Business

May 2, 2012

Pratt & Whitney delivers 50th F135 engine for JSF

Pratt & Whitney has successfully delivered the 50th production F135 engine – powering Lockheed Martin’s fifth-generation F-35 Lightning II – to the U.S. Department of Defense.

Pratt & Whitney is a United Technologies Corp.

The 50th engine is scheduled to be installed in a F-35C Carrier Variant for the United States Navy. The F-35C aircraft will be delivered to Eglin Air Force Base, Fla., this summer for Navy pilot training.

“Delivery of the 50th production F135 engine is a significant milestone for the program,” said Chris Flynn, vice president, F135/F119 Engine Programs, Pratt & Whitney. “We are proud of the progress made on the most advanced fifth-generation fighter engine in the world. We will continue to work diligently toward production and testing benchmarks while meeting our cost objectives.”

Pratt & Whitney remains committed to increasing production levels while decreasing costs. To date, Pratt & Whitney and its suppliers have been able to reduce the cost by more than 25 percent on the CV/Conventional Takeoff and Landing engine, compared to the original test engines. Engine production output in 2012 is expected to double from 2011, as was demonstrated from 2010 to 2011.

The F-35 program includes three variants to meet the unique needs of the U.S. armed forces and the international participants in the program: the CV, the CTOL and the Short Takeoff and Vertical Landing. To date, the F135 propulsion system has powered more than 330 vertical landings, 2,000 test flights producing more than 3,000 flight hours. Pratt & Whitney has delivered 30 CTOL/CV and 20 STOVL engines and related propulsion system hardware. The success of the F135 engine program validates the reliability, safety and performance of the engine.

Included in the 50 deliveries was the last deliverable hardware required for the third lot of Low Rate Initial Production engines. Pratt & Whitney is now delivering to the fourth lot of LRIP contract requirements that are scheduled for completion by the end of 2012.

Pratt & Whitney has designed, developed and tested the F135 to deliver the most advanced fifth-generation fighter engine for the United States and its allies around the world. Pratt & Whitney is a world leader in the design, manufacture and service of aircraft engines, space propulsion systems and industrial gas turbines. United Technologies, based in Hartford, Conn., is a diversified company providing high technology products and services to the global aerospace and building industries.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines May 17, 2013

News One dead in U.S. Navy SEAL training accident at Fort Knox A U.S. Navy enlisted man was killed and as many as seven people were injured when their Humvee vehicle rolled over during a training exercise for elite SEAL forces at Fort Knox, Kentucky, a SEAL spokesman said May 17. Obama to announce major...
 
 

News Briefs May 17, 2013

U.S. military deaths in Afghanistan at 2,085 As of May 14, 2013, at least 2,085 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,727 military service members have died in Afghanistan as a result...
 
 
boeing-india

First Boeing P-8I maritime patrol aircraft arrives in India

The first Boeing P-8I long-range maritime reconnaissance and anti-submarine warfare aircraft arrived May 15, on schedule, at India Naval Station Rajali. The P-8I is one of eight aircraft Boeing is building for India as part of ...
 

 

2001 authorization still legal basis for war, leaders say

The 2001 Authorization for the Use of Military Force remains viable more than a decade after its passing, a panel of defense leaders told Congress May 16. The authorization empowers the president ìto use all necessary and appropriate force against those nations, organizations, or persons he determines planned, authorized, committed, or aided the terrorist attacks...
 
 

Army supports president’s request for 2015 BRAC round

As the Army cuts the number of soldiers in its ranks, there will be an excess of infrastructure in place that used to support those soldiers. Maintaining that extra unused infrastructure could mean other critical Army programs will suffer, said a senior official. “A future round of base realignment and closure, or BRAC, in the...
 
 

Missile defense system completes successful intercept test

The Missile Defense Agency and Navy sailors aboard the USS Lake Erie conducted a successful flight test of the Aegis Ballistic Missile Defense system May 15, Pentagon officials reported. In the test, the Aegis Ballistic Missile Defense 4.0 weapon system and a Standard Missile 3 Block IB missile intercepted a separating ballistic missile target over...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>