Space

August 6, 2012

ATK Technologies on display as NASA’s Mars rover makes successful landing

ATK technologies and capabilities played mission-critical roles throughout the entire journey of NASA’s Mars Science Laboratory “Curiosity” rover, which successfully landed Aug. 5 inside Mars’ Gale Crater.

As it starts its two-year mission, Curiosity will gather data to help assess whether Mars ever had an environment capable of supporting microbial life.

ATK contributed technical and manufacturing expertise from the launch last year, through the nine-month flight to Mars, during descent to the surface, and now in the exploration phase of the mission.

ATK’s Clearfield, Utah and Iuka, Miss. facilities built the lightweight composite heat shield, interstage adapter and boat tail sections of the United Launch Alliance Atlas V that launched Curiosity in November 2011.

ATK products supported the flight to Mars and the challenging descent to and landing on the Martian surface. ATK’s Commerce, Calif. facility designed and built five propellant tanks, two of which supplied propellant to cruise thrusters to guide the spacecraft on its journey to the Red Planet; the other three provided propellant to the descent thrusters that successfully contributed to the surface landing. ATK Engineering Services in Pasadena, Calif. supported the design development of the Terminal Descent Sensor, which guided the descent stage.

ATK engineering teams in Pasadena, Calif. and Beltsville, Md. also provided key technical support to develop a number of the science instruments aboard the mobile laboratory. They provided the detail design engineering and supported the fabrication, integration and test of the rover’s Remote Sensing Mast Deploy Mechanism, as well as mechanical and thermal design and fabrication for the cornerstone Chemistry/Mineralogy instrument. CheMin is an X-ray diffraction and fluorescence instrument designed to identify and quantify the minerals in rocks and soils. Another major role included contributions to the design and development of a suite of instruments named Sample Analysis at Mars (SAM). These instruments will analyze samples of material collected and delivered by the rover’s robotic arm.

The data gathered by Curiosity from rock and soil samples will help determine whether conditions are favorable for future missions that could send humans to Mars. The rover will use 10 science instruments to examine rocks, soil and the atmosphere. The mobile laboratory will carry the most advanced payload of scientific gear ever used on Mars’ surface, according to NASA.

ATK Engineering Services in Pasadena, Calif. and Integrated Thermal Systems in Beltsville, Md. also provided support in the development of the thermal subsystem that protected Curiosity from the harsh environment it encountered on the Martian surface. At a design review, it was described as the most challenging thermal design ever seen.

“We are extremely proud to have played a role in this incredible achievement for NASA and the Jet Propulsion Laboratory, two of our long-standing customers,” said Dianne Sosa, ATK vice president of Engineering Services. “Our employees dedicated years of planning and preparation to ensure mission success for this newest voyage of exploration on Mars. We congratulate the NASA team for a successful landing and look forward to the key scientific findings that will help determine the potential for life on Mars.”

“We are honored to have been involved on almost every JPL/Mars mission,” said Gary Kawahara, ATK vice president and general manager, Space Components Division, Liquid Propulsion Products. “ATK’s diaphragm propellant tanks have demonstrated their reliability and safety on Mars programs from Mariner to Viking in the 1960s and 70s to the most recent Phoenix Lander. ATK has a perfect track record of more than 5,600 total tank deliveries with zero failures. As the journey to Mars is now complete and Curiosity is safely on the planet’s surface, our job has successfully concluded.”

The Mars Science Laboratory is managed for NASA’s Science Mission Directorate, Washington, D.C. by the Jet Propulsion Laboratory, a division of the California Institute of Technology, in Pasadena, Calif.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines October 29, 2014

News: Unmanned rocket explodes just six seconds after taking off - A NASA rocket due to be visible across the East Coast on its way to the International Space Station has blown up on the Launchpad. IG: Former chief of wounded warrior office broke law, DOD regs - The Defense Department inspector general has recommended “corrective action”...
 
 

News Briefs October 29, 2014

F-35C makes first landing at Virginia Beach Navy base The Navy says an operational F-35C joint strike fighter has landed at Naval Air Station Oceana for the first time. Naval Air Station Oceana is the Navy’s master jet base on the East Coast. The Navy says the plane came to the Virginia Beach base Oct....
 
 

Time to turn to American technology for space launch

For the first time since the Cold War, the United States has deployed armored reinforcements to Europe. To counter Russia’s aggression, several hundred troops and 20 tanks are now in the Baltic. Yet the U.S. military is still injecting millions into the Russian military industrial complex. In late August, the United Launch Alliance – the...
 

 
Air Force photograph by Joe Davila

Boeing, Air Force demonstrate Minuteman III readiness in flight test

Air Force photograph by Joe Davila Boeing supported the launch of an unarmed Minuteman III intercontinental ballistic missile at Vandenberg Air Force Base, Calif., on Sept. 23, 2014. Boeing supported the U.S. Air Force’s succ...
 
 

Pentagon going to court for refusing to release Sikorsky data

PETALUMA, Calif. – The Pentagon is refusing to release any data on any prime contractors participating in the 25-year-old Comprehensive Subcontracting Plan Test Program. The American Small Business League launched a program in 2010 to expose the fraud and abuse against small businesses the CSPTP had allowed. As a test the ASBL requested the most...
 
 
Northrop Grumman photograph

Raytheon Griffin C flight tests demonstrate in-flight retargeting capability

Northrop Grumman photograph Northrop Grumman has received a contract from the U.S. Marine Corps for low-rate initial production of the AN/TPS-80 Ground/Air Task Oriented Radar (G/ATOR). G/ATOR is the first ground-based multi-mi...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>