Defense

July 24, 2012

Army hosts Network Industry Day

Tags:
by Claire Heininger Schwerin
Army News

A Warfighter Information Network-Tactical Tactical Communications Node is pictured at White Sands Missile Range, N.M., during NIE 12.2 in May 2012. The July 19, 2012, industry day focused on opportunities to participate in NIE 13.2 next year.

As it looks ahead to more Network Integration Evaluations, the Army hosted an industry day at Aberdeen Proving Ground, Md., July 19, to discuss opportunities to collaborate on the future tactical communications network.

The goal of the event was to keep the industrial base informed of upcoming requirements to support Network Integration Evaluation, or NIE, 13.2 to be held in May 2013, and to provide updates on Capability Set Management and the Army’s Agile Process for acquisition, which the NIE supports.

Attended by more approximately 200 industry partners, the event outlined NIE participation opportunities with a focus on NIE 13.2, the fifth iteration in a series of semi-annual field exercises designed to further integrate and rapidly advance the Army’s tactical network. Private companies play a critical role in the Agile Process by bringing forward emerging technologies for evaluation at the NIE to determine whether they meet the Army’s defined capability gaps.

A soldier from 2nd Brigade, 1st Armored Division uses the Joint Tactical Radio Systems Rifleman Radio to communicate during the Network Integration Evaluation 12.2 at White Sands Missile Range, N.M., in May 2012. The July 19, 2012, industry day focused on opportunities to participate in NIE 13.2 next year.

Army leaders described various mechanisms for purchasing systems that show merit at future NIEs, including issuing a Request for Proposals solicitation that will result in an NIE support contract award with an option for production quantities after the NIE is completed. This will allow the Army to execute an option to procure production material and field it to soldiers more quickly than current acquisition methods allow.

“We are trying to speed the process up,” said Brig. Gen. Daniel Hughes, director of Army System of Systems Integration, noting that traditional procurement cycles can take up to 10 years to develop a product and field it to the force.

“If we did that with cell phone technology, we’d be fielding the Motorola flip phone right now,” Hughes said.

The industry day coincided with the release of the Army’s Sources Sought notice to identify emerging capabilities to be evaluated against a set of entrance criteria for an opportunity to participate in NIE 13.2. The Sources Sought seeks solutions with a narrow focus on specific identified gaps in the current and evolving networked equipment solution set, intended to meet operational needs.

“The gaps that are put out are very important,” said Jennifer Zbozny, chief engineer for the Army Program Executive Office for Command, Control and Communications-Tactical. “This isn’t a science experiment – we’re evaluating them to potentially field.”

The identified gaps are: commander’s applications for mobile and handheld platform, enhanced command post collaboration and visualization, company information architecture, network operations visualized in the command post, aerial layer network – air ground integration, integrated employment of LandWarNet installation and training resources, Warfighter Information Network-Tactical interoperable satellite communications and ground to ground capability on heavy brigade combat team maneuver platforms.

Interest from industry in NIE participation continues to grow. While 43 companies were interested in participating in NIE 12.1 in fall 2011, 105 companies sought to participate in NIE 12.2 in spring 2012, and 146 companies are seeking to participate in NIE 13.1 this fall.

To help facilitate industry success, Army leaders also shared lessons-learned from previous NIE cycles, such as bringing precise requirements for training and understanding how a certain technology will fit into the integrated brigade combat team formation that conducts the events at Fort Bliss, Texas, and White Sands Missile Range, N.M.

“We have to have a good idea of how many soldiers at what echelons should evaluate (a solution),” said Brig. Gen. Randal Dragon, commander of the Brigade Modernization Command. “How is this going to work, how will it meet the gap we’ve got, and how will it work in the operational scenario?”

Industry members also toured Aberdeen Proving Ground laboratories that support industry candidate assessments, integration and validation prior to the NIE. While synchronized fielding efforts are underway for Capability Set 13, the first integrated set of advanced tactical communications equipment that will be delivered to brigade combat teams starting this fall, the Army is already laying the groundwork in the laboratories for Capability Set 14. Upgrades with Capability Set 14 include integrating the network on heavy vehicle platforms and greater convergence of operations and intelligence applications.

The ongoing risk reduction in Aberdeen Proving Ground laboratories is critical to the successful execution of the NIEs, which leverage 3,800 soldiers conducting realistic operations in order to measure network performance. By replicating the NIE network in the lab environment, engineers can resolve integration issues before systems get to the field – reducing test costs and allowing soldiers to focus on the fight instead of the technology behind it.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 31, 2015

News: Carter: Military leaders could arm more troops at home – Following the recent fatal shooting of four Marines and a sailor in Tennessee, Defense Secretary Ash Carter is ordering the military services to consider new policies that would enhance security for troops at home, including potentially arming more personnel.   Business: DOD weighs supplier base,...
 
 

News Briefs July 31, 2015

U.S. delivering eight newer F-16 warplanes to Egypt The United States Embassy in Cairo says the U.S. is delivering eight newer F-16 warplanes to Egypt as part of an ongoing military support package. It says in a July 30 statement that the aircraft, of the current Block 52 production variant, will be flown in from...
 
 
Lockheed Martin photograph

Lockheed Martin successfully tests design changes for Orion spacecraft’s fairing separation system

Lockheed Martin photograph A protective panel for Orion’s service module is jettisoned during testing at Lockheed Martin’s Sunnyvale, California facility. This test series evaluated design changes to the spacecraft’s fair...
 

 

Australian company to provide parts for initial production of Triton UAS

Northrop Grumman has awarded the first Australian supplier contract for the U.S. Navy’s MQ-4C Triton unmanned aircraft system initial production lot to Ferra Engineering. Brisbane-based Ferra Engineering will manufacture mechanical sub-assemblies for the first four Triton air vehicles including structural components. “At Northrop Grumman it’s very important to not only develop...
 
 
Boeing photograph

CH-46 ‘Phrog’ makes its last hop

Boeing photograph The CH-46 Sea Knight helicopter commonly known as the “Phrog,” is set to retire and to be flown one last time by Reserve Marine Medium Helicopter Squadron (HMM) 774 on Aug. 1. The CH-46 Sea Knight is a med...
 
 

Insitu awarded LRIP Lot IV RQ-21A Blackjack Systems contract

Under the terms of its latest contract, Insitu will build six RQ-21A Blackjack systems for the U.S. Navy and Marine Corps. The $78-million Small Tactical Unmanned Aircraft Systems Lot IV Low Rate Initial Production contract is the latest event in the program’s progression toward the Initial Operational Test and Evaluation phase.   “This award will...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>