Business

May 2, 2012

Goodrich delivers first composite sail cusp for Virginia Class sub

Goodrich Corporation recently delivered its first composite sail cusp to Newport News Shipbuilding, a division of Huntington Ingalls Industries.

Goodrich is under contract to manufacture lightweight, composite sail cusps for the next eight Virginia Class nuclear fast attack submarines, collectively referred to as Block III. Fabrication of all eight sail cusps will occur at Goodrich’s Engineered Polymer Products facility in Jacksonville, Fla.

The sail cusp is a single-piece composite fairing attached to the hull and lower leading edge of the submarine sail (the vertical fin on top of the hull). The complex double curvature shape of this lightweight structure allows for smooth laminar flow of water over its surface, thereby improving hydrodynamic performance of the submarine.

“This delivery represents the first production composite sail cusp that is a lightweight, low maintenance alternative to steel that helps reduce the acquisition cost for Virginia Class submarines,” said Marc Duvall, president, Goodrich Aerostructures. “Our engineering and manufacturing teams worked closely together throughout the production cycle to ensure on-time delivery.”

The Virginia Class submarine is the U.S. Navy’s newest nuclear fast-attack submarine class. It was designed from the keel up for the full range of mission requirements in the post-Cold War era, including anti-submarine and surface ship warfare; delivering special operation forces; strike; intelligence, surveillance and reconnaissance; irregular warfare; and mine warfare.

Goodrich’s Engineered Polymer Products team specializes in developing, manufacturing, testing and servicing acoustic and structural composite products. The division’s technology is in use in both military and commercial applications.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 24, 2015

News: More than $1 billion in U.S. emergency reconstruction aid goes missing in Afghanistan - A total of $1.3 billion that the Pentagon shipped to its force commanders in Afghanistan between 2004 and 2014 for the most critical reconstruction projects can’t be accounted for by the Defense Department, 60 percent of all such spending under an...
 
 

News Briefs April 24, 2015

German defense minister: widely used rifle has no future A widely used assault rifle has “no future” with the German military in its current form, Germany’s defense minister said April 22, escalating a dispute over the weapon’s alleged shortcomings. Ursula von der Leyen said last month that a study showed the G36 rifle has a...
 
 
Army photograph

Composites key to tougher, lighter armaments

Army photograph XM-360 test firing at Aberdeen Proving Ground, Md., in 2007, is shown. The Army is on the cusp of revolutionizing materials that go into armament construction, making for stronger, lighter and more durable weapo...
 

 

Northrop Grumman signs long-term agreement with Raytheon

Northrop Grumman has entered a long-term agreement with Raytheon to supply its LN-200 Inertial Measurement Unit for Raytheon optical targeting systems. The long-term agreement with Raytheon’s Space and Airborne Systems business extends through 2018. The LN-200 provides camera stabilization on optical targeting systems that conduct long-range surveillance and target acquisition for various...
 
 

NTTR supports first F-35B integration into USMC’s weapons school exercise

The Nevada Test and Training Range was part of history April 21, when four U.S. Marine Corps-assigned F-35B Lightning IIs participated in its first Marine Corps’ Final Exercise of the Weapons and Tactics Instructor course on the NTTR’s ranges. The Final Exercise, or FINEX, is the capstone event to the U.S. Marine Corps Marine Aviation...
 
 
AAR-Textron

AAR awarded new contract from Bell Helicopter Textron to support T64 engines

AAR announced April 22 that Bell Helicopter Textron Inc. awarded its Defense Systems & Logistics business unit a contract providing warehouse and logistics services in support of upgrading T64 engines for the Bell V-280 Val...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>