Space

May 30, 2012

NASA lunar spacecraft complete prime mission ahead of schedule

An artist’s depiction of the twin spacecraft that comprise NASA’s Gravity Recovery And Interior Laboratory (GRAIL) mission. During the GRAIL mission’s science phase, spacecraft (Ebb and Flow) transmit radio signals precisely defining the distance between them as they orbit the moon in formation. As the two fly over areas of greater and lesser gravity caused by both visible features, such as mountains and craters, and masses hidden beneath the lunar surface, the distance between the two spacecraft will change slightly. Mission scientists use this information to create a high-resolution map of the moon’s gravitational field. The data will allow scientists to understand what goes on below the lunar surface.

A NASA mission to study the moon from crust to core has completed its prime mission earlier than expected.

The mission team of NASA’s Gravity Recovery and Interior Laboratory mission, with twin probes named Ebb and Flow, is now preparing for extended science operations starting Aug. 30 and continuing through Dec. 3, 2012.

The GRAIL mission has gathered unprecedented detail about the internal structure and evolution of the moon. This information will increase our knowledge of how Earth and its rocky neighbors in the inner solar system developed into the diverse worlds we see today.

Since March 8, the spacecraft have operated around the clock for 89 days. From an orbit that passes over the lunar poles, they have collected data covering the entire surface three times. An instrument called the Lunar Gravity Ranging System onboard each spacecraft transmits radio signals that allow scientists to translate the data into a high-resolution map of the moon’s gravitational field. The spacecraft returned their last data set of the prime mission today. The instruments were turned off at 1 p.m., EDT, when the spacecraft were 37 miles above the Sea of Nectar.

“Many of the measurement objectives were achieved from analysis of only half the primary mission data, which speaks volumes about the skill and dedication of our science and engineering teams,” said Maria Zuber, principal investigator of GRAIL at the Massachusetts Institute of Technology in Cambridge. “While there is a great deal of work yet to be done to achieve the mission’s science, it’s energizing to realize that what we traveled from Earth to the moon for is right here in our hands.”

“GRAIL delivered to Earth over 99.99 percent of the data that could have been collected, which underscores the flawless performance of the spacecraft, instrument and the Deep Space Network,” said Zuber.

Both spacecraft instruments will be powered off until Aug. 30. The spacecraft will have to endure a lunar eclipse on June 4. The eclipse and the associated sudden changes in temperature and the energy-sapping darkness that accompanies the phenomena were expected and do not concern engineers about the spacecraft’s health.

“Before launch, we planned for all of GRAIL’s primary mission science to occur between lunar eclipses,” said David Lehman, project manager of GRAIL from NASA’s Jet Propulsion Laboratory in Pasadena, Calif. “But now that we have flown Ebb and Flow for a while, we understand them and are confident they can survive these eclipses in good shape.”

The extended mission goal is to take an even closer look at the moon’s gravity field. To achieve this, GRAIL mission planners will halve their current operating altitude flying at the lowest altitude that can be safely maintained.

“Orbiting at an average altitude of 14 miles during the extended mission, the GRAIL twins will be clearing some of the moon’s higher surface features by about 5 miles (8 kilometers),” said Joe Beerer, GRAIL’s mission manager. “If Ebb and Flow had feet, I think by reflex they’d want to pull them up every time they fly over a mountain.”

Along with mission science, GRAIL’s MoonKAM (Moon Knowledge Acquired by Middle school students) education and public outreach program is also extended. To date over 70,000 student images of the moon have been obtained. The MoonKAM program is led by Sally Ride, America’s first woman in space, and her team at Sally Ride Science in collaboration with undergraduate students at the University of California in San Diego.

The GRAIL mission is managed by JPL for NASA’s Science Mission Directorate in Washington. The mission is part of the Discovery Program managed at NASA’s Marshall Space Flight Center in Huntsville, Ala. NASA’s Deep Space Network is an international network of antennas that supports interplanetary spacecraft missions and radio and radar astronomy observations for the exploration of the solar system and the universe. The network also supports selected Earth-orbiting missions. Lockheed Martin Space Systems in Denver built the spacecraft.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines September 3, 2015

News Carter To China: US ‘Will Fly, Sail, Operate Wherever Law Allows’ Defense Secretary Ash Carter, in a speech billed as all about a new personnel approach for the Pentagon, laid out a clear line in the sand of the temporary islands the Chinese have been building. http://breakingdefense.com/2015/09/carter-to-china-us-will-fly-sail-operate-wherever-law-allows/ LRS-B details emerge: Major t...
 
 

News Briefs September 3, 2015

Soldier injured after parachute failed to deploy A soldier was injured during a U.S. Army Special Operations parachute training exercise in western Montana. Army officials at Fort Bragg, N.C., say 16 soldiers were conducting a free-fall parachute jump from two Blackhawk helicopters near Hamilton Aug. 31 when one soldier had an equipment malfunction and was...
 
 

Boeing, Jet2.com finalize order for 27 Next Generation 737-800s

Boeing and UK Leisure Airline Jet2.com have finalized an order for 27 Next Generation 737-800s, valued at approximately $2.6 billion at current list prices. Jet2.com currently operates an all-Boeing fleet of nearly 60 aircraft; however, this is the organization’s first direct Boeing order.† The aircraft will be used to take the company’s package holiday and...
 

 
boeing-emirates

Boeing, Emirates celebrate airline’s 150th 777 delivery

Boeing and Emirates Airline Sept. 3 celebrated the simultaneous delivery of three 777s — two 777-300ERs and one 777 Freighter — marking the entry of the 150th 777 into Emirates’ fleet. The delivery marks the first tim...
 
 

U.S. Air Force selects Chromalloy for F108 gas turbine engine module repairs

Chromalloy announced Sept. 2 that it has been selected by the U.S. Air Force to provide repairs on low pressure turbine modules for the F108 aircraft engine fleet, in a contract valued at up to $74 million. The one-year agreement was contracted by the Tinker Air Force Base in Oklahoma and includes four one-year options...
 
 
raytheon-colorado

Raytheon expanding in Colorado Springs

Raytheon will speed up growth of its Colorado Springs presence after signing a $700 million multi-year indefinite-delivery/indefinite-quantity contract to support operations at NORAD’s Cheyenne Mountain Complex. Under the...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>