Space

August 13, 2012

Ball Aerospace incorporates enhanced data communication for JPSS-1 satellite

Ball Aerospace & Technologies Corp. will incorporate essential data communication enhancements for the Joint Polar Satellite System, currently under development for an early 2017 launch.

JPSS is the nation’s next generation polar-orbiting operational environmental satellite system, procured by the National Oceanic and Atmospheric Administration, through NASA.

JPSS will provide continuity of observations for accurate weather and storm forecasting, vertical profiles of temperature and moisture, global measurements of atmospheric and oceanic conditions, and ozone measurements.

Ball Aerospace built Suomi National Polar-orbiting Partnership – the first of the JPSS-class satellites – using the IEEE 1394 (FireWire) and MIL-STD 1553 data networks to support the five-instrument payload suite. For JPSS-1, Ball is converting the NPP spacecraft design from 1394 to a SpaceWire databus protocol for use by the Cross-track Infrared Sounder and the Visible/Infrared Imager Radiometer Suite instruments. The high-speed (>200Mbp) on-board communications provided by SpaceWire mitigates 1394 obsolescence risks at the JPSS program level and can be incorporated without risking schedule. The SpaceWire databus is a point-to-point cable bus based on the IEEE 1355 standard and has successfully flown on other NASA and international space agency missions.

Ball Aerospace will also modify JPSS-1 to improve reliability and flexibility for operations by replacing the primary X-band Science Mission Data downlink with a Ka-band telecom system transmitting to the ground communication system. A backup Ka-band SMD downlink system will be added, transmitting to NASA’s Tracking and Data Relay Satellite System, which offers possible future cost avoidance and latency improvements.

Ball is under contract to NASA’s Goddard Space Flight Center to design and build the JPSS-1 satellite bus, the Ozone Mapping and Profiler Suite instrument, integrate all instruments, and perform satellite-level testing and launch support. The JPSS-1 spacecraft is a member of the BCP family of spacecraft designed for cost-effective, remote sensing applications. The JPSS-1 spacecraft bus is the twelfth spacecraft built by Ball Aerospace on the BCP core architecture. In all, this architecture has more than 50 years of successful on-orbit operations.

The Joint Polar Satellite System provides global weather forecasts and long-term environmental monitoring critical to public safety, and economic and national security. JPSS will operationalize the advanced technologies currently being demonstrated on Suomi NPP, to provide enhanced Earth-observing information and environmental data. JPSS development is progressing smoothly, with an early 2017 launch anticipated for the first satellite in the JPSS series.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines March 27, 2015

News General Dynamics withdraws as T-100 prime contractor General Dynamics Information Systems and Technology has withdrawn itself as the prime contractor on the T-100, the offering for the T-X trainer replacement program based on the Alenia Aermacchi M-346 design.   Business SpaceX’s fight with U.S. Air Force called a clash of perceptions Billionaire Elon Musk’s...
 
 

News Briefs March 27, 2015

Contractor extradited from Iraq pleads guilty in bribes case A man extradited from Iraq in a military contract bribery case has pleaded guilty to three charges in an agreement with federal prosecutors. U.S. District Judge Thomas Rose has scheduled sentencing for July 1 for Metin Atilan. His attorney, Nick Gounaris, says the two sides agreed...
 
 

Ninth Boeing GPS IIF reaches orbit, sends first signals

Boeing Global Positioning System (GPS) IIF satellites are steadily replenishing the orbiting constellation, continuing to improve reliability and accuracy for users around the world. The ninth GPS IIF reached orbit about three hours, 20 minutes after launching today aboard a United Launch Alliance (ULA) Delta IV rocket from Cape Canaveral Air Force Station, Fla., and...
 

 

F-35 Lightning II costs drop, report shows

A recent account of F-35 Lightning II aircraft program costs shows decreases, the Air Force’s F-35 program executive officer told reporters in a media roundtable March 24, 2015. Lt. Gen. Christopher C. Bogdan, citing this year’s selected acquisition report on the aircraft, called the roundtable to clarify cost and performance facts. He also acknowledged the...
 
 
NG-growler2

Northrop Grumman delivers center/aft ‘shipset’ for first international EA-18G Growler

Northrop Grumman photograph Northrop Grumman mechanics perform final quality inspections on the center/aft fuselage shipset produced by the company for the first Australian EA-18G Growler. The subassembly will be delivered to B...
 
 
Navy photograph by Monica McCoy

Navy conducts production acceptance test of Tomahawk missile

Navy photograph by Monica McCoy Members of the Explosive Ordnance Disposal Technology Division team at Naval Surface Warfare Center, Indian Head prepare a Tomahawk missile for a functional ground test at the Large Motor Test Fa...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>