Business

July 23, 2012

Northrop Grumman delivers first B-1 radar modification kit

Northrop Grumman has delivered the first B-1 bomber radar prime mission equipment kit under a series of U.S. Air Force contracts worth a combined total of $161 million for the B-1′s Radar Reliability and Maintainability Program.

One radar kit has since been installed on a B-1 aircraft based at Ellsworth Air Force Base, S.D. Two additional kits have been delivered to Dyess Air Force Base, Texas, and were installed in June.

“Fielding the B-1 Radar RMIP is a huge win for the Air Force,” said Maj. Daniel P. Walters, Air Force program manager, B-1 radar. “The upgrade is projected to significantly enhance B-1 mission readiness both at home and in combat, allowing operators to put bombs on a target for many years to come.”

The Air Force awarded Northrop Grumman a $65 million RMIP base contract in September 2010 for 22 modification kits, along with test benches, spares, repairs, and technical data and services. Options worth an additional $95 million have since been awarded for another 38 kits. The RMIP replaces two line-replaceable units in the B-1′s AN/APQ-164 radar to improve both its reliability and maintainability.

“This investment will maintain the B-1′s critical capabilities by improving the reliability of radar system and reducing the manpower needed to maintain it,” said Tim Winter, vice president of Global Sensor Solutions at Northrop Grumman. “With this upgrade, the B-1 fleet will remain combat-ready for our war fighters.”

Northrop Grumman developed the RMIP upgrade prior to receiving the 2010 production contract. The modification kit includes a new radar receiver and transmitter, a radar processing computer and a reconfigured software package. The new hardware will provide flexibility to expand the bomber’s mission capabilities as new technologies become available. The B-1 fleet was manufactured primarily during the 1980s.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>