Defense

June 1, 2012

PACAF releases report on Alaska F-16 squadron move

Pacific Air Forces released a report May 31 on the Air Force’s plan to move people and aircraft associated with the 18th Aggressor Squadron from Eielson AFB near Fairbanks, Alaska, to Joint Base Elmendorf-Richardson, near Anchorage, Alaska.

Pacific Air Forces led a 26-member Site Activation Task Force team which traveled to both installations in April to study the overall impact of the F-16 squadron move scheduled for fiscal year 2013. The team validated that, after an initial outlay of $5.6 million in fiscal 2013, the move will result in manpower savings of 81 military positions and cost savings of $14.6 million over the next five years, through a combination of manpower and efficiency savings generated by consolidating operations and maintenance supervision overhead and base support functions.

The relocation is one part of the Air Force’s fiscal year 2013 force structure adjustments, which are designed to save approximately $8.7 billion of the Air Force’s $54 billion share of savings across the Future Years Defense Plan. The SATAF report specifically details actions needed to move the Aggressors in fiscal 2013 and details planning and incidental costs associated with this action.

Eielson hosts the only wing in the active duty Air Force that has only a single operational squadron. In addition to expected cost savings, this move would lead to more efficient operations by locating the F-16 Aggressor aircraft with their primary customers, the F-22 Raptors at Elmendorf. The F-16 Aggressors will retain the capability to operate from Eielson during exercises and as otherwise needed.

“Eielson Air Force Base is, and will continue to be, a valuable strategic location as part of the Total Force,” said Brig. Gen. Mark McLeod, Director of Logistics, Pacific Air Forces, and SATAF team lead. “The base will remain the home station for the Alaska Air National Guard’s 168th Air Refueling Wing and will provide critical training through the Joint Pacific Alaska Range Complex supporting major joint training exercises such as Red Flag, Distant Frontier and Northern Edge.”

In addition to the savings generated from the F-16 squadron move, the Air Force expects there will be additional savings based on proposed base operating support manpower adjustments in fiscal 2015. The estimated follow-on cost savings are projected to be approximately $90 million per year beginning in fiscal 2016, and $227 million across the FYDP. These savings are based on eliminating 749 military and 179 civilian manpower authorizations that analysis determined would no longer be needed at Eielson once the remaining infrastructure and support functions are adjusted after the Aggressor Squadron’s relocation. Savings resulting from the base operating support adjustments in fiscal 2015 will be further refined in future SATAFs.




All of this week's top headlines to your email every Friday.


 
 

 
Army photograph by C. Todd Lopez

Smart-mortar will help Soldiers more effectively hit targets

Army photograph by C. Todd Lopez Nick Baldwin and Evan Young, researchers with the Armament Research Development and Engineering Center at Picatinny Arsenal, Pennsylvania, discuss the 120mm Guided Enhanced Fragmentation Mortar ...
 
 

Air Force assigns new chief scientist

The Air Force announced the service’s new chief scientist to serve as a science and technology adviser to the secretary of the Air Force and the chief of staff of the Air Force, May 21. Dr. Greg Zacharias will be the 35th chief scientist and is ready to “dive in” to his new role. “I...
 
 

TSgt promotion release delayed to allow system validation

Technical sergeant promotion selection results, originally scheduled for release May 28, will be delayed to enable the Air Force to continue to validate extensive system changes to the Weighted Airman Promotion System, officials announced. The 15E6 technical sergeant promotion cycle is the first to incorporate recent changes in the enlisted evaluation and promotion system. Recent...
 

 

Freedom completes rough water trials

The littoral combat ship USS Freedom completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials in late March the Navy reported May 21. The U.S. Navy must demonstrate the seaworthiness and structural integrity of each new ship class. One of the primary ways the Navy verifies these qualities is through a...
 
 

Air Force releases Strategic Master Plan

The Air Force officially released the Strategic Master Plan May 21, which is the latest in a series of strategic documents designed to guide the organizing, training and equipping of the force over the coming decades. The SMP builds on the strategic imperatives and vectors described in the capstone document, America’s Air Force: A Call...
 
 

HYT extension possible for SrA-MSgt in 35 career fields

Eligible senior airmen, staff sergeants, technical sergeants and master sergeants in 35 Air Force specialties will be able to apply for a high year of tenure extension and, if approved, will be able to extend between 12 and 24 months past their current HYT. The Air Force is introducing several personnel and manpower initiatives to...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>