Space

May 30, 2012

NASA lunar spacecraft complete prime mission ahead of schedule

An artist’s depiction of the twin spacecraft that comprise NASA’s Gravity Recovery And Interior Laboratory (GRAIL) mission. During the GRAIL mission’s science phase, spacecraft (Ebb and Flow) transmit radio signals precisely defining the distance between them as they orbit the moon in formation. As the two fly over areas of greater and lesser gravity caused by both visible features, such as mountains and craters, and masses hidden beneath the lunar surface, the distance between the two spacecraft will change slightly. Mission scientists use this information to create a high-resolution map of the moon’s gravitational field. The data will allow scientists to understand what goes on below the lunar surface.

A NASA mission to study the moon from crust to core has completed its prime mission earlier than expected.

The mission team of NASA’s Gravity Recovery and Interior Laboratory mission, with twin probes named Ebb and Flow, is now preparing for extended science operations starting Aug. 30 and continuing through Dec. 3, 2012.

The GRAIL mission has gathered unprecedented detail about the internal structure and evolution of the moon. This information will increase our knowledge of how Earth and its rocky neighbors in the inner solar system developed into the diverse worlds we see today.

Since March 8, the spacecraft have operated around the clock for 89 days. From an orbit that passes over the lunar poles, they have collected data covering the entire surface three times. An instrument called the Lunar Gravity Ranging System onboard each spacecraft transmits radio signals that allow scientists to translate the data into a high-resolution map of the moon’s gravitational field. The spacecraft returned their last data set of the prime mission today. The instruments were turned off at 1 p.m., EDT, when the spacecraft were 37 miles above the Sea of Nectar.

“Many of the measurement objectives were achieved from analysis of only half the primary mission data, which speaks volumes about the skill and dedication of our science and engineering teams,” said Maria Zuber, principal investigator of GRAIL at the Massachusetts Institute of Technology in Cambridge. “While there is a great deal of work yet to be done to achieve the mission’s science, it’s energizing to realize that what we traveled from Earth to the moon for is right here in our hands.”

“GRAIL delivered to Earth over 99.99 percent of the data that could have been collected, which underscores the flawless performance of the spacecraft, instrument and the Deep Space Network,” said Zuber.

Both spacecraft instruments will be powered off until Aug. 30. The spacecraft will have to endure a lunar eclipse on June 4. The eclipse and the associated sudden changes in temperature and the energy-sapping darkness that accompanies the phenomena were expected and do not concern engineers about the spacecraft’s health.

“Before launch, we planned for all of GRAIL’s primary mission science to occur between lunar eclipses,” said David Lehman, project manager of GRAIL from NASA’s Jet Propulsion Laboratory in Pasadena, Calif. “But now that we have flown Ebb and Flow for a while, we understand them and are confident they can survive these eclipses in good shape.”

The extended mission goal is to take an even closer look at the moon’s gravity field. To achieve this, GRAIL mission planners will halve their current operating altitude flying at the lowest altitude that can be safely maintained.

“Orbiting at an average altitude of 14 miles during the extended mission, the GRAIL twins will be clearing some of the moon’s higher surface features by about 5 miles (8 kilometers),” said Joe Beerer, GRAIL’s mission manager. “If Ebb and Flow had feet, I think by reflex they’d want to pull them up every time they fly over a mountain.”

Along with mission science, GRAIL’s MoonKAM (Moon Knowledge Acquired by Middle school students) education and public outreach program is also extended. To date over 70,000 student images of the moon have been obtained. The MoonKAM program is led by Sally Ride, America’s first woman in space, and her team at Sally Ride Science in collaboration with undergraduate students at the University of California in San Diego.

The GRAIL mission is managed by JPL for NASA’s Science Mission Directorate in Washington. The mission is part of the Discovery Program managed at NASA’s Marshall Space Flight Center in Huntsville, Ala. NASA’s Deep Space Network is an international network of antennas that supports interplanetary spacecraft missions and radio and radar astronomy observations for the exploration of the solar system and the universe. The network also supports selected Earth-orbiting missions. Lockheed Martin Space Systems in Denver built the spacecraft.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 28, 2014

News: U.S. has lost track of weapons given to Afghanistan - The United States supplied almost three quarter of a million weapons to Afghanistan’s army and police since 2004, but the military cannot track where many of those arms have gone, a new report found. Bill to improve VA has $17 billion price tag - A bipartisan...
 
 

News Briefs July 28, 2014

Marines seek authorization for dolphin deaths The Marine Corps is asking for a five-year authorization from the National Marine Fisheries Service for incidental deaths of bottlenose dolphins during training exercises at a bombing and target range. The Sun Journal of New Bern, N.C., reports that Connie Barclay of the National Oceanic and Atmospheric Administration says...
 
 
Army photograph by David Vergun

Senior leaders explain Army’s drawdown plan

Army photograph by David Vergun No commander is happy when notified that a soldier from his or her command has been identified for early separation. But commanders personally notify those Soldiers and ensure participation in th...
 

 

Northrop Grumman awarded mission support services contract

The U.S. Army awarded Northrop Grumman a cost-plus-fixed-fee contract, with a potential value of $205 million, to continue providing mission logistics services in support of combat brigades training at the National Training Center in Fort Irwin, Calif. The contract covers one base year and two one-year options. Support will include the full range of mission...
 
 
Lockheed Martin photograph by Beth Groom

F-35 Rollout Marks U.S.-Australia Partnership Milestone

Lockheed Martin photograph by Beth Groom Royal Australian Air Force Air Marshal Geoff Brown delivers his remarks at the roll out ceremony for Australia’s first F-35. The official rollout of the first two F-35 Lightning II...
 
 
NASA/JPL-Caltech image

NASA’s Mars spacecraft maneuvers to prepare for close comet flyby

NASA/JPL-Caltech image This graphic depicts the orbit of comet C/2013 A1 Siding Spring as it swings around the sun in 2014. On Oct. 19, the comet will have a very close pass at Mars. Its nucleus will miss Mars by about 82,000 m...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>