Space

July 17, 2012

NASA selects launch services contract for three missions

NASA has selected United Launch Services LLC of Englewood, Colo., to launch the Soil Moisture Active Passive, Orbiting Carbon Observatory-2 and Joint Polar Satellite System-1 spacecraft.

The spacecraft will launch in October 2014, July 2014 and November 2016, respectively, aboard Delta II rockets from Complex 2 at Vandenberg Air Force Base in California.

The total value for the SMAP, OCO-2 and JPSS-1 launch services is approximately $412 million. This estimated cost includes the task-ordered launch service for the Delta II plus additional services under other contracts for payload processing, launch vehicle integration, mission-unique launch site ground support and tracking, data and telemetry services.

SMAP will provide global measurements of soil moisture and its freeze-thaw state. These measurements will enhance understanding of processes that link Earth’s water, energy and carbon cycles. SMAP will extend current capabilities in weather and climate prediction. SMAP data will be used to develop improved flood prediction and drought monitoring capabilities. SMAP is managed by NASA’s Jet Propulsion Laboratory in Pasadena, Calif.

OCO-2 will study and make time-dependent global measurements of atmospheric carbon dioxide. It will provide the first complete picture of human and natural carbon dioxide sources and “sinks,” the places where the gas is pulled out of the atmosphere and stored. The observatory’s high-resolution measurements will help scientists better understand the processes that regulate atmospheric carbon dioxide. The OCO-2 project is managed by JPL.

JPSS-1 is the successor to the Suomi-National Polar Partnership spacecraft, which was launched in October 2011 as a joint mission between NASA and the National Oceanic and Atmospheric Administration and operated by the JPSS Program. The JPSS Program is the former National Polar-orbiting Operational Environmental Satellite System Program. The JPSS system includes the satellite’s sensors and ground system supporting civil weather, climate measurements and data sharing with other U.S. agencies and international partners.

JPSS-1 will make afternoon observations as it orbits Earth, providing continuity of critical data and imagery observations for accurate weather forecasting, reliable severe storm outlooks and global measurements of atmospheric and oceanic conditions such as sea surface temperatures and ozone. JPSS-1 will increase the timeliness, accuracy and cost-effectiveness of public warnings and forecasts of weather, climate and other environmental events, reducing the potential loss of human life and property.

NOAA is responsible for the JPSS Program and the JPSS-1 mission. NASA is the program’s procurement agent. The agency’s Goddard Space Flight Center in Greenbelt, Md., is the lead for acquisition and implementation.

NASA’s Launch Services Program at Kennedy Space Center is responsible for launch vehicle program management of the SMAP, OCO-2 and JPSS-1 launch services.




All of this week's top headlines to your email every Friday.


 
 

 
nasa-cassini

NASA Cassini images may reveal birth of new Saturn moon

NASA’s Cassini spacecraft has documented the formation of a small icy object within the rings of Saturn that may be a new moon, and may also provide clues to the formation of the planet’s known moons. Images taken w...
 
 

NASA completes LADEE mission with planned impact on Moon’s surface

Ground controllers at NASA’s Ames Research Center in Moffett Field, Calif., have confirmed that NASA’s Lunar Atmosphere and Dust Environment Explorer spacecraft impacted the surface of the moon, as planned, between 9:30 and 10:22 p.m., PDT, April 17. LADEE lacked fuel to maintain a long-term lunar orbit or continue science operations and was intentionally sent...
 
 
Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech

NASA’s Kepler telescope discovers first Earth-size planet in ‘habitable zone’

Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech Kepler-186f resides in the Kepler-186 system about 500 light-years from Earth in the constellation Cygnus. The system is also home to four inner planets, seen lined up...
 

 

Lockheed Martin solar ultraviolet imager installed on GOES-R weather satellite

Lockheed Martin has delivered a new solar analysis payload that will help scientists measure and forecast space weather, which can damage satellites, electrical grids and communications systems on Earth. The Solar Ultraviolet Imager instrument was integrated with the first flight vehicle of the National Oceanic and Atmospheric Administrationís next-generation Geostationary Operational Environm...
 
 
Lockheed Martin photograph

NASA’s Orion Spacecraft powers through first integrated system testing

Lockheed Martin photograph Engineers in the Operations and Checkout Building at NASAís Kennedy Space Center in Florida, perform avionics testing on the Orion spacecraft being prepared for its first trip to space later this yea...
 
 

NASA signs agreement with SpaceX for use of historic launch pad

NASA Kennedy Space Center’s historic Launch Complex 39A, the site from which numerous Apollo and space shuttle missions began, is beginning a new mission as a commercial launch site. NASA signed a property agreement with Space Exploration Technologies Corporation (SpaceX) of Hawthorne, Calif., on Monday for use and occupancy of the seaside complex along Florida’s...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>