Business

July 23, 2012

Boeing F-15E radar modernization program begins second LRIP phase

Boeing said July 23 the U.S. Air Force has granted the F-15E Radar Modernization Program approval to begin Low Rate Initial Production 2 of 10 APG-82(V)1 Active Electronically Scanned Array radar systems.

“This is a great step forward for the Radar Modernization Program,” said Roger Besancenez, Boeing F-15 Program vice president. “With the F-15E RMP, Boeing is providing new technology and improved system reliability to ensure the Air Force has all the capability necessary to achieve total air-to-air and air-to-ground dominance well into the future.”

Boeing received Milestone C authorization for six systems under LRIP 1 in September 2011. Installation of the Raytheon-built AESA radar systems is scheduled to begin in the third quarter of 2013.

The RMP is undergoing an aggressive flight test program at Eglin Air Force Base, Fla., and Nellis Air Force Base, Nev. Boeing and Raytheon are analyzing data throughout the test phase to verify that the system’s performance meets the customer’s rigorous specifications.

The RMP is the latest active F-15E fleet modification that the Air Force has identified in its Modernization Sustainment Plan.

The RMP APG-82(V)1 AESA radar will replace the F-15E strike fighter’s current APG-70 Mechanically Scanned Array radar. The AESA provides improved radar reliability, maintainability and performance, as well as reduced support costs. When integrated into the F-15E weapons system, the AESA radar will significantly improve detection and tracking of enemy targets.

Other RMP elements include a wideband radome, modified environment control system, and modified radio frequency tunable filters, which allow the radar and electronic warfare system to operate simultaneously.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines September 29, 2014

News: U.S. military limits warplanes used for Islamic State bombingsĀ - The U.S. is relying mostly on warplanes already positioned in the region for its air war against the Islamic State, as opposed to dispatching a major buildup of aerial forces that happened in previous campaigns.   Business: At DOD, it’s use-it-or-lose-it seasonĀ - As fiscal 2014...
 
 

News Briefs September 29, 2014

Navy awards ship design grant to UNO The University of New Orleans has received a $210,000 grant from the Navy s Office of Naval Research to test information gathering and analysis techniques intended to improve warship design. The goal for warship designers is to produce a vessel that can be repurposed numerous times throughout its...
 
 
Courtesy photograph

TACP-M ties it all together

Air National Guard photograph by SSgt. Lealan Buehrer Tactical air control party specialists with the 169th Air Support Operations Squadron survey an enemy-controlled landing zone before calling in close-air support Aug. 14, 20...
 

 
Air Force photograph by A1C Thomas Spangler

Nellis aggressor squadron inactivated

Air Force photograph by A1C Thomas Spangler SSgt. Justin White signals to Maj. Sam Joplin to begin taxiing a 65th Aggressor Squadron F-15 Eagle to the runway Sept. 18, 2014, at Nellis Air Force Base Nev. The roles and responsib...
 
 
Army photograph by SSgt. Mary S. Katzenberger

82nd Airborne helps commemorate 70th Anniversary of Operation Market Garden

Army photograph by SSgt. Mary S. Katzenberger A paratrooper assigned to the 82nd Airborne Division, reflects near the grave of a British paratrooper at the Arnhem Oosterbeek War Cemetery, Sept. 14, 2014, in the Netherlands. The...
 
 

Raytheon awarded $251 million Tomahawk missile contract

The U.S. Navy has awarded Raytheon a $251 million contract to procure Tomahawk Block IV tactical cruise missiles for fiscal year 2014 with an option for 2015. The contract calls for Raytheon to build and deliver Tomahawk Block IV cruise missiles to the U.S. Navy and U.K. Royal Navy. Raytheon will also conduct flight tests...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>