Defense

May 31, 2012

Navy secretary to commission submarine Mississippi

The Navy’s newest Virginia-class attack submarine Mississippi will be commissioned June 2, 2012, during a 10 a.m., CDT, ceremony at the Port of Pascagoula in Pascagoula, Miss.

Secretary of the Navy Ray Mabus will deliver the ceremony’s principal address. Allison Stiller, deputy assistant secretary of the Navy for ship programs, will serve as the ship’s sponsor. In the time-honored Navy tradition she will give the first order to “man our ship and bring her to life!”

The selection of Mississippi as the name for the submarine is dedicated to the state’s long-standing tradition of shipbuilding in support of our nation’s defense. It also honors the indomitable spirit of the people of Mississippi, who have made great strides in recovering from the devastation of Hurricane Katrina. This fighting spirit will be an inspiration to all sailors who embark aboard Mississippi.

There have been four previous ships named Mississippi. The first Mississippi, a side wheeler, served as Commodore Matthew Perry’s flagship for his historic voyage to Japan and fought with Admiral Farragut’s forces on the Mississippi River during the Civil War. The second and third were battleships, a BB-23 in World War I and a BB-41 in World War II. The fourth Mississippi, a Virginia-class nuclear guided missile cruiser, was decommissioned in 1997.

Designated SSN 782, the ninth ship of the Virginia class, Mississippi is built to excel in antisubmarine warfare; antiship warfare; strike warfare; special operations; intelligence, surveillance, and reconnaissance; irregular warfare; and mine warfare missions. Adept at operating in both the world’s shallow littoral regions and deep waters, Mississippi will directly enable five of the six Navy maritime strategy core capabilities – sea control, power projection, forward presence, maritime security, and deterrence.

Capt. John McGrath, a native of Neptune, N.J., and a 1990 graduate from the U.S. Naval Academy, will be the ship’s commanding officer, leading a crew of approximately 134 officers and enlisted personnel.

The 7,800-ton Mississippi was built under a teaming arrangement between General Dynamics-Electric Boat and Huntington Ingalls Industry-Newport News Shipbuilding and was delivered to the Navy one year ahead of contract schedule and under cost. Mississippi took just over 62 months to build, which set the record for the Virginia Class Submarine program’s fastest delivery.

The boat is 377 feet long, has a 34-foot beam, and will be able to dive to depths of greater than 800 feet and operate at speeds in excess of 25 knots submerged. Mississippi is designed with a nuclear reactor plant that will not require refueling during the planned life of the ship – reducing lifecycle costs while increasing underway time.

The commissioning will be aired live on the U.S. Navy’s Facebook page http://www.facebook.com/usnavy and Livestream channel http://www.livestream.com/usnavy beginning at 10 a.m., CDT. Join the conversation on Twitter #NewMiss.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 31, 2015

News: Carter: Military leaders could arm more troops at home – Following the recent fatal shooting of four Marines and a sailor in Tennessee, Defense Secretary Ash Carter is ordering the military services to consider new policies that would enhance security for troops at home, including potentially arming more personnel.   Business: DOD weighs supplier base,...
 
 

News Briefs July 31, 2015

U.S. delivering eight newer F-16 warplanes to Egypt The United States Embassy in Cairo says the U.S. is delivering eight newer F-16 warplanes to Egypt as part of an ongoing military support package. It says in a July 30 statement that the aircraft, of the current Block 52 production variant, will be flown in from...
 
 
Lockheed Martin photograph

Lockheed Martin successfully tests design changes for Orion spacecraft’s fairing separation system

Lockheed Martin photograph A protective panel for Orion’s service module is jettisoned during testing at Lockheed Martin’s Sunnyvale, California facility. This test series evaluated design changes to the spacecraft’s fair...
 

 

Australian company to provide parts for initial production of Triton UAS

Northrop Grumman has awarded the first Australian supplier contract for the U.S. Navy’s MQ-4C Triton unmanned aircraft system initial production lot to Ferra Engineering. Brisbane-based Ferra Engineering will manufacture mechanical sub-assemblies for the first four Triton air vehicles including structural components. “At Northrop Grumman it’s very important to not only develop...
 
 
Boeing photograph

CH-46 ‘Phrog’ makes its last hop

Boeing photograph The CH-46 Sea Knight helicopter commonly known as the “Phrog,” is set to retire and to be flown one last time by Reserve Marine Medium Helicopter Squadron (HMM) 774 on Aug. 1. The CH-46 Sea Knight is a med...
 
 

Insitu awarded LRIP Lot IV RQ-21A Blackjack Systems contract

Under the terms of its latest contract, Insitu will build six RQ-21A Blackjack systems for the U.S. Navy and Marine Corps. The $78-million Small Tactical Unmanned Aircraft Systems Lot IV Low Rate Initial Production contract is the latest event in the program’s progression toward the Initial Operational Test and Evaluation phase.   “This award will...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>