Business

July 16, 2012

FAA proposes fining Boeing $13.5 million

by Joan Lowy and Joshua Freed
Associated Press

The Federal Aviation Administration July 13 proposed fining Boeing $13.5 million for failing to meet a deadline to provide airlines with instructions on how to prevent fuel tank explosions like the one that destroyed TWA Flight 800 off the coast of Long Island, N.Y., 16 years ago, killing all 230 people on board.

The fine – the second largest the FAA has ever proposed – underscores the difficulty the agency has had prodding industry to comply with important safety regulations that can be complex or expensive to implement.

In July 2008, then-Transportation Secretary Mary Peters held a news conference along with the FAA and the National Transportation Safety Board to celebrate new regulations aimed at preventing another tragedy like the one in 1996, when a fuel tank on the Boeing 747 exploded minutes after takeoff from John F. Kennedy Airport. Victims’ relatives were on hand for the news conference, which was held in the building where the doomed plane’s wreckage had been reconstructed in the investigation.

Four years later, not only has Boeing been late in meeting those regulations, but airlines are balking at making some of the aircraft fixes they’re required to make.

The longer airlines can delay retrofitting the fuel tanks of older planes, the fewer repairs they’ll have to make because those planes are continually being replaced with newer aircraft with differently designed tanks, said John Goglia, a former NTSB member and expert on aircraft maintenance.

“Every plane they don’t have to retrofit is going to save them a lot of money,” he said.

U.S. airlines, through the trade group Airlines for America, have been asking the FAA to extend the deadlines for retrofitting their fleets, which fall in 2014 and 2017. “There is simply not enough time to retrofit airplanes … by the rule’s deadline,” the group wrote to the FAA on March 28.

July 13, the FAA said it would not issue a blanket extension but would consider extension requests by individual airlines for the 2014 deadline when they must retrofit half their fleets.

“The safety of airline passengers and employees is the highest priority for our members, and as such, we follow the rigorous standards set by the FAA, including only installing FAA-certified modifications on our aircraft,” the airline trade group said in a written statement July 13. “Our members are working with the FAA to complete the approved modifications.”

The FAA’s regulations required aircraft manufacturers to develop design changes and service instructions for installing systems to reduce the risk of fuel tank flammability by Dec. 27, 2010. Other manufacturers met the deadline, but Boeing was 301 days late on providing instruction for its 747 planes and 406 days late for its 757 planes, the FAA said Friday.

“We take this matter very seriously,” Acting FAA Administrator Michael Huerta said.

Boeing Co. spokesman Miles Kotay said the aircraft maker “has made pioneering efforts in the complex process of developing and certifying the fuel-tank inerting systems at issue and is committed to continuing those efforts.”

He said Boeing has put the nitrogen generating systems the FAA wants on all planes it has built since August 2010. And since June 2008, the systems have gone on every 737, he said. The nitrogen makes it harder for volatile gases to ignite. Boeing makes more of those planes than any other model.

The FAA’s penalty involves older 747s as well as the 757, which Boeing no longer makes. Both planes are flown by Delta, United and Continental. The 757 is also flown by American Airlines and US Airways. In total, 383 U.S.-registered planes are affected by these delays, the FAA said.

An investigation by the NTSB determined the TWA explosion was caused by a buildup of oxygen in a partially empty fuel tank while plane sat in the summer sun waiting to take off.

For years, it appeared there was no economical way to redesign fuel tanks on existing planes. But an FAA employee persisted in trying to find a reasonable technological fix to the problem ultimately leading to the solution lauded by officials as example of the agency at its finest at the 2008 news conference.

Goglia said the FAA developed the nitrogen protective system as an affordable, light safety measure – “something Boeing said couldn’t be done – and after all that good work we now have foot-dragging by the industry not to do it.”

The largest fine FAA has ever proposed was $24.2 million against American Airlines for failing to make required repairs to the wiring of some planes. Although that fine was proposed two years ago, the FAA is still in negotiations with the airline – which filed for bankruptcy last year – on a final settlement. The next largest proposed fine was $10.2 million against Southwest in 2008 for safety violations. The fine was settled for $7.5 million.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 31, 2015

News: Carter: Military leaders could arm more troops at home – Following the recent fatal shooting of four Marines and a sailor in Tennessee, Defense Secretary Ash Carter is ordering the military services to consider new policies that would enhance security for troops at home, including potentially arming more personnel.   Business: DOD weighs supplier base,...
 
 

News Briefs July 31, 2015

U.S. delivering eight newer F-16 warplanes to Egypt The United States Embassy in Cairo says the U.S. is delivering eight newer F-16 warplanes to Egypt as part of an ongoing military support package. It says in a July 30 statement that the aircraft, of the current Block 52 production variant, will be flown in from...
 
 
Lockheed Martin photograph

Lockheed Martin successfully tests design changes for Orion spacecraft’s fairing separation system

Lockheed Martin photograph A protective panel for Orion’s service module is jettisoned during testing at Lockheed Martin’s Sunnyvale, California facility. This test series evaluated design changes to the spacecraft’s fair...
 

 

Australian company to provide parts for initial production of Triton UAS

Northrop Grumman has awarded the first Australian supplier contract for the U.S. Navy’s MQ-4C Triton unmanned aircraft system initial production lot to Ferra Engineering. Brisbane-based Ferra Engineering will manufacture mechanical sub-assemblies for the first four Triton air vehicles including structural components. “At Northrop Grumman it’s very important to not only develop...
 
 
Boeing photograph

CH-46 ‘Phrog’ makes its last hop

Boeing photograph The CH-46 Sea Knight helicopter commonly known as the “Phrog,” is set to retire and to be flown one last time by Reserve Marine Medium Helicopter Squadron (HMM) 774 on Aug. 1. The CH-46 Sea Knight is a med...
 
 

Insitu awarded LRIP Lot IV RQ-21A Blackjack Systems contract

Under the terms of its latest contract, Insitu will build six RQ-21A Blackjack systems for the U.S. Navy and Marine Corps. The $78-million Small Tactical Unmanned Aircraft Systems Lot IV Low Rate Initial Production contract is the latest event in the program’s progression toward the Initial Operational Test and Evaluation phase.   “This award will...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>