Space

June 21, 2012

NASA space launch system core stage moves from concept to design

The nation’s space exploration program is taking a critical step forward with a successful major technical review of the core stage of the Space Launch System, the rocket that will take astronauts farther into space than ever before.

The core stage is the heart of the heavy-lift launch vehicle. It will stand more than 200 feet (61 meters) tall with a diameter of 27.5 feet (8.4 meters).

NASA’s Marshall Space Flight Center in Huntsville, Ala., hosted a comprehensive review. Engineers from NASA and Boeing of Huntsville presented a full set of system requirements, design concepts and production approaches to technical reviewers and the independent review board.

“This meeting validates our design requirements for the core stage of the nation’s heavy-lift rocket and is the first major checkpoint for our team,” said Tony Lavoie, manager of the SLS Stages Element at Marshall. “Getting to this point took a lot of hard work, and I’m proud of the collaboration between NASA and our partners at Boeing. Now that we have completed this review, we go from requirements to real blueprints. We are right on track to deliver the core stage for the SLS program.”

The core stage will store liquid hydrogen and liquid oxygen to feed the rocket’s four RS-25 engines, all of which will be former space shuttle main engines for the first few flights. The SLS Program has an inventory of 16 RS-25 flight engines that successfully operated for the life of the Space Shuttle Program. Like the space shuttle, SLS also will be powered initially by two solid rocket boosters on the sides of the launch vehicle.

The SLS will launch NASA’s Orion spacecraft and other payloads, and provide an entirely new capability for human exploration beyond low Earth orbit. Designed to be safe, affordable and flexible for crew and cargo missions, the SLS will continue America’s journey of discovery and exploration to destinations including nearby asteroids, Lagrange points, the moon and ultimately, Mars.

“This is a very exciting time for the country and NASA as important achievements are made on the most advanced hardware ever designed for human spaceflight,” said William Gerstenmaier, associate administrator for the Human Exploration Operations Mission Directorate at NASA Headquarters in Washington. “The SLS will power a new generation of exploration missions beyond low Earth orbit and the moon, pushing the frontiers of discovery forward. The innovations being made now, and the hardware being delivered and tested, are all testaments to the ability of the U.S. aerospace workforce to make the dream of deeper solar system exploration by humans a reality in our lifetimes.”

The first test flight of NASA’s Space Launch System, which will feature a configuration for a 77-ton (70-metric-ton) lift capacity, is scheduled for 2017. As SLS evolves, a two-stage launch vehicle configuration will provide a lift capability of 143 tons (130 metric tons) to enable missions beyond low Earth orbit and support deep space exploration.

Boeing is the prime contractor for the SLS core stage, including its avionics. The core stage will be built at NASA’s Michoud Assembly Facility in New Orleans using state-of-the-art manufacturing equipment. Marshall manages the SLS Program for the agency.

Across the SLS Program, swift progress is being made on several elements. The J-2X upper-stage rocket engine, developed by Pratt & Whitney Rocketdyne for the future two-stage SLS, is being tested at Stennis Space Center in Mississippi. The prime contractor for the five-segment solid rocket boosters, ATK of Brigham City, Utah, has begun processing its first SLS hardware components in preparation for an initial qualification test in 2013.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 1, 2015

News: Iranian aircraft buzzed U.S. Navy helo in Persian Gulf - An Iranian aircraft buzzed a Navy helicopter operating in the Persian Gulf earlier this month, a U.S. military official said March 31. Active duty suicides up in 2014 - Suicides among active duty members of the military increased in 2014, though reservists and members of the...
 
 

News Briefs April 1, 2015

Germany, France, Italy plan to develop military drones Germany and France plan to work together with Italy to develop military surveillance drones that could also carry weapons. French President Francois Hollande said after meeting German Chancellor Angela Merkel March 31 that it is important for Europe to be independent in both manufacturing drones and in...
 
 
Northrop Grumman photograph

AirRobot, Northrop Grumman Remotec sign distribution agreement for unmanned aerial systems

Northrop Grumman photograph An AirRobot unmanned aerial system flies at Fort Benning, Ga.. Northrop Grumman Remotec is the sole reseller of the systems to law enforcement and first responders under a distribution agreement sign...
 

 

Raytheon awarded $528 million AMRAAM contract

Raytheon has been awarded a $528,797,459 fixed-price incentive, firm target contract modification for Advanced Medium Range Air-to-Air Missiles. Raytheon will provide AMRAAM Lot 29 missiles and other AMRAAM system items. This contract involves foreign military sales. Work will be performed in Tucson and is expected to be complete by January 2018. This award was booked...
 
 

Raytheon, DRS team for Army’s third Generation IFLIR B-Kit

Building on their combined platform integration experience, Raytheon and DRS Technologies have entered into a teaming agreement for the U.S. Army’s 3rd Generation Improved Forward Looking Infrared program B-Kit “Raytheon and DRS have teamed to provide an IFLIR solution that provides our military supremacy in reconnaissance, surveillance and target acquisition,” said Dr. Taylor...
 
 

U.S. Air Force awards Raytheon $91.5 million for MALD-J

Raytheon Company received a $91.5 million U.S. Air Force contract modification award for the Miniature Air Launched Decoy Jammer missile. The contract modification is for Lot 8. Work will be performed in Tucson and is expected to be complete by June 2017. This award was booked in the first quarter 2015. MALDÆ is a state-of-the-art,...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>