Defense

July 23, 2012

Navy carriers prepare for X-47B unmanned aircraft arrival next year

Air traffic controllers aboard USS Harry S. Truman receive training and provide fleet feedback on Navy Unmanned Combat Air System Demonstration software during recent carrier sea trials.

The Navy is one year away from landing its first unmanned jet aircraft aboard a carrier after completing the most recent round of surrogate tests aboard USS Harry S. Truman.

In early July, members from the Unmanned Combat Air System Demonstration carrier integration team engaged in extensive software testing aboard Truman to validate the concept of autonomous UAV operations around an aircraft carrier and prepare for the X-47B unmanned aircraft’s arrival on a carrier next year.

“Demonstrating our concept of operations and making sure the Carrier Segment is performing as advertised is a huge milestone for the program,” said Capt. Jaime Engdahl, Navy UCAS program manager. “The crew, equipment, and program team performed exceptionally well during all planned test events and the Harry S Truman is ready for our next phase of X-47B testing.”

Last year, the team conducted surrogate testing aboard USS Dwight D. Eisenhower with a manned F/A-18 to evaluate ship systems, avionics systems and early versions of the unmanned vehicle software. The team is now back at sea aboard Truman with the F/A-18 aircraft, testing precision landing performance with the latest X-47B software and hardware configuration.

“The purpose of the UCAS-D carrier integration effort is to mature precision carrier-landing technologies for unmanned systems and digitize the communications and navigation information flow,” Engdahl said. “Since the X-47B is unmanned, the aircraft operates using digital messages from the mission operator and shipboard controllers, rather than through verbal instructions. The carrier requires modification for unmanned flight operations, and the integration effort performs these in a way that minimally affects existing hardware, training and procedures.”

During at-sea testing, the Navy UCAS team gathered valuable feedback from fleet air-traffic controllers and air-department personnel about the usability of the new software and lessons learned about how to most effectively operate UAVs in the carrier environment.

“The new software used during these tests is more comprehensive than earlier versions,” said Cmdr. Jeff Dodge, Navy UCAS carrier integration team co-lead. “There have been significant changes made to the user interface and navigation systems. Data compiled during surrogate flights allows us to determine the effectiveness of the new software and how it supports the carrier environment.”

Throughout the remainder of 2012, the Navy UCAS program will conduct carrier suitability and system performance testing with both X-47B aircraft at Pax River. These tests will include arrested landings, catapult launches, and flight deck operations at the land-based facility and establish the aircraft’s ability to conduct precision approaches to the aircraft carrier.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 22, 2014

News: GAO: Pentagon violated law with Bergdahl swap - Congressional investigators say the Pentagon violated the law when it swapped five Taliban leaders for Army Sgt. Bowe Bergdahl, who was held prisoner in Afghanistan for five years.   Business: U.S. Air Force issues RFI for new rocket engine - The US Air Force is officially looking into...
 
 

News Briefs August 22, 2014

U.S. military deaths in Afghanistan at 2,200 As of Aug. 20, 2014, at least 2,200 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,821 military service members have died in Afghanistan as a result...
 
 
navair-triton

MQ-4C Tritons to arrive at Pax River this fall

  MQ-4C Triton test air vehicles at Northrop Grumman’s facility in Palmdale, Calif., will fly cross-country to Naval Air Station Patuxent River, Md., this fall. The MQ-4C completed a test flight Aug. 19 with updated ...
 

 
Boeing photograph

Boeing program completes critical design, safety reviews

Boeing photograph Boeing recently completed the Phase Two Spacecraft Safety Review of its Crew Space Transportation-100 spacecraft and the Critical Design Review of its integrated systems, meeting all of the companyís Commerci...
 
 
global-hawk2

Air Combat Command loans Global Hawk to GVCTF

Air Force photograph by Jennifer Romo The 412th Test Wing’s Global Vigilance Combined Test Force received a Global Hawk Block 40 Aug. 6, on loan from Air Combat Command. Tail number 2035, from Grand Forks AFB, N.D., is jo...
 
 

NASA awards program analysis, Control Bridge III Contract

NASA has awarded the Program Analysis and Control III Bridge contract for support services to ASRC Research & Technology Solutions of Beltsville, Md. The cost-plus-fixed-fee, indefinite delivery/indefinite quantity basic contract has a minimum ordering value of $1 million and a maximum ordering value of $37 million, with a performance period beginning Aug. 30 through Feb....
 




One Comment


  1. [...] more on AerotechNews.com. Filed Under: Maritime & [...]



Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>