Tech

May 3, 2012

Tablet PC to replace paper for Network Integration Evaluation

Tags:
by John Andrew Hamilton
White Sands Missile Range, N.M.
Army photogrpah by John Andrew Hamilton
Gilbert Sanchez, a computer technician with Advanced Systems Development on White Sands Missile Range, N.M., readies new tablets for use by data collectors during the Network Integration Evaluation.

The U.S. Army Test and Evaluation Command is beginning to replace paper with digital data collection options in preparation for the next Network Integration Evaluation at White Sands Missile Range, N.M., this May.

NIE’s are large-scale evaluation events designed to mature the Army’s tactical network, a wireless computer network that provides the soldier with new and improved methods of communication.

Part of the Army’s agile acquisition process, the evaluation takes systems, devices and other equipment under consideration and places them in the hands of soldiers from the 2nd Brigade Combat Team, 1st Armored Division, under the Brigade Modernization Command.

Over the course of the evaluation, which is the largest of its kind, soldiers take the systems and attempt to use them as they would during actual operations in theater. Data collected from the systems’ performances can then be given to Army leaders, allowing decision makers to more rapidly determine if a system is ready for use, in need of further development, or in need of cancellation.

One of the challenges of this data collection process is accurate test officer observations and timely soldier feedback. NIE evaluations can easily fill an entire day with Soldiers and test officers conducting missions, troubleshooting systems under evaluation, and coordinating solutions with system developers.

Under the previous system, soldiers and test officers would have to write down their observations and notes by hand in the field and then transcribe them into a computerized database at the end of the day.

“The idea behind the tablets is saving time for the user,” said Maj. Bradley Stremlau, an evaluation officer with ATEC’s Army Evaluation Center. “In the old days we just had pen and paper and the Soldiers and test officers were just writing their observations down, and they’d still have to go to a network kiosk and input all this data. So you would have 20, 30 or 40 pages of notes you’d have to input.”

After a long summer day of operations in the New Mexico desert, sitting down at a computer late at night to accurately copy over notes can be daunting. Using the tablets, data collectors can instead just visit the nearest network kiosk and upload their day’s notes.

“There are going to be eight kiosks, or data collection sites, up range through the NIE, all throughout the range, and the object of the game is, the Soldiers or data collectors will take their tablet to this kiosk, hook it up to the network and then download their day’s work,” said Fil Macias, chief of the networks and control division of the Systems Integration Directorate.

As White Sands Missile Range is currently installing a wireless test network for the range, it’s expected that eventually the kiosks will be able to be reduced in number or eliminated as well, replaced with the wireless network and data collection apps.

“Hopefully in the future as our wireless capabilities come up they’ll be able to drive by and the tablet will pick up the signal and download the information automatically,” Macias said.

While the tablets aren’t a system being formally tested as part of the NIE, White Sands Missile Range engineers are going to be looking at the tablets’ performance to see where else on the range they could apply similar technology.

“When we started, engineers being engineers, we wanted an Android app or an Apple app. We’re not there yet,” Macias said. “But as we progress eventually we’ll make those services; eventually we’ll have those on our cloud. The exciting thing about this program is it provides an actual application and provides a trajectory for the future.”

It’s expected that eventually the tablets could become standard issue for many of White Sands Missile Range’s data collectors, even those not working on NIE projects.

The tablets will be taking this summer’s NIE by storm, having already been issued to the NIE’s other major players at Army Materiel Command, the System of Systems Integration Directorate, and ATEC’s Operational Test Command.

“We’re working with a lot of different communities. We’re working with Army Materiel Command, Brigade Modernization Command, Information Technology Engineering Directorate, System of Systems Integration, White Sands Missile Range Materiel Test, and we proved that ATEC as an enterprise can function,” Macias said.

To ensure that all the personnel from the different NIE organizations are prepared to use the new devices, more than 150 of them were shipped out of White Sands to Aberdeen Proving Ground, Md., and Fort Bliss, Texas, for training operations being conducted this month.

“I think the data collectors are excited to finally have some technology in their hands to help them collect data at NIE. They see this as a tool that will make their jobs easier and more efficient,” Stremlau said.

 




All of this week's top headlines to your email every Friday.


 
 

 

Sparks fly as NASA pushes limits of 3-D printing technology

NASA has successfully tested the most complex rocket engine parts ever designed by the agency and printed with additive manufacturing, or 3-D printing, on a test stand at NASA’s Marshall Space Flight Center in Huntsville, Ala. NASA engineers pushed the limits of technology by designing a rocket engine injector – a highly complex part that...
 
 
NASA photograph by David Alexander

NASA MQ-9 remotely piloted aircraft completes visual, radar mission in Hawaii

NASA photograph “Ikhana,” NASA’s MQ-9 remotely piloted research aircraft, carries a maritime radar in a specialized centerline pod during a flight to check out systems prior to the aircraft’s deployment ...
 
 
NASA photograph by Tom Tschida

NASA Armstrong’s space shuttle Mate-Demate Device coming down

NASA photograph by Tom Tschida The space shuttle Mate-Demate Device that stood as an iconic symbol of NASA’s now-concluded Space Shuttle Program at NASA Armstrong Flight Research Center for 38 years is being dismantled af...
 

 

NASA awards research facilities, engineering support services contract

NASA has awarded a contract for research facilities and engineering support services to InuTeq, LLC of Greenbelt, Maryland, in support of the Mission Information and Test Systems Directorate at NASA’s Armstrong Flight Research Center, Edwards, Calif. This cost-plus-award-fee contract covers a one-year base period beginning Nov. 1, 2014 and four one-year options, and is valued...
 
 

NASA picks top Earth data challenge ideas, opens call for climate apps

NASA has selected four ideas from the public for innovative uses of climate projections and Earth-observing satellite data. The agency also has announced a follow-on challenge with awards of $50,000 to build climate applications based on OpenNEX data on the Amazon cloud computing platform. Both challenges use the Open NASA Earth Exchange, or OpenNEX, a...
 
 
nasa-flying-lab

NASA’s flying laboratories study our world

Throughout the remainder of 2014, NASA is flying a series of airborne research campaigns from the North Pole to the South Pole and many points in between ñ to take a closer look at U.S. air quality, hurricanes in the Atlantic ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>