Defense

May 31, 2012

Navy secretary to commission submarine Mississippi

The Navy’s newest Virginia-class attack submarine Mississippi will be commissioned June 2, 2012, during a 10 a.m., CDT, ceremony at the Port of Pascagoula in Pascagoula, Miss.

Secretary of the Navy Ray Mabus will deliver the ceremony’s principal address. Allison Stiller, deputy assistant secretary of the Navy for ship programs, will serve as the ship’s sponsor. In the time-honored Navy tradition she will give the first order to “man our ship and bring her to life!”

The selection of Mississippi as the name for the submarine is dedicated to the state’s long-standing tradition of shipbuilding in support of our nation’s defense. It also honors the indomitable spirit of the people of Mississippi, who have made great strides in recovering from the devastation of Hurricane Katrina. This fighting spirit will be an inspiration to all sailors who embark aboard Mississippi.

There have been four previous ships named Mississippi. The first Mississippi, a side wheeler, served as Commodore Matthew Perry’s flagship for his historic voyage to Japan and fought with Admiral Farragut’s forces on the Mississippi River during the Civil War. The second and third were battleships, a BB-23 in World War I and a BB-41 in World War II. The fourth Mississippi, a Virginia-class nuclear guided missile cruiser, was decommissioned in 1997.

Designated SSN 782, the ninth ship of the Virginia class, Mississippi is built to excel in antisubmarine warfare; antiship warfare; strike warfare; special operations; intelligence, surveillance, and reconnaissance; irregular warfare; and mine warfare missions. Adept at operating in both the world’s shallow littoral regions and deep waters, Mississippi will directly enable five of the six Navy maritime strategy core capabilities – sea control, power projection, forward presence, maritime security, and deterrence.

Capt. John McGrath, a native of Neptune, N.J., and a 1990 graduate from the U.S. Naval Academy, will be the ship’s commanding officer, leading a crew of approximately 134 officers and enlisted personnel.

The 7,800-ton Mississippi was built under a teaming arrangement between General Dynamics-Electric Boat and Huntington Ingalls Industry-Newport News Shipbuilding and was delivered to the Navy one year ahead of contract schedule and under cost. Mississippi took just over 62 months to build, which set the record for the Virginia Class Submarine program’s fastest delivery.

The boat is 377 feet long, has a 34-foot beam, and will be able to dive to depths of greater than 800 feet and operate at speeds in excess of 25 knots submerged. Mississippi is designed with a nuclear reactor plant that will not require refueling during the planned life of the ship – reducing lifecycle costs while increasing underway time.

The commissioning will be aired live on the U.S. Navy’s Facebook page http://www.facebook.com/usnavy and Livestream channel http://www.livestream.com/usnavy beginning at 10 a.m., CDT. Join the conversation on Twitter #NewMiss.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines December 17, 2014

News: U.S. Air Force tanker platform slated for year-end debut - Boeing is planning for first flight of its 767-2C – upon which the U.S. Air Force’s new KC-46 tanker will be based – by year’s end, six months late. Northrop Grumman wins $657.4 million deal to supply drones to South Korea - Northrop Grumman has won...
 
 

NASA launches new Micro-g NExT for undergraduates

NASA is offering undergraduate students an opportunity to participate in a new microgravity activity called Micro-g Neutral Buoyancy Experiment Design Teams. The deadline for proposals is Jan. 28, 2015. Micro-g NExT challenges students to work in teams to design and build prototypes of spacewalking tools to be used by astronauts for spacewalk training in the...
 
 
launch1

Storm fails to quench liftoff of secret reconnaissance satellite

The fiery launch of an Atlas V (541), among the most powerful of the venerable Atlas family, briefly dispelled the gloom over Californiaís Central Coast on the evening of Dec. 12. A team of personnel from United Launch Allianc...
 

 
Coast Guard photograph

Navy demonstrates unmanned helicopter operations aboard Coast Guard cutter

http://static.dvidshub.net/media/video/1412/DOD_102145893/DOD_102145893-512×288-442k.mp4 Coast Guard photograph An MQ-8B Fire Scout UAS is tested off the Coast Guard Cutter Bertholf near Los Angeles, Dec. 5 2014. The Coast...
 
 
GPS-OCX

GPS III, OCX successfully demonstrate key satellite command, control capabilities

Lockheed Martin and Raytheon successfully completed the fourth of five planned launch and early orbit exercises to demonstrate new automation capabilities, information assurance and launch readiness of the worldís most powerfu...
 
 

Aerojet Rocketdyne successfully demonstrates 3D printed rocket propulsion system for satellites

Aerojet Rocketdyne has successfully completed a hot-fire test of its MPS-120 CubeSat High-Impulse Adaptable Modular Propulsion System. The MPS-120 is the first 3D-printed hydrazine integrated propulsion system and is designed to provide propulsion for CubeSats, enabling missions not previously available to these tiny satellites. The project was funded out of the NASA Office of Chief...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>