Business

July 11, 2012

Boeing P-8I begins flight test program

Boeing photograph

Boeing’s first P-8I aircraft for the Indian Navy began its official flight test program July 7, taking off from Boeing Field in Seattle, Wash., at 9:15 a.m. and landing three hours and 49 minutes later after demonstrating flying qualities and handling characteristics. The flight went as planned with all test objectives met.

Boeing’s first P-8I aircraft for the Indian Navy began its official flight test program July 7, taking off from Boeing Field in Seattle at 9:15 a.m. and landing three hours and 49 minutes later after demonstrating flying qualities and handling characteristics.

The flight went as planned with all test objectives met.

The P-8I is one of eight long-range maritime reconnaissance and anti-submarine warfare aircraft Boeing is building for India as part of a contract awarded in January 2009. During the coming months, Boeing test pilots will put the P-8I, a Next-Generation 737-800 derivative, through its paces over a U.S. Navy test range west of Neah Bay, Wash., and a joint U.S./Canadian test range in the Strait of Georgia.

“Today’s flight is another on-time milestone for the program,” said Leland Wight, Boeing P-8I program manager. “We’ll start out testing the P-8I’s mission system, which includes its sensors and communication systems. The team then will transition to ‘stores’ tests during which the P-8I will carry inert weapon shapes under its wings to demonstrate that the aircraft is capable of carrying all the weapons the Indian Navy will use during regular missions.”

The stores the P-8I will carry will have the identical shape and size of real weapons, including the Harpoon anti-ship missile, depth bombs and torpedoes.

“This is an important milestone for the program and sets the stage for operational testing and weapons certification as we move closer to P-8I aircraft joining the Indian Navy,” said Rear Adm. DM Sudan, assistant chief of Naval Staff (Air), Indian Navy.

P-8I flight and weapons testing follows on the heels of similar testing for the U.S. Navy’s P-8A Poseidon. P-8I is a variant of the Poseidon.

In order to efficiently design and build the P-8I and the P-8A, the Boeing-led team is using a first-in-industry, in-line production process that draws on the company’s Next-Generation 737 production system. Assembly is complete on the second P-8I aircraft and it will make its first flight in the coming weeks.

The P-8I features open system architecture, advanced sensor and display technologies, and a worldwide base of suppliers, parts and support equipment. P-8I aircraft are built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems, BAE Systems and GE Aviation.

The Boeing-led team is on track to deliver the first aircraft to the Indian Navy in 2013.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines December 19, 2014

News: SpaceX’s attempt to land rocket on floating barge postponed - It’s set to be one of the most groundbreaking moments in humanity’s six decades of space exploration. Obama signs $1.1 trillion spending bill into law - President Obama signed the $1.1 trillion federal spending measure into law Dec. 16, officially ending any threat of a government...
 
 

News Briefs December 19, 2014

Trial set for ex-Navy engineer in military secrets case A former Navy civilian engineer is scheduled to stand trial next summer on charges of trying to steal aircraft carrier schematics. Media outlets report that 35-year-old Mostafa Awwad of Yorktown, Va., pleaded not guilty Dec. 17 to two counts of attempted exportation of defense articles and...
 
 
Army photograph by C. Todd Lopez

Army to launch cruise missile-detecting aerostat at Aberdeen Proving Ground

Army photograph by C. Todd Lopez The Army plans to launch an aerostat, part of the “Joint Land Attack Cruise Missile Defense Elevated Netted Sensor,” in late December 2014. The JLENS aerostat will be tethered to the...
 

 
Air Force photograph by SrA. Jordan Castelan

AF delivers Iraqi F-16s for training in US

Air Force photograph by SrA. Jordan Castelan Iraqi air force captain Hama conducts preflight inspections while inside a new to service Iraqi F-16 Fighting Falcon Dec. 17, 2014, located at the nearby Tucson International Airport...
 
 
Air Force photograph by SSgt. Derek VanHorn

Short-notice: A new way to exercise

Air Force photograph by SSgt. Derek VanHorn Airmen from Kadena Air Base, Japan, prepare for an aeromedical evacuation exercise on a KC-135 Stratotanker Dec. 5, 2014, at Misawa Air Base, Japan. The operation was executed in supp...
 
 
Lockheed Martin photograph by Andy Wolfe

Japan, Australia to provide F-35 maintenance sites in Pacific region

Lockheed Martin photograph by Andy Wolfe An F-35C Lightning II joint strike fighter carrier variant prepares to launch from the aircraft carrier USS Nimitz in the Pacific Ocean, Nov. 6, 2014. Japan and Australia will be sharing...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>