Space

August 6, 2012

ATK Technologies on display as NASA’s Mars rover makes successful landing

ATK technologies and capabilities played mission-critical roles throughout the entire journey of NASA’s Mars Science Laboratory “Curiosity” rover, which successfully landed Aug. 5 inside Mars’ Gale Crater.

As it starts its two-year mission, Curiosity will gather data to help assess whether Mars ever had an environment capable of supporting microbial life.

ATK contributed technical and manufacturing expertise from the launch last year, through the nine-month flight to Mars, during descent to the surface, and now in the exploration phase of the mission.

ATK’s Clearfield, Utah and Iuka, Miss. facilities built the lightweight composite heat shield, interstage adapter and boat tail sections of the United Launch Alliance Atlas V that launched Curiosity in November 2011.

ATK products supported the flight to Mars and the challenging descent to and landing on the Martian surface. ATK’s Commerce, Calif. facility designed and built five propellant tanks, two of which supplied propellant to cruise thrusters to guide the spacecraft on its journey to the Red Planet; the other three provided propellant to the descent thrusters that successfully contributed to the surface landing. ATK Engineering Services in Pasadena, Calif. supported the design development of the Terminal Descent Sensor, which guided the descent stage.

ATK engineering teams in Pasadena, Calif. and Beltsville, Md. also provided key technical support to develop a number of the science instruments aboard the mobile laboratory. They provided the detail design engineering and supported the fabrication, integration and test of the rover’s Remote Sensing Mast Deploy Mechanism, as well as mechanical and thermal design and fabrication for the cornerstone Chemistry/Mineralogy instrument. CheMin is an X-ray diffraction and fluorescence instrument designed to identify and quantify the minerals in rocks and soils. Another major role included contributions to the design and development of a suite of instruments named Sample Analysis at Mars (SAM). These instruments will analyze samples of material collected and delivered by the rover’s robotic arm.

The data gathered by Curiosity from rock and soil samples will help determine whether conditions are favorable for future missions that could send humans to Mars. The rover will use 10 science instruments to examine rocks, soil and the atmosphere. The mobile laboratory will carry the most advanced payload of scientific gear ever used on Mars’ surface, according to NASA.

ATK Engineering Services in Pasadena, Calif. and Integrated Thermal Systems in Beltsville, Md. also provided support in the development of the thermal subsystem that protected Curiosity from the harsh environment it encountered on the Martian surface. At a design review, it was described as the most challenging thermal design ever seen.

“We are extremely proud to have played a role in this incredible achievement for NASA and the Jet Propulsion Laboratory, two of our long-standing customers,” said Dianne Sosa, ATK vice president of Engineering Services. “Our employees dedicated years of planning and preparation to ensure mission success for this newest voyage of exploration on Mars. We congratulate the NASA team for a successful landing and look forward to the key scientific findings that will help determine the potential for life on Mars.”

“We are honored to have been involved on almost every JPL/Mars mission,” said Gary Kawahara, ATK vice president and general manager, Space Components Division, Liquid Propulsion Products. “ATK’s diaphragm propellant tanks have demonstrated their reliability and safety on Mars programs from Mariner to Viking in the 1960s and 70s to the most recent Phoenix Lander. ATK has a perfect track record of more than 5,600 total tank deliveries with zero failures. As the journey to Mars is now complete and Curiosity is safely on the planet’s surface, our job has successfully concluded.”

The Mars Science Laboratory is managed for NASA’s Science Mission Directorate, Washington, D.C. by the Jet Propulsion Laboratory, a division of the California Institute of Technology, in Pasadena, Calif.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 25, 2014

News: U.S. sends second carrier to Asia amid tensions with China - The Navy is sending a second aircraft carrier strike group to the Asia Pacific region amid new tensions with China over a dangerous aerial encounter between a Chinese interceptor and a Navy P-8 surveillance aircraft. SpaceX rocket explodes during test flight - A SpaceX rocket...
 
 

News Briefs August 25, 2014

China says U.S. plane intercept was professional China’s Defense Ministry has rejected U.S. accusations that a Chinese fighter jet conducted a dangerous intercept of a U.S. Navy surveillance aircraft off the coast of China in international airspace. The ministry issued a statement Aug. 23 attributed to spokesman Yang Yujun calling the U.S. accusations groundless. It...
 
 

Ukraine plans $3 billion boost to defense spending

KIEV, Ukraine – Ukraine’s president announced plans Aug. 24 to boost his country’s defense spending by an estimated 50 percent as government forces seek to overpower pro-Russian separatists in the east. President Petro Poroshenko pledged to spend an extra 40 billion hryvnia ($3 billion) by 2017 during a speech marking Ukraine’s independence from the Soviet...
 

 

NASA awards research facilities, engineering support services contract

NASA has awarded a contract for research facilities and engineering support services to InuTeq, LLC of Greenbelt, Maryland, in support of the Mission Information and Test Systems Directorate at NASA’s Armstrong Flight Research Center, Edwards, Calif. This cost-plus-award-fee contract covers a one-year base period beginning Nov. 1, 2014 and four one-year options, and is valued...
 
 

Navy Awards General Dynamics contract for LCS planning yard services

The U.S. Navy awarded General Dynamics Bath Iron Works a $100 million contract to provide planning yard services for the Littoral Combat Ship program. General Dynamics Bath Iron Works is a business unit of General Dynamics. Bath Iron Works, as the LCS Planning Yard, will provide maintenance and modernization support for all Navy LCS 1...
 
 
boeing-boc

Boeing, BOC Aviation announce order for 82 airplanes

  Boeing announced Aug. 25 an order by BOC Aviation for 50 737 MAX 8s, 30 Next-Generation 737-800s and two 777-300ERs (Extended Range). The order, valued at $8.8 billion at list prices, is the largest in BOC Aviation’...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>