Space

July 16, 2012

NASA selects Space Launch System advanced booster proposals

NASA has selected six proposals to improve the affordability, reliability and performance of an advanced booster for the Space Launch System.

The awardees will develop engineering demonstrations and risk reduction concepts for SLS, a heavy-lift rocket that will provide an entirely new capability for human exploration beyond low Earth orbit.

“The initial SLS heavy-lift rocket begins with the proven hardware, technology and capabilities we have today and will evolve over time to a more capable launch vehicle through competitive opportunities,” said William Gerstenmaier, associate administrator for the Human Exploration Operations Mission Directorate at NASA Headquarters in Washington. “While the SLS team is making swift progress on the initial configuration and building a solid baseline, we also are looking ahead to enhance and upgrade future configurations of the heavy lift vehicle. We want to build a system that will be upgradable and used for decades.”

Designed to be flexible for launching spacecraft, including NASA’s Orion multipurpose vehicle, for crew and cargo missions SLS will enable NASA to meet the president’s goal of sending humans to an asteroid by 2025 and to Mars in the 2030s. The initial SLS configuration will use two five-segment solid rocket boosters similar to the solid rocket boosters that helped power the space shuttle to orbit. The evolved SLS vehicle will require an advanced booster with significant increase in thrust from any existing U.S. liquid or solid boosters.

Individual awards will vary with a total NASA investment of as much as $200 million.

 

Proposals selected for contract negotiations are:

  • “Subscale Composite Tank Set,” Northrop Grumman Systems Corporation Aerospace Systems
  • “Full-Scale Combustion Stability Demonstration,” Aerojet General Corp.
  • “F-1 Engine Risk Reduction Task,” Dynetics Inc.
  • “Main Propulsion System Risk Reduction Task,” Dynetics Inc.
  • “Structures Risk Reduction Task,” Dynetics Inc.
  • “Integrated Booster Static Test,” ATK Launch Systems Inc.

 

“We are building a new national capability to carry astronauts and science experiments beyond Earth orbit to new destinations in space,” said Todd May, SLS program manager at NASA’s Marshall Space Flight Center in Huntsville, Ala. “Our industry partners have presented a variety of options for reducing risk while increasing performance and affordability, and we’re looking forward to seeing their innovative ideas come to life.”

The proposal selections are the first step in the NASA Research Announcement procurement process. The second step, the formal contract award, will follow after further negotiations between NASA and selected organizations. All funded efforts will demonstrate and examine advanced booster concepts and hardware demonstrations during a 30-month period. This risk mitigation acquisition precedes the follow-on design, development, testing and evaluation competition for the SLS advanced booster currently planned for 2015.

All proposals will be valid for 12 months to allow for a later award should the opportunity become available, unless withdrawn by the offeror prior to award. Successful offerors to this NRA are not guaranteed an award for any future advanced booster acquisition.

The first test flight of NASA’s Space Launch System, which will feature a configuration for a 77-ton lift capacity, is scheduled for 2017. As SLS evolves, a two-stage launch vehicle configuration will provide a lift capability of 143 tons.

Marshall manages the SLS Program for the agency.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines October 24, 2014

News: U.S., South Korea delay transfer of wartime control - The U.S. and South Korea have delayed transferring wartime operational control of allied forces by taking on a “conditions-based approach” and scrapping the previously set deadline of 2015.   Business: Exclusive: Lockheed, Pentagon reach $4 billion deal for more F-35 jets - Lockheed Martin and U.S. defense...
 
 

News Briefs October 24, 2014

French moving troops toward Libyan border A top French military official says the country is moving troops toward the Libyan border within weeks and, along with U.S. intelligence, is monitoring al Qaeda arms shipments to Africa’s Sahel region. A French base will go up within weeks in a desert outpost just a hundred kilometers (60...
 
 
Navy photograph

Navy to commission submarine North Dakota

Navy photograph The PCU North Dakota (SSN 784) during bravo sea trials. The crew performed exceptionally well on both alpha and bravo sea trials. The submarine North Dakota is the 11th ship of the Virginia class, the first U.S....
 

 

Boeing announces SF Airlines order for Boeing converted freighters

Boeing announced Oct. 23 that SF Airlines has placed an order for an undisclosed number of 767-300ER passenger-to-freighter conversions (Boeing Converted Freighters). SF Airlines, a subsidiary of Shenzhen, China-based delivery services company SF Express, will accept its first redelivered 767 in the second half of 2015. “SF Express aims to become China’s most respected and...
 
 
LM-C130

Another Super Herc Little Rock Rollin’

  Lockheed Martin delivered another C-130J Super Hercules to the 61st Airlift Squadron at Little Rock Air Force Base, Ark., Oct. 23. Little Rock AFB’s new C-130J was ferried from the Lockheed Martin Aeronautics facility ...
 
 

United Technologies beats third quarter profit expectations

United Technologies Corp. Oct. 23 reported third-quarter profit of $1.85 billion as sales increased across all its businesses and the aerospace giant reported favorable tax settlements. The Hartford, Conn.,-based company said it had profit of $2.04 per share and earnings, adjusted for non-recurring gains, came to $1.82 per share. The results topped Wall Street expectations,...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>