Defense

May 15, 2012

Air Force announces criteria for basing KC-46A

After extensive internal review, the Air Force released May 14 its basing criteria that will be used to select candidate bases for the KC-46A formal training unit and first two main operating bases.

The formal training unit and first main operating base will be led by active duty units. The second main operating base will be led by an Air National Guard unit. The FTU and MOB 1 will begin receiving aircraft in fiscal 2016. MOB 2 will receive aircraft in fiscal 2018.

The basing criteria for the MOBs, approved by Secretary of the Air Force Michael B. Donley and Air Force Chief of Staff General Norton A. Schwartz, include mission (proximity to refueling receiver demand, airfield and airspace availability, fuels considerations, and the potential to establish an association), capacity (hangar, runway, ramp space and facility considerations), environmental requirements and cost factors.

The basing criteria for the FTU, approved by the secretary of the Air Force and the chief of staff of the Air Force, include mission (proximity of aircraft available to support air refueling training, student throughput, aircrew training systems, fuels considerations, and the potential to establish an association), capacity (hangars, runway, ramp space and facility considerations), environmental requirements and cost factors.

“The KC-46A tanker is a critical force multiplier and essential to the way this nation fights its wars and provides humanitarian support around the globe,” explained Schwartz. “The KC-46A is a game changer, and will be a great asset to the nation, not only as a tanker, but as a means to augment the airlift fleet, provide aeromedical evacuation and transport of passengers and cargo.”

“The Air Force is committed to an open and transparent process to address KC-46A basing,” said Kathleen Ferguson, Air Force deputy assistant secretary for installations, “As we progress through the basing process, we will share information so interested communities are aware of what to expect.”

The Air Force will evaluate all sites within the defined enterprise against the approved criteria. This information will be used to identify candidate bases for the KC-46A. After the release of the candidate bases, Air Mobility Command will conduct site surveys at each candidate base.

Site survey teams will assess each location against operational and training requirements, potential impacts to existing missions, housing, infrastructure, manpower, and develop cost estimates to determine how to beddown the KC-46 at each location.

Based on the results of these efforts, the Air Force plans to announce KC-46A preferred and reasonable alternatives and begin the environmental impact analysis process for the FTU and MOB 1 in December 2012. Likewise, the Air Force plans to announce the preferred and reasonable alternatives and begin the EIAP for MOB 2 in the spring of 2013.

“This enterprise-wide look enhances our ability to create, protect, and sustain all air and space forces across the full range of military operations,” said Ferguson. “It is a deliberate, standardized, and transparent process.”




All of this week's top headlines to your email every Friday.


 
 

 
Army photograph by C. Todd Lopez

Smart-mortar will help Soldiers more effectively hit targets

Army photograph by C. Todd Lopez Nick Baldwin and Evan Young, researchers with the Armament Research Development and Engineering Center at Picatinny Arsenal, Pennsylvania, discuss the 120mm Guided Enhanced Fragmentation Mortar ...
 
 

Air Force assigns new chief scientist

The Air Force announced the service’s new chief scientist to serve as a science and technology adviser to the secretary of the Air Force and the chief of staff of the Air Force, May 21. Dr. Greg Zacharias will be the 35th chief scientist and is ready to “dive in” to his new role. “I...
 
 

TSgt promotion release delayed to allow system validation

Technical sergeant promotion selection results, originally scheduled for release May 28, will be delayed to enable the Air Force to continue to validate extensive system changes to the Weighted Airman Promotion System, officials announced. The 15E6 technical sergeant promotion cycle is the first to incorporate recent changes in the enlisted evaluation and promotion system. Recent...
 

 

Freedom completes rough water trials

The littoral combat ship USS Freedom completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials in late March the Navy reported May 21. The U.S. Navy must demonstrate the seaworthiness and structural integrity of each new ship class. One of the primary ways the Navy verifies these qualities is through a...
 
 

Air Force releases Strategic Master Plan

The Air Force officially released the Strategic Master Plan May 21, which is the latest in a series of strategic documents designed to guide the organizing, training and equipping of the force over the coming decades. The SMP builds on the strategic imperatives and vectors described in the capstone document, America’s Air Force: A Call...
 
 

HYT extension possible for SrA-MSgt in 35 career fields

Eligible senior airmen, staff sergeants, technical sergeants and master sergeants in 35 Air Force specialties will be able to apply for a high year of tenure extension and, if approved, will be able to extend between 12 and 24 months past their current HYT. The Air Force is introducing several personnel and manpower initiatives to...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>