates the maturity of the TALON Laser Guided Rocket weapon system as a complement to MD’s AAS platform,” said Darryl Kreitman, Raytheon...
 

 

Boeing delivers 25th C-17 training center to U.S. Air Force

Boeing recently delivered a comprehensive training center for the C-17 Globemaster III airlifter to the Memphis Air National Guard base in Tennessee, improving the service’s training capabilities while reducing travel, maintenance and other operating expenses. The highly realistic training system prepares C-17 pilots and loadmasters for a host of scenarios, including sophisticated mission...
 
 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>