Business

June 1, 2012

AeroVironment receives $15.8 million initial order from U.S. Army for RQ-11B Raven small UAS, new payload

AeroVironment, Inc. has received a $15,813,406 firm fixed-price authorization to perform May 22, 2012 from the U.S. Army as the initial portion of a contract action with a total projected value of $65,889,191.

The order includes RQ-11B Raven systems, new miniature gimbaled payloads and initial spares packages, and is funded from the Army’s fiscal 2012 procurement budget. Delivery of systems, spares and payloads is scheduled for completion by April 30, 2013.

AeroVironment unveiled its Mantisâ„¢ line of miniature gimbaled sensor payloads April 1, 2012, at the Army Aviation Association of America symposium in Nashville, Tenn. Weighing 450 grams, the ruggedized, multi-axis Mantis i23 houses an electro-optical and infrared thermal video sensor in addition to a laser illuminator. The single payload replaces two separate sensor payloads on the Raven air vehicle, delivering daytime and nighttime capabilities from a single package.

“The U.S. Army has more than 1,700 Raven systems in its inventory with an ultimate goal of more than 2,300 systems,” said Roy Minson, AeroVironment senior vice president and general manager, Unmanned Aircraft Systems. “Since winning the Army’s small unmanned aircraft system competition in 2005 we have focused on delivering highly reliable, highly capable Raven systems and on continuously enhancing their capabilities. The new miniature gimbaled payload is the latest example of cost-effective improvements that will benefit soldiers directly through enhanced situational awareness.”

The RQ-11B Raven unmanned aircraft system is a 4.2-pound, backpackable, hand-launched sensor platform that provides day and night, real-time video imagery wirelessly to a portable ground control station for “over the hill” and “around the corner” reconnaissance, surveillance and target acquisition in support of tactical units. U.S. armed forces use Raven systems extensively for missions such as base security, route reconnaissance, mission planning and force protection. Each Raven system typically consists of three aircraft, two ground control stations and spares.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 22, 2014

News: GAO: Pentagon violated law with Bergdahl swap - Congressional investigators say the Pentagon violated the law when it swapped five Taliban leaders for Army Sgt. Bowe Bergdahl, who was held prisoner in Afghanistan for five years.   Business: U.S. Air Force issues RFI for new rocket engine - The US Air Force is officially looking into...
 
 

News Briefs August 22, 2014

U.S. military deaths in Afghanistan at 2,200 As of Aug. 20, 2014, at least 2,200 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,821 military service members have died in Afghanistan as a result...
 
 
navair-triton

MQ-4C Tritons to arrive at Pax River this fall

  MQ-4C Triton test air vehicles at Northrop Grumman’s facility in Palmdale, Calif., will fly cross-country to Naval Air Station Patuxent River, Md., this fall. The MQ-4C completed a test flight Aug. 19 with updated ...
 

 
Boeing photograph

Boeing program completes critical design, safety reviews

Boeing photograph Boeing recently completed the Phase Two Spacecraft Safety Review of its Crew Space Transportation-100 spacecraft and the Critical Design Review of its integrated systems, meeting all of the companyís Commerci...
 
 
global-hawk2

Air Combat Command loans Global Hawk to GVCTF

Air Force photograph by Jennifer Romo The 412th Test Wing’s Global Vigilance Combined Test Force received a Global Hawk Block 40 Aug. 6, on loan from Air Combat Command. Tail number 2035, from Grand Forks AFB, N.D., is jo...
 
 

NASA awards program analysis, Control Bridge III Contract

NASA has awarded the Program Analysis and Control III Bridge contract for support services to ASRC Research & Technology Solutions of Beltsville, Md. The cost-plus-fixed-fee, indefinite delivery/indefinite quantity basic contract has a minimum ordering value of $1 million and a maximum ordering value of $37 million, with a performance period beginning Aug. 30 through Feb....
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>