Business

July 11, 2012

Boeing P-8I begins flight test program

Boeing photograph

Boeing’s first P-8I aircraft for the Indian Navy began its official flight test program July 7, taking off from Boeing Field in Seattle, Wash., at 9:15 a.m. and landing three hours and 49 minutes later after demonstrating flying qualities and handling characteristics. The flight went as planned with all test objectives met.

Boeing’s first P-8I aircraft for the Indian Navy began its official flight test program July 7, taking off from Boeing Field in Seattle at 9:15 a.m. and landing three hours and 49 minutes later after demonstrating flying qualities and handling characteristics.

The flight went as planned with all test objectives met.

The P-8I is one of eight long-range maritime reconnaissance and anti-submarine warfare aircraft Boeing is building for India as part of a contract awarded in January 2009. During the coming months, Boeing test pilots will put the P-8I, a Next-Generation 737-800 derivative, through its paces over a U.S. Navy test range west of Neah Bay, Wash., and a joint U.S./Canadian test range in the Strait of Georgia.

“Today’s flight is another on-time milestone for the program,” said Leland Wight, Boeing P-8I program manager. “We’ll start out testing the P-8I’s mission system, which includes its sensors and communication systems. The team then will transition to ‘stores’ tests during which the P-8I will carry inert weapon shapes under its wings to demonstrate that the aircraft is capable of carrying all the weapons the Indian Navy will use during regular missions.”

The stores the P-8I will carry will have the identical shape and size of real weapons, including the Harpoon anti-ship missile, depth bombs and torpedoes.

“This is an important milestone for the program and sets the stage for operational testing and weapons certification as we move closer to P-8I aircraft joining the Indian Navy,” said Rear Adm. DM Sudan, assistant chief of Naval Staff (Air), Indian Navy.

P-8I flight and weapons testing follows on the heels of similar testing for the U.S. Navy’s P-8A Poseidon. P-8I is a variant of the Poseidon.

In order to efficiently design and build the P-8I and the P-8A, the Boeing-led team is using a first-in-industry, in-line production process that draws on the company’s Next-Generation 737 production system. Assembly is complete on the second P-8I aircraft and it will make its first flight in the coming weeks.

The P-8I features open system architecture, advanced sensor and display technologies, and a worldwide base of suppliers, parts and support equipment. P-8I aircraft are built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems, BAE Systems and GE Aviation.

The Boeing-led team is on track to deliver the first aircraft to the Indian Navy in 2013.




All of this week's top headlines to your email every Friday.


 
 

 
NG-people

Northrop Grumman appoints VP, program manager ISR division

Northrop Grumman announced it has appointed Steve Lunny, vice president and program manager for the intelligence, surveillance and reconnaissance division within the company’s Information Systems sector. Lunny will report...
 
 

HELLADS laser completes development

General Atomics Aeronautical Systems, Inc. announced May 21 that the High-Energy Liquid Laser completed the U.S. government acceptance test procedure and is now being shipped to the White Sands Missile Range, N.M. At WSMR, the laser will undergo an extensive series of live fire tests against a number of military targets.  GAASI is a leading...
 
 
boeing-transaero

Boeing delivers Transaero’s first Next-Generation 737-800

Boeing May 22 delivered Transaero’s first Next-Generation 737-800. The airplane, sporting a new livery, arrived at Moscow’s Domodedovo Airport. Boeing May 22 delivered Transaero’s first Next-Generation 737-800. The airpla...
 

 
Boeing photograph

Boeing-upgraded French AWACS take flight

Boeing photograph A French AWACS aircraft patrols the skies as part of a routine mission. The French AWACS fleet is in the midst of the Mid-Life Upgrade that modernizes the capabilities on board. Initial operating capability of...
 
 
boeing-E4B

Boeing returns Air Force E-4B aircraft to service ahead of schedule

Boeing recently completed maintenance on a U.S. Air Force E-4B advanced airborne command post earlier than planned, enabling the Air Force to quickly return the vital aircraft to operational service. It was the first E-4B servi...
 
 
austal-launch

Austal launches Joint High Speed Vessel USNS Brunswick

Austal launched the recently christened USNS Brunswick (JHSV 6) at its state-of-the-art ship manufacturing facility in Mobile, Ala., May 19. With the 338-foot Joint High Speed Vessel entering the water for the first time, the s...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>