Business

July 11, 2012

Boeing P-8I begins flight test program

Boeing photograph

Boeing’s first P-8I aircraft for the Indian Navy began its official flight test program July 7, taking off from Boeing Field in Seattle, Wash., at 9:15 a.m. and landing three hours and 49 minutes later after demonstrating flying qualities and handling characteristics. The flight went as planned with all test objectives met.

Boeing’s first P-8I aircraft for the Indian Navy began its official flight test program July 7, taking off from Boeing Field in Seattle at 9:15 a.m. and landing three hours and 49 minutes later after demonstrating flying qualities and handling characteristics.

The flight went as planned with all test objectives met.

The P-8I is one of eight long-range maritime reconnaissance and anti-submarine warfare aircraft Boeing is building for India as part of a contract awarded in January 2009. During the coming months, Boeing test pilots will put the P-8I, a Next-Generation 737-800 derivative, through its paces over a U.S. Navy test range west of Neah Bay, Wash., and a joint U.S./Canadian test range in the Strait of Georgia.

“Today’s flight is another on-time milestone for the program,” said Leland Wight, Boeing P-8I program manager. “We’ll start out testing the P-8I’s mission system, which includes its sensors and communication systems. The team then will transition to ‘stores’ tests during which the P-8I will carry inert weapon shapes under its wings to demonstrate that the aircraft is capable of carrying all the weapons the Indian Navy will use during regular missions.”

The stores the P-8I will carry will have the identical shape and size of real weapons, including the Harpoon anti-ship missile, depth bombs and torpedoes.

“This is an important milestone for the program and sets the stage for operational testing and weapons certification as we move closer to P-8I aircraft joining the Indian Navy,” said Rear Adm. DM Sudan, assistant chief of Naval Staff (Air), Indian Navy.

P-8I flight and weapons testing follows on the heels of similar testing for the U.S. Navy’s P-8A Poseidon. P-8I is a variant of the Poseidon.

In order to efficiently design and build the P-8I and the P-8A, the Boeing-led team is using a first-in-industry, in-line production process that draws on the company’s Next-Generation 737 production system. Assembly is complete on the second P-8I aircraft and it will make its first flight in the coming weeks.

The P-8I features open system architecture, advanced sensor and display technologies, and a worldwide base of suppliers, parts and support equipment. P-8I aircraft are built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems, BAE Systems and GE Aviation.

The Boeing-led team is on track to deliver the first aircraft to the Indian Navy in 2013.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 18, 2014

News: U.S. mission in Iraq could expand, Pentagon official says - The mission for U.S. troops in Iraq to help Kurdish and Iraqi security forces in their fight against Islamic militants remains limited for now, but may expand after Iraqi leaders form a new government, a Pentagon spokesman said Aug. 19.   Business: Fuel deals top...
 
 

News Briefs August 20, 2014

Trials complete on fourth Coast Guard cutter Ingalls Shipbuilding in Pascagoula, Miss., has completed acceptance sea trials for the company’s fourth U.S. Coast Guard national security cutter, Hamilton. Jim French, Ingalls’ NSC program manager, tells The Mississippi Press) the Hamilton is scheduled to be delivered next month and commissioned on Dec. 6 in Charleston, South...
 
 
Army photograph by Sgt. Thomas Duval

Air Force, Army Aviation come together to complete vital mission in Egypt

Army photograph by Sgt. Thomas Duval Soldiers and airmen load a UH-60 Black Hawk into an Air Force C17 Globemaster III Aug. 19, 2104, at an old Israeli airstrip in the Sinai Peninsula of Egypt. The airstrip is now used by the M...
 

 
Air Force photograph by TSgt. Terri Praden

Joint effort validates ability to move Stryker vehicles via air

Air Force photograph by TSgt. Terri Praden An Army Stryker combat vehicle is guided into a C-17 Globemaster III during a 25th Infantry Division training exercise Aug. 13, 2014, at Joint Base Pearl Harbor-Hickam, Hawaii. The Str...
 
 
NASA image

Ozone-depleting compound persists, NASA research shows

NASA image Satellites observed the largest ozone hole over Antarctica in 2006. Purple and blue represent areas of low ozone concentrations in the atmosphere; yellow and red are areas of higher concentrations. NASA research show...
 
 

F-16V completes major capability milestone

The newest configuration of the F-16 Fighting Falcon, the F-16V, has reached a major capability milestone with the integration of a new Active Electronically Scanned Array radar. Completing this milestone on schedule demonstrates our ability to meet program commitments, said Roderick McLean, vice president and general manager of the F-16/F-22 Integrated Fighter Group at Lockheed...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>