Business

July 26, 2012

Northrop Grumman G/ATOR radar system delivered for start of government developmental testing

Northrop Grumman’s AN/TPS-80 Ground/Air Task Oriented Radar system has been delivered to Surface Combat Systems Center Wallops Island in Eastern Virginia for the government to begin its first and second phases of Developmental Test.

The final phase of DT and the Operational Assessment for G/ATOR will be conducted in Yuma, Ariz.

Currently under development for the U.S. Marine Corps, G/ATOR is the first ground-based, multirole radar to be developed for the U.S. Department of Defense.

At Northrop Grumman’s Baltimore facility, the G/ATOR system has already completed part one of the System Performance Qualification Testing in addition to rigorous performance verification testing at the system and subsystem levels. G/ATOR accumulated a significant number of hours of live aircraft testing during that time. This live target testing provided an added measure of confidence that G/ATOR performance is consistent with performance requirements against a wide array of target types and sizes, speeds, ranges and trajectories.

“Throughout these tests, G/ATOR has demonstrated an unprecedented ability to provide enhanced information and surveillance data to the warfighter,” said Steve McCoy, vice president for tactical sensor solutions at Northrop Grumman. “With G/ATOR’s modular, scalable architecture, we can get that capability into the field sooner and at lower cost to the Department of Defense.”

With its ability to intelligently and adaptively allocate its myriad of sensor capabilities, G/ATOR is designed to detect and track a wide variety of threats, including manned aircraft, cruise missiles and unmanned autonomous systems. G/ATOR is built with an open, scalable architecture to enable digital interoperability and allow new capabilities to be added through software-only updates.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines March 27, 2015

News General Dynamics withdraws as T-100 prime contractor General Dynamics Information Systems and Technology has withdrawn itself as the prime contractor on the T-100, the offering for the T-X trainer replacement program based on the Alenia Aermacchi M-346 design.   Business SpaceX’s fight with U.S. Air Force called a clash of perceptions Billionaire Elon Musk’s...
 
 

News Briefs March 27, 2015

Contractor extradited from Iraq pleads guilty in bribes case A man extradited from Iraq in a military contract bribery case has pleaded guilty to three charges in an agreement with federal prosecutors. U.S. District Judge Thomas Rose has scheduled sentencing for July 1 for Metin Atilan. His attorney, Nick Gounaris, says the two sides agreed...
 
 

Ninth Boeing GPS IIF reaches orbit, sends first signals

Boeing Global Positioning System (GPS) IIF satellites are steadily replenishing the orbiting constellation, continuing to improve reliability and accuracy for users around the world. The ninth GPS IIF reached orbit about three hours, 20 minutes after launching today aboard a United Launch Alliance (ULA) Delta IV rocket from Cape Canaveral Air Force Station, Fla., and...
 

 

F-35 Lightning II costs drop, report shows

A recent account of F-35 Lightning II aircraft program costs shows decreases, the Air Force’s F-35 program executive officer told reporters in a media roundtable March 24, 2015. Lt. Gen. Christopher C. Bogdan, citing this year’s selected acquisition report on the aircraft, called the roundtable to clarify cost and performance facts. He also acknowledged the...
 
 
NG-growler2

Northrop Grumman delivers center/aft ‘shipset’ for first international EA-18G Growler

Northrop Grumman photograph Northrop Grumman mechanics perform final quality inspections on the center/aft fuselage shipset produced by the company for the first Australian EA-18G Growler. The subassembly will be delivered to B...
 
 
Navy photograph by Monica McCoy

Navy conducts production acceptance test of Tomahawk missile

Navy photograph by Monica McCoy Members of the Explosive Ordnance Disposal Technology Division team at Naval Surface Warfare Center, Indian Head prepare a Tomahawk missile for a functional ground test at the Large Motor Test Fa...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>