Space

August 10, 2012

Here comes the sun: NASA picks solar array system development proposals

NASA’s Space Technology Program has selected Deployable Space Systems of Goleta, Calif. and ATK Space Systems Inc., of Commerce, Calif., for contract negotiation to develop advanced solar array systems.

High-power solar electric propulsion, where the power is generated with advanced solar array systems, is a key capability required for extending human presence throughout the solar system.

The selected proposals offer innovative approaches to the development of next-generation, large-scale solar arrays and associated deployment mechanisms. These advanced solar arrays will drastically reduce weight and stowed volume when compared to current systems. They also will significantly improve efficiency and functionality of future systems that will produce hundreds of kilowatts of power. These advanced solar arrays could be used in future NASA human exploration and science missions, communications satellites and a majority of other future spacecraft applications.

“The technology embodied in these proposals will greatly advance the boundaries of NASA’s science and exploration capabilities,” said Michael Gazarik, director of NASA’s Space Technology Program at NASA Headquarters in Washington. “Our investment in this technology acknowledges that this technology is a priority for NASA’s future missions, as reported recently by the National Research Council. Once matured through these ground tests, NASA hopes to test next generation solar array systems in space, opening the door for exploration of a near-Earth asteroid, Mars and beyond.”

This solicitation involved a competitive selection process and covers two acquisition phases. Under Phase 1, Deployable Space Systems and ATK Space Systems will develop their solar array system technology during the next 18 months. With successful completion of Phase 1 the two companies, as well as other offerors who can demonstrate a comparable degree of technical maturity, will compete for a Phase 2 award to demonstrate their technologies in space. The intent of Phase 2 is to prove flight readiness through an in-space demonstration of an advanced, modular and extendable solar array system.

During Phase 1, Deployable Space Systems and ATK Space Systems also will design, analyze and test a scalable solar array system capable of generating more than 30kW of Power. In addition, the Phase 1 teams will identify the most critical technological risks of extending their concept to 250kW or greater power levels.

Phase 1 awards range between approximately $5 million and $7 million. NASA’s Game Changing Development Program Office, located at NASA’s Langley Research Center in Hampton, Va., sponsored this solicitation under Phase 1. NASA’s Glenn Research Center in Cleveland will manage the awarded contracts for the agency’s Space Technology Program.

NASA’s Space Technology Program is innovating, developing, testing, and flying hardware for use in NASA’s future science and exploration missions. NASA’s technology investments provide cutting-edge solutions for our nation’s future.

 

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines May 17, 2013

News One dead in U.S. Navy SEAL training accident at Fort Knox A U.S. Navy enlisted man was killed and as many as seven people were injured when their Humvee vehicle rolled over during a training exercise for elite SEAL forces at Fort Knox, Kentucky, a SEAL spokesman said May 17. Obama to announce major...
 
 

News Briefs May 17, 2013

U.S. military deaths in Afghanistan at 2,085 As of May 14, 2013, at least 2,085 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,727 military service members have died in Afghanistan as a result...
 
 
boeing-india

First Boeing P-8I maritime patrol aircraft arrives in India

The first Boeing P-8I long-range maritime reconnaissance and anti-submarine warfare aircraft arrived May 15, on schedule, at India Naval Station Rajali. The P-8I is one of eight aircraft Boeing is building for India as part of ...
 

 

2001 authorization still legal basis for war, leaders say

The 2001 Authorization for the Use of Military Force remains viable more than a decade after its passing, a panel of defense leaders told Congress May 16. The authorization empowers the president ìto use all necessary and appropriate force against those nations, organizations, or persons he determines planned, authorized, committed, or aided the terrorist attacks...
 
 

Army supports president’s request for 2015 BRAC round

As the Army cuts the number of soldiers in its ranks, there will be an excess of infrastructure in place that used to support those soldiers. Maintaining that extra unused infrastructure could mean other critical Army programs will suffer, said a senior official. “A future round of base realignment and closure, or BRAC, in the...
 
 

Missile defense system completes successful intercept test

The Missile Defense Agency and Navy sailors aboard the USS Lake Erie conducted a successful flight test of the Aegis Ballistic Missile Defense system May 15, Pentagon officials reported. In the test, the Aegis Ballistic Missile Defense 4.0 weapon system and a Standard Missile 3 Block IB missile intercepted a separating ballistic missile target over...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>