Business

June 1, 2012

AeroVironment receives $15.8 million initial order from U.S. Army for RQ-11B Raven small UAS, new payload

AeroVironment, Inc. has received a $15,813,406 firm fixed-price authorization to perform May 22, 2012 from the U.S. Army as the initial portion of a contract action with a total projected value of $65,889,191.

The order includes RQ-11B Raven systems, new miniature gimbaled payloads and initial spares packages, and is funded from the Army’s fiscal 2012 procurement budget. Delivery of systems, spares and payloads is scheduled for completion by April 30, 2013.

AeroVironment unveiled its Mantisâ„¢ line of miniature gimbaled sensor payloads April 1, 2012, at the Army Aviation Association of America symposium in Nashville, Tenn. Weighing 450 grams, the ruggedized, multi-axis Mantis i23 houses an electro-optical and infrared thermal video sensor in addition to a laser illuminator. The single payload replaces two separate sensor payloads on the Raven air vehicle, delivering daytime and nighttime capabilities from a single package.

“The U.S. Army has more than 1,700 Raven systems in its inventory with an ultimate goal of more than 2,300 systems,” said Roy Minson, AeroVironment senior vice president and general manager, Unmanned Aircraft Systems. “Since winning the Army’s small unmanned aircraft system competition in 2005 we have focused on delivering highly reliable, highly capable Raven systems and on continuously enhancing their capabilities. The new miniature gimbaled payload is the latest example of cost-effective improvements that will benefit soldiers directly through enhanced situational awareness.”

The RQ-11B Raven unmanned aircraft system is a 4.2-pound, backpackable, hand-launched sensor platform that provides day and night, real-time video imagery wirelessly to a portable ground control station for “over the hill” and “around the corner” reconnaissance, surveillance and target acquisition in support of tactical units. U.S. armed forces use Raven systems extensively for missions such as base security, route reconnaissance, mission planning and force protection. Each Raven system typically consists of three aircraft, two ground control stations and spares.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 26, 2015

News: U.S. F-22s deploying to Europe – Weeks after top Pentagon officials began openly calling Russia the greatest threat to the United States, the Air Force is preparing to deploy the F-22 Raptor to Europe for the first time.   Business: Lockheed pays $4.8 million to settle illegal lobbying claim – Sandia Corp. and parent company Lockheed...
 
 

News Briefs August 26, 2015

160 Marines in Bulgaria with tanks, artillery for training U.S. Marines accompanied by tanks, artillery, and light-armored reconnaissance vehicles have arrived in Bulgaria, part of a plan to train with allies to improve weapons skills and anti-armor tactics. The U.S. Marine Corps Forces said Aug. 25 some 160 Marines accompanied the tanks and artillery, which...
 
 
LM-satellite

Lockheed Martin makes tiny satellite cooling system

Lockheed Martin scientists are packing three times the power density into a key satellite cooling system whose previous design is already the lightest in its class. This project continues the company’s effort to reduce co...
 

 
space-camp

Space Camp: Once in a lifetime experience

PALMDALE, Calif.–Amazing, inspiring and motivating were a few of the words Space Camp graduates Lauren Baker and Ethan Calderone used to describe their experience recent experience at Space Camp. Ethan Calderone, a Palmda...
 
 
Northrop Grumman photograph by Bob Brown

Northrop Grumman delivers telescope structure for James Webb Space Telescope

Northrop Grumman photograph by Bob Brown Northrop Grumman employees preparing the telescope structure, for NASA’s James Webb Space Telescope for shipment to Goddard Space Flight Center in Greenbelt, Md. REDONDO BEACH, Cal...
 
 
Air Force photograph by Tommie Horton

Integration lab to support C-5 software, hardware upgrades

Air Force photograph by Tommie Horton The 402nd Software Maintenance Group has been tasked by the C-5 System Program Office with updating the Warner Robins Air Logistics Complex C-5 System Integration Lab with installation of a...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>