Business

July 9, 2012

Boeing Commercial Airplanes CEO focused on production rate increases, new airplane development

Boeing Commercial Airplanes President and CEO Ray Conner laid out his goals during the opening day [July 9] of the Farnborough International Airshow, saying the company is hitting its stride on performance and making significant progress on new airplane programs.

“We’re seeing levels of demonstrated performance that give us confidence in our ability to increase production rates and deliver on our promises to customers,” said Conner. “We’re also working closely with our suppliers to make sure they’re able to increase capacity and make the necessary investments to go up in rate with us.”

The Boeing backlog stands at more than 4,000 airplanes, equating to nearly seven years of production at current rates. In the first half of 2014, Boeing will be producing 30 percent more airplanes than today. In addition, Boeing’s 2012 Current Market Outlook forecasts a market for 34,000 airplanes worth $4.5 trillion over the next 20 years.

Conner also said the right strategies are in place as the company moves toward new product development.

“We have time to make the right decisions when it comes to improving the 777 family thanks to our strong market position,” said Conner. “Meanwhile, the 787-10X will extend and complement the 787 family and be the best in its class. We are absolutely committed to both of these airplanes.”

Conner said Boeing’s new 737 MAX, which will be the most fuel-efficient airplane in its segment with the lowest operating costs, continues to impress customers and gain new orders. The airplane is still targeted for first flight in 2016 with first delivery in 2017.




All of this week's top headlines to your email every Friday.


 
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. â...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 

General Dynamics to continue work on U.S. Air Force GPS III program

General Dynamics Advanced Information Systems, a business unit of General Dynamics, has been awarded a $25.4 million full-production contract from Lockheed Martin to support the U.S. Air Force Global Positioning System (GPS) III Network Communications Element for space vehicles seven and eight. The Air Force’s next-generation GPS III satellites will improve position, navigation and timing...
 

 

Javelin joint venture demonstrates vehicle-mounted missile launch

The Raytheon and Lockheed Martin Javelin Joint Venture recently fired a Javelin missile from a remote weapon station integrated onto a wheeled vehicle at Redstone Arsenal in Huntsville, Ala. The test demonstrated Javelin’s vehicle-launch capability to an international customer that has expressed interest in purchasing vehicles integrated with Javelin. The Javelin missile launched successfully...
 
 

Royal Australian Air Force scores direct hit with JSOW C

The Royal Australian Air Force has successfully tested a Raytheon Joint Standoff Weapon C against a hardened wall target at the RAAF Woomera Test Range. Launched from an F/A-18F Super Hornet at an operationally representative stand-off range and altitude of 25,000 feet, the JSOW C scored a direct hit. The RAAF test marked the third...
 
 

Boeing to assemble 787-10 Dreamliner in South Carolina

Boeing announced July 30 that final assembly of the 787-10, the newest and longest member of the 787 Dreamliner family of airplanes, will take place exclusively in North Charleston, S.C. Boeing will continue to assemble both 787-8s and 787-9s in Everett, Wash., and North Charleston. Design of the 787-10 is underway in Everett, with final...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>