Business

July 11, 2012

Boeing CH-147F Chinook for Canada successfully completes first flight

Boeing photograph

The new Boeing CH-147F Medium-to-Heavy-Lift Helicopter for Canada is progressing ahead of schedule after making its first flight on June 24. The inaugural flight lasted more than 80 minutes and confirmed the initial airworthiness of the aircraft, including its new electrical system and advanced Common Avionics Architecture System cockpit, which reduces pilot workload.

The new Boeing CH-147F Medium-to-Heavy-Lift Helicopter for Canada is progressing ahead of schedule after making its first flight June 24.

“Boeing and the Canadian Department of National Defence are focused on delivering the next generation of advanced vertical-lift aircraft to meet the needs of the Canadian military today and well into the future,” said Leanne Caret, Boeing Vertical Lift vice president and H-47 Programs manager.

The inaugural flight lasted more than 80 minutes and confirmed the initial airworthiness of the aircraft, including its new electrical system and advanced Common Avionics Architecture System cockpit, which reduces pilot workload. After the Chinook’s third flight on June 25, Boeing also completed the Limited Acceptance Test Procedure to validate aircraft performance and systems. The aircraft will continue to progress through ground and flight test activities in the coming months and soon will be joined by the second CH-147F, which is scheduled to roll off the production line later this month.

The Canadian H-47 Chinook, designated CH-147F by the Canadian Forces, provides advanced features that include a newly designed, modernized airframe with a long-range fuel system, upgraded electrical system, and enhanced fully integrated Common Avionics Architecture System cockpit and Digital Automatic Flight Control System. The aircraft also has improved survivability features, including a Directional Infrared Countermeasures system, internal ballistic protection, and crashworthy, armored pilot and co-pilot seats.

The Canadian government awarded Boeing a contract for 15 Medium-to-Heavy-Lift Helicopters and in-service support in June 2009. Aircraft deliveries are scheduled to begin in 2013.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines September 29, 2014

News: U.S. military limits warplanes used for Islamic State bombings - The U.S. is relying mostly on warplanes already positioned in the region for its air war against the Islamic State, as opposed to dispatching a major buildup of aerial forces that happened in previous campaigns.   Business: At DOD, it’s use-it-or-lose-it season - As fiscal 2014...
 
 

News Briefs September 29, 2014

Navy awards ship design grant to UNO The University of New Orleans has received a $210,000 grant from the Navy s Office of Naval Research to test information gathering and analysis techniques intended to improve warship design. The goal for warship designers is to produce a vessel that can be repurposed numerous times throughout its...
 
 
Courtesy photograph

TACP-M ties it all together

Air National Guard photograph by SSgt. Lealan Buehrer Tactical air control party specialists with the 169th Air Support Operations Squadron survey an enemy-controlled landing zone before calling in close-air support Aug. 14, 20...
 

 
Air Force photograph by A1C Thomas Spangler

Nellis aggressor squadron inactivated

Air Force photograph by A1C Thomas Spangler SSgt. Justin White signals to Maj. Sam Joplin to begin taxiing a 65th Aggressor Squadron F-15 Eagle to the runway Sept. 18, 2014, at Nellis Air Force Base Nev. The roles and responsib...
 
 
Army photograph by SSgt. Mary S. Katzenberger

82nd Airborne helps commemorate 70th Anniversary of Operation Market Garden

Army photograph by SSgt. Mary S. Katzenberger A paratrooper assigned to the 82nd Airborne Division, reflects near the grave of a British paratrooper at the Arnhem Oosterbeek War Cemetery, Sept. 14, 2014, in the Netherlands. The...
 
 

Raytheon awarded $251 million Tomahawk missile contract

The U.S. Navy has awarded Raytheon a $251 million contract to procure Tomahawk Block IV tactical cruise missiles for fiscal year 2014 with an option for 2015. The contract calls for Raytheon to build and deliver Tomahawk Block IV cruise missiles to the U.S. Navy and U.K. Royal Navy. Raytheon will also conduct flight tests...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>