Space

July 17, 2012

NASA selects launch services contract for three missions

NASA has selected United Launch Services LLC of Englewood, Colo., to launch the Soil Moisture Active Passive, Orbiting Carbon Observatory-2 and Joint Polar Satellite System-1 spacecraft.

The spacecraft will launch in October 2014, July 2014 and November 2016, respectively, aboard Delta II rockets from Complex 2 at Vandenberg Air Force Base in California.

The total value for the SMAP, OCO-2 and JPSS-1 launch services is approximately $412 million. This estimated cost includes the task-ordered launch service for the Delta II plus additional services under other contracts for payload processing, launch vehicle integration, mission-unique launch site ground support and tracking, data and telemetry services.

SMAP will provide global measurements of soil moisture and its freeze-thaw state. These measurements will enhance understanding of processes that link Earth’s water, energy and carbon cycles. SMAP will extend current capabilities in weather and climate prediction. SMAP data will be used to develop improved flood prediction and drought monitoring capabilities. SMAP is managed by NASA’s Jet Propulsion Laboratory in Pasadena, Calif.

OCO-2 will study and make time-dependent global measurements of atmospheric carbon dioxide. It will provide the first complete picture of human and natural carbon dioxide sources and “sinks,” the places where the gas is pulled out of the atmosphere and stored. The observatory’s high-resolution measurements will help scientists better understand the processes that regulate atmospheric carbon dioxide. The OCO-2 project is managed by JPL.

JPSS-1 is the successor to the Suomi-National Polar Partnership spacecraft, which was launched in October 2011 as a joint mission between NASA and the National Oceanic and Atmospheric Administration and operated by the JPSS Program. The JPSS Program is the former National Polar-orbiting Operational Environmental Satellite System Program. The JPSS system includes the satellite’s sensors and ground system supporting civil weather, climate measurements and data sharing with other U.S. agencies and international partners.

JPSS-1 will make afternoon observations as it orbits Earth, providing continuity of critical data and imagery observations for accurate weather forecasting, reliable severe storm outlooks and global measurements of atmospheric and oceanic conditions such as sea surface temperatures and ozone. JPSS-1 will increase the timeliness, accuracy and cost-effectiveness of public warnings and forecasts of weather, climate and other environmental events, reducing the potential loss of human life and property.

NOAA is responsible for the JPSS Program and the JPSS-1 mission. NASA is the program’s procurement agent. The agency’s Goddard Space Flight Center in Greenbelt, Md., is the lead for acquisition and implementation.

NASA’s Launch Services Program at Kennedy Space Center is responsible for launch vehicle program management of the SMAP, OCO-2 and JPSS-1 launch services.




All of this week's top headlines to your email every Friday.


 
 

 
NASA/JPL photograph

NASA’s Dawn spacecraft captures best-ever view of dwarf planet

Zoomed out – PIA19173 Ceres appears sharper than ever at 43 pixels across, a higher resolution than images of Ceres taken by the NASA’s Hubble Space Telescope in 2003 and 2004. NASA’s Dawn spacecraft has retur...
 
 
ATK

ATK completes installation of world’s largest solid rocket motor for ground test

ATK The first qualification motor for NASA’s Space Launch Systems booster is installed in ATK’s test stand in Utah – ready for a March 11 static-fire test. NASA and ATK have completed installing the first Spac...
 
 
ULA photograph

Third Lockheed Martin-built MUOS satellite launched, responding to commands

ULA photograph The U.S. Air Force’s 45th Space Wing successfully launched the third Mobile User Objective System satellite, built by Lockheed Martin, for the U.S. Navy at 8:04 p.m. Jan. 20, 2015, from Launch Complex 41 at...
 

 
ULA photograph

ULA successfully launches Navy’s Mobile User Objective System-3

ULA photograph The U.S. Air Force’s 45th Space Wing successfully launched the third Mobile User Objective System (MUOS) satellite, built by Lockheed Martin, for the U.S. Navy at 8:04 p.m. Jan. 20, 2015, from Launch Comple...
 
 

Aerojet Rocketdyne Propulsion supports launch, flight of third MUOS satellite

Aerojet Rocketdyne played a critical role in successfully placing the third of five planned Mobile User Objective System (MUOS-3) satellites, designed and built by Lockheed Martin, into orbit for the U.S. Navy. The mission was launched from Cape Canaveral Air Force Station in Florida aboard a United Launch Alliance Atlas V rocket, with five Aerojet...
 
 
LM-MUOS-satellite

U.S. Navy poised to Launch Lockheed Martin-built MUOS-3 satellite

The U.S. Navy and Lockheed Martin are ready to launch the third Mobile User Objective System satellite, MUOS-3, from Cape Canaveral Air Force Station, Fla., Jan. 20 aboard a United Launch Alliance Atlas V rocket. The launch win...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>