Space

July 17, 2012

NASA selects launch services contract for three missions

NASA has selected United Launch Services LLC of Englewood, Colo., to launch the Soil Moisture Active Passive, Orbiting Carbon Observatory-2 and Joint Polar Satellite System-1 spacecraft.

The spacecraft will launch in October 2014, July 2014 and November 2016, respectively, aboard Delta II rockets from Complex 2 at Vandenberg Air Force Base in California.

The total value for the SMAP, OCO-2 and JPSS-1 launch services is approximately $412 million. This estimated cost includes the task-ordered launch service for the Delta II plus additional services under other contracts for payload processing, launch vehicle integration, mission-unique launch site ground support and tracking, data and telemetry services.

SMAP will provide global measurements of soil moisture and its freeze-thaw state. These measurements will enhance understanding of processes that link Earth’s water, energy and carbon cycles. SMAP will extend current capabilities in weather and climate prediction. SMAP data will be used to develop improved flood prediction and drought monitoring capabilities. SMAP is managed by NASA’s Jet Propulsion Laboratory in Pasadena, Calif.

OCO-2 will study and make time-dependent global measurements of atmospheric carbon dioxide. It will provide the first complete picture of human and natural carbon dioxide sources and “sinks,” the places where the gas is pulled out of the atmosphere and stored. The observatory’s high-resolution measurements will help scientists better understand the processes that regulate atmospheric carbon dioxide. The OCO-2 project is managed by JPL.

JPSS-1 is the successor to the Suomi-National Polar Partnership spacecraft, which was launched in October 2011 as a joint mission between NASA and the National Oceanic and Atmospheric Administration and operated by the JPSS Program. The JPSS Program is the former National Polar-orbiting Operational Environmental Satellite System Program. The JPSS system includes the satellite’s sensors and ground system supporting civil weather, climate measurements and data sharing with other U.S. agencies and international partners.

JPSS-1 will make afternoon observations as it orbits Earth, providing continuity of critical data and imagery observations for accurate weather forecasting, reliable severe storm outlooks and global measurements of atmospheric and oceanic conditions such as sea surface temperatures and ozone. JPSS-1 will increase the timeliness, accuracy and cost-effectiveness of public warnings and forecasts of weather, climate and other environmental events, reducing the potential loss of human life and property.

NOAA is responsible for the JPSS Program and the JPSS-1 mission. NASA is the program’s procurement agent. The agency’s Goddard Space Flight Center in Greenbelt, Md., is the lead for acquisition and implementation.

NASA’s Launch Services Program at Kennedy Space Center is responsible for launch vehicle program management of the SMAP, OCO-2 and JPSS-1 launch services.




All of this week's top headlines to your email every Friday.


 
 

 
Image courtesy of NASA Ames/JPL-Caltech/T Pyle

NASA’s Kepler reborn, makes first exoplanet find of new mission

Image courtesy of NASA Ames/JPL-Caltech/T Pyle The artistic concept shows NASA’s planet-hunting Kepler spacecraft operating in a new mission profile called K2. Using publicly available data, astronomers have confirmed K2&...
 
 
NASA illustration

NASA, planetary scientists find meteoritic evidence of Mars water reservoir

This illustration depicts Martian water reservoirs. Recent research provides evidence for the existence of a third reservoir that is intermediate in isotopic composition between the Red Planetís mantle and its current atmosphe...
 
 
Lockheed Martin photograph

Lockheed Martin-built MUOS-3 satellite encapsulated in launch vehicle fairing

Lockheed Martin photograph The U.S. Navy’s Mobile User Objective System-3 satellite (above) is encapsulated in its payload fairings for a scheduled Jan. 20, 2015 launch aboard a United Launch Alliance Atlas V rocket. MUOS ope...
 

 
NASA photograph

NASA’s Orion arrives back at Kennedy

NASA photograph NASA’s Orion spacecraft returned to the agency’s Kennedy Space Center in Florida Dec. 18, 2014. The spacecraft flew to an altitude of 3,600 miles in space during a Dec. 5 flight test designed to stre...
 
 

NASA launches new Micro-g NExT for undergraduates

NASA is offering undergraduate students an opportunity to participate in a new microgravity activity called Micro-g Neutral Buoyancy Experiment Design Teams. The deadline for proposals is Jan. 28, 2015. Micro-g NExT challenges students to work in teams to design and build prototypes of spacewalking tools to be used by astronauts for spacewalk training in the...
 
 
launch1

Storm fails to quench liftoff of secret reconnaissance satellite

The fiery launch of an Atlas V (541), among the most powerful of the venerable Atlas family, briefly dispelled the gloom over Californiaís Central Coast on the evening of Dec. 12. A team of personnel from United Launch Allianc...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>