Space

August 6, 2012

Aerojet Propulsion helps land Mars Science Laboratory


 
Aerojet, a GenCorp company, announced Aug. 3 that its monopropellant hydrazine thrusters helped guide NASA’s Mars Science Laboratory to a successful landing on the red planet at 10:32 p.m., PDT, Aug. 5.

The much-anticipated landing delivered the rover Curiosity to the Martian surface.

Aerojet engines assisted with entry, descent and landing. The company’s thrusters also provided attitude control and trajectory correction maneuvers during the MSL’s transit to Mars.

MSL carried eight Aerojet MR-111C 1.0 lbf thrusters, eight Aerojet MR-107U 68 lbf thrusters and eight Aerojet MR-80B 800-lbf thrusters with a throttleable thrust range of >100:1. The 68 lbf and the 800 lbf thrusters supported the actual landing.

In June 2012, NASA reduced the MSL target landing area to about 12 miles long and four miles wide (20 kilometers by seven kilometers) on a site near the northern flank of Mount Sharp, inside Gale Crater on Mars. The landing timeline began with guided entry in the upper atmosphere of Mars and concluded with the sky crane drop-off of Curiosity and the remaining spacecraft fly-away.

This was the most complicated landing ever attempted on a planet.

“Aerojet joins NASA and the Jet Propulsion Laboratory in congratulating the MSL team on tonight’s historic landing,” said Julie Van Kleeck, Aerojet vice president of Space and Launch Systems. “Aerojet thrusters brought Viking 1 and 2 and the Phoenix Mars Lander to safe arrivals on Mars and we were confident that our MSL thrusters would once again help deliver success.”

The three different types of thrusters aboard the MSL were designed and manufactured at Aerojet’s Redmond, Wash. facility under contract to the Jet Propulsion Laboratory. The 800 lbf throttling engines were tested at Aerojet’s Sacramento facility.

NASA’s Jet Propulsion Laboratory in Pasadena, Calif. has trimmed the distance Curiosity will drive after landing by almost half, allowing the rover to reach the mountain months earlier. NASA determined it was possible to adjust landing plans because of increased confidence in the precision landing technology aboard the MSL spacecraft. Rock layers located in the mountain are the prime location for rover research.




All of this week's top headlines to your email every Friday.


 
 

 
VG01

Space tourism rocket explodes in desert

MOJAVE, Calif. – A Virgin Galactic space tourism rocket exploded Oct. 31 during a test flight, killing a pilot aboard and seriously injuring another while scattering wreckage in Southern California’s Mojave Desert, ...
 
 

Headlines October 29, 2014

News: Unmanned rocket explodes just six seconds after taking off - A NASA rocket due to be visible across the East Coast on its way to the International Space Station has blown up on the Launchpad. IG: Former chief of wounded warrior office broke law, DOD regs - The Defense Department inspector general has recommended “corrective action”...
 
 

News Briefs October 29, 2014

F-35C makes first landing at Virginia Beach Navy base The Navy says an operational F-35C joint strike fighter has landed at Naval Air Station Oceana for the first time. Naval Air Station Oceana is the Navy’s master jet base on the East Coast. The Navy says the plane came to the Virginia Beach base Oct....
 

 

Time to turn to American technology for space launch

For the first time since the Cold War, the United States has deployed armored reinforcements to Europe. To counter Russia’s aggression, several hundred troops and 20 tanks are now in the Baltic. Yet the U.S. military is still injecting millions into the Russian military industrial complex. In late August, the United Launch Alliance – the...
 
 
Air Force photograph by Joe Davila

Boeing, Air Force demonstrate Minuteman III readiness in flight test

Air Force photograph by Joe Davila Boeing supported the launch of an unarmed Minuteman III intercontinental ballistic missile at Vandenberg Air Force Base, Calif., on Sept. 23, 2014. Boeing supported the U.S. Air Force’s succ...
 
 

Pentagon going to court for refusing to release Sikorsky data

PETALUMA, Calif. – The Pentagon is refusing to release any data on any prime contractors participating in the 25-year-old Comprehensive Subcontracting Plan Test Program. The American Small Business League launched a program in 2010 to expose the fraud and abuse against small businesses the CSPTP had allowed. As a test the ASBL requested the most...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>