Business

July 9, 2012

Airbus, Boeing airplane production rates straining supply chain

Airbus and Boeing are gearing up to roll out large commercial jetliners in ever-increasing quantities over the next 10 years, according to a new report from Forecast International, but will component suppliers be able to keep up with demand?

Forecast International’s newly released “The Market for Large Commercial Jet Transports” projects that 14,655 large commercial airliners will be produced in the 10-year period from 2012 to 2021.

The Connecticut-based market research firm estimates the value of this production at $2.04 trillion in constant 2012 U.S. dollars.

Airbus and Boeing, the two dominant manufacturers in the market, are implementing production increases, and are considering additional increases for the future. However, determining how fast and high to increase production is a tricky proposition for the two companies. In addition to the vulnerability of their supply chains, another concern is the overall health of the airline industry.

The desire of Airbus and Boeing to expand production is putting a considerable strain on their suppliers, especially in light of ongoing global economic sluggishness and uncertainty. In such an environment, a number of suppliers may be unable or even unwilling to support continual production increases. Adding to the pressure on suppliers is the fact that Airbus and Boeing are shifting their focus from manufacturing to integration, and are looking to outsource more design and production responsibilities. According to Forecast International Senior Aerospace Analyst Raymond Jaworowski, “The potential for bottlenecks among suppliers means that Airbus and Boeing need to tread cautiously when it comes to future production increases.”

A second major concern is the health of the airline industry. Air traffic is growing, and the industry as a whole is profitable. Still, many individual airlines are experiencing financial difficulties, including some carriers that have hundreds of orders on the books for new aircraft.

At the same time, Airbus and Boeing have considerable incentive to keep production rates high and growing. The two companies hold large numbers of unfilled orders, but this means long waiting times for customers to take delivery of their aircraft, which often results in considerable frustration for these customers. A lack of early delivery slots could also tempt potential buyers to take a serious look at new aircraft emerging from manufacturers outside of the Airbus/Boeing duopoly. Such aircraft include the Bombardier CSeries, the COMAC C919, and the Irkut MC-21.

With an eye on this new competition, Airbus and Boeing have launched development of new, re-engined versions of their narrowbody airliner families. The Airbus A320neo series and the Boeing 737 MAX family will battle each other for the lion’s share of the narrowbody market.

In the widebody segment of the large airliner market, the new Boeing 787 entered service in 2011. The Airbus response to this new aircraft is the A350 XWB, which is currently scheduled to enter service in 2014. The A350 is also aimed at the popular Boeing 777, with the result that Boeing is looking at ways to upgrade the 777.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines December 17, 2014

News: U.S. Air Force tanker platform slated for year-end debut - Boeing is planning for first flight of its 767-2C – upon which the U.S. Air Force’s new KC-46 tanker will be based – by year’s end, six months late. Northrop Grumman wins $657.4 million deal to supply drones to South Korea - Northrop Grumman has won...
 
 

NASA launches new Micro-g NExT for undergraduates

NASA is offering undergraduate students an opportunity to participate in a new microgravity activity called Micro-g Neutral Buoyancy Experiment Design Teams. The deadline for proposals is Jan. 28, 2015. Micro-g NExT challenges students to work in teams to design and build prototypes of spacewalking tools to be used by astronauts for spacewalk training in the...
 
 
launch1

Storm fails to quench liftoff of secret reconnaissance satellite

The fiery launch of an Atlas V (541), among the most powerful of the venerable Atlas family, briefly dispelled the gloom over Californiaís Central Coast on the evening of Dec. 12. A team of personnel from United Launch Allianc...
 

 
Coast Guard photograph

Navy demonstrates unmanned helicopter operations aboard Coast Guard cutter

http://static.dvidshub.net/media/video/1412/DOD_102145893/DOD_102145893-512×288-442k.mp4 Coast Guard photograph An MQ-8B Fire Scout UAS is tested off the Coast Guard Cutter Bertholf near Los Angeles, Dec. 5 2014. The Coast...
 
 
GPS-OCX

GPS III, OCX successfully demonstrate key satellite command, control capabilities

Lockheed Martin and Raytheon successfully completed the fourth of five planned launch and early orbit exercises to demonstrate new automation capabilities, information assurance and launch readiness of the worldís most powerfu...
 
 

Aerojet Rocketdyne successfully demonstrates 3D printed rocket propulsion system for satellites

Aerojet Rocketdyne has successfully completed a hot-fire test of its MPS-120 CubeSat High-Impulse Adaptable Modular Propulsion System. The MPS-120 is the first 3D-printed hydrazine integrated propulsion system and is designed to provide propulsion for CubeSats, enabling missions not previously available to these tiny satellites. The project was funded out of the NASA Office of Chief...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>