Business

May 9, 2012

Boeing KC-46 Tanker program successfully completes preliminary design review

boeing-tanker-review

The Boeing KC-46 Tanker program has completed a Preliminary Design Review with the U.S. Air Force, a key milestone in the development of the next-generation aerial refueling tanker.

The review, which began March 21 and ended April 27, demonstrated that the preliminary design of the KC-46A Tanker meets system requirements and establishes the basis for proceeding with detailed design. Boeing remains on plan to deliver 18 combat-ready KC-46A Tankers by 2017.

“I’m happy with Boeing’s performance. They’re maintaining a very tight focus on meeting commitments and staying on or ahead of schedule. The program remains on a good path,” said Air Force Maj. Gen. Chris Bogdan, KC-46 Program executive officer. “This is important news for the nation’s war fighters, because it reaffirms our commitment to delivering the KC-46A tanker on schedule.”

The program’s next major milestone is a Critical Design Review that will take place in the summer of 2013. The CDR will determine that the design of the KC-46A is mature and ready to proceed to the manufacturing phase.

“The KC-46 team is designing an aircraft that will offer superior, modern multi-role capabilities for the war fighter, including advanced refueling systems and military avionics, and the ability to transport cargo, passengers and patients,” said Maureen Dougherty, Boeing KC-46 Tanker vice president and program manager. “Working closely with our Air Force teammates, we’ve made tremendous progress in the past 14 months and have the foundation in place to enter the detailed design phase.”

In addition to the successful PDR, the Boeing KC-46 team has completed several major milestones on or ahead of schedule over the past year that include a System Requirements Review, Integrated Baseline Review, 767-2C PDR, and Firm Configuration Reviews for the 767-2C and the KC-46A Tanker.

Boeing will build 179 next-generation aerial refueling tanker aircraft that will begin to replace the Air Force’s fleet of 416 KC-135 tankers. Based on the proven Boeing 767 commercial airplane, the KC-46A tanker is a wide-body, multi-mission aircraft updated with the latest and most advanced technology to meet the demanding mission requirements of the future, including a digital flight deck featuring Boeing 787 Dreamliner electronic displays and a flight control design philosophy that places aircrews in command to maximize combat maneuverability. The KC-46A also features a modernized KC-10 boom with a fly-by-wire control system, and a refueling envelope and fuel offload rate that is greater than that of the KC-135 it will replace.

 




All of this week's top headlines to your email every Friday.


 
 

 

Northrop, Navy celebrate legacy of EA-6B Prowler

Northrop Grumman photograph by Edgar Mills The U.S. Navy’s last operational EA-6B Prowler, designed and built by Northrop Grumman, lifts off from Naval Air Station Whidbey Island, Wash. in a ceremonial fly-away June 27 from its long time operational base. The Navy is retiring the Prowler after nearly 45 years of service.   The U.S....
 
 

Lockheed signs agreements for two full-flight simulators

Lockheed Martin Commercial Flight Training and Airbus have signed a frame contract enabling Airbus to expedite procurement of flight simulation devices for their customers, Airbus training centers and their affiliates worldwide. The frame contract emphasizes the shared intent to partner on future training programs, and combines Airbus’ and Lockheed Martin Commercial Flight Training’s expert...
 
 

Drone Aviation receives order for U.S. Army aerostat system enhancement

Drone Aviation Holding Corp., a developer of specialized lighter-than-air aerostats and tethered drones, announced June 24 that its wholly owned subsidiary, Drone Aviation Corp., has been awarded an order from U.S. Government prime contractor BAE Systems for parts and services related to enhancing and supporting two WASP aerostat systems owned and operated by the U.S....
 

 

Boeing names Muilenburg as chief executive officer

The Boeing board of directors has elected Dennis A. Muilenburg the company’s 10th chief executive, succeeding W. James (Jim) McNerney, Jr., who held the position for the past 10 years. Muilenburg, who has served as Boeing president and chief operating officer since 2013, becomes president and CEO July 1. McNerney, who joined Boeing’s board of...
 
 
boeing-thailand

Boeing, Thai Airways International celebrate 25th direct 777 delivery

  Boeing and Thai Airways International Public Company Limited celebrated the Thailand flag carrier’s 25th direct 777 delivery, a 777-300ER (Extended Range), from the Boeing delivery center in Everett, Wash.  “...
 
 

General Dynamics receives $219 million for U.S. Army’s WIN-T increment 2 systems

General Dynamics received the first full rate production order from the U.S. Army to build additional Warfighter Information Network – Tactical (WIN-T) Increment 2 systems.  The $219 million order includes the production of more than 300 vehicle-based network communication nodes along with related equipment and materials. WIN-T Increment 2 is the Army’s communications backbone providin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>