Business

July 18, 2012

ATK completes final milestone for Liberty

ATK successfully completed the last Liberty space transportation system milestone under the company’s unfunded Space Act Agreement with NASA for the Commercial Crew Development Program (CCDev-2).

The final milestone under the SAA was a Program Status Review for the Liberty system.

During the PSR, the Liberty team presented NASA with detailed progress of the program, including integrated master schedule, DAC cycle status, system requirements, software status, flight test plan, system safety review, ground processing certification plan and schedule for initial operation capability.

The CCDev-2 Liberty SAA enabled NASA and the Liberty team to share technical information related to the Liberty transportation system during the preliminary design review phase of the program. ATK completed five milestones and held three Technical Interchange Meetings, all on internal funding.

“It has been a privilege working with NASA to complete the SAA for the Commercial Crew program,” said Kent Rominger, ATK vice president and program manager for Liberty. “The feedback we received from the NASA Liberty team has helped further the development of the entire system and we believe ensures the program is on target for Liberty to provide a capable and safe commercial transportation to the International Space Station by mid-decade.”

Currently, Liberty’s schedule includes unmanned test flights in 2014 and 2015, followed by the first crewed flight in late 2015 with Liberty astronauts. Commercial operational flights to take NASA astronauts to the ISS would begin in 2016.

ATK also hosted a Liberty Supplier conference the day following the PSR. This meeting, held in Florida, brought together more than 20 of Liberty’s major suppliers to support Liberty development activities.

“Our supply base is critical to Liberty’s success as we move quickly through development of the entire system,” said Rominger. “As a commercial program we need to ensure we are a strong team in order to provide the best service and grow a profitable business.”

Liberty is a complete commercial crew space system that includes a composite spacecraft, abort system, launch vehicle and ground and mission operations, all of which were designed from inception to meet NASA’s human-rating requirements. ATK is the prime contractor with Astrium and Lockheed Martin serving as major subcomponent providers. Additional subcontractors for Liberty include Safran/Snecma, Moog Inc., Honeywell, Astrotech Space Operations (ASTC), Aerojet, Reynolds, Smith and Hills, Teledyne Brown, Dynamic Concepts, Inc. and Hamilton Sundstrand.

The Liberty system team is located across 17 states including Alabama, Arizona, California, Colorado, Connecticut, Florida, Illinois, Indiana, Maryland, Mississippi, Missouri, New York, Ohio, Oregon, Utah, Virginia and Washington. The commercial program will sustain thousands of jobs as well as bring approximately 600 new jobs across the country.




All of this week's top headlines to your email every Friday.


 
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. â...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 

General Dynamics to continue work on U.S. Air Force GPS III program

General Dynamics Advanced Information Systems, a business unit of General Dynamics, has been awarded a $25.4 million full-production contract from Lockheed Martin to support the U.S. Air Force Global Positioning System (GPS) III Network Communications Element for space vehicles seven and eight. The Air Force’s next-generation GPS III satellites will improve position, navigation and timing...
 

 

Javelin joint venture demonstrates vehicle-mounted missile launch

The Raytheon and Lockheed Martin Javelin Joint Venture recently fired a Javelin missile from a remote weapon station integrated onto a wheeled vehicle at Redstone Arsenal in Huntsville, Ala. The test demonstrated Javelin’s vehicle-launch capability to an international customer that has expressed interest in purchasing vehicles integrated with Javelin. The Javelin missile launched successfully...
 
 

Royal Australian Air Force scores direct hit with JSOW C

The Royal Australian Air Force has successfully tested a Raytheon Joint Standoff Weapon C against a hardened wall target at the RAAF Woomera Test Range. Launched from an F/A-18F Super Hornet at an operationally representative stand-off range and altitude of 25,000 feet, the JSOW C scored a direct hit. The RAAF test marked the third...
 
 

Boeing to assemble 787-10 Dreamliner in South Carolina

Boeing announced July 30 that final assembly of the 787-10, the newest and longest member of the 787 Dreamliner family of airplanes, will take place exclusively in North Charleston, S.C. Boeing will continue to assemble both 787-8s and 787-9s in Everett, Wash., and North Charleston. Design of the 787-10 is underway in Everett, with final...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>