Defense

August 14, 2012

Harbormaster Command and Control Center manages chaotic maritime logistics traffic

Tags:
by Amy Walker
Aberdeen Proving Ground, Md.

The Harbormaster Command and Control Center’s Rigid Wall Shelter, which mounts on up-armored Humvees, was photographed during the HCCC Battle Command System of Systems Integration Training, Sept. 8, 2011, at Fort Eustis, Va. The Rigid Wall Shelte is based on a Standard Integrated Command Post System Command Post Platform, modified with different radios and applications.

A new highly mobile and tactically deployable system is being fielded by the Army to manage the often chaotic maritime supply traffic at harbors, shipping channels and beaches, ensuring route security as Army logistics transition from sea to shore.

The Harbormaster Command and Control Center, or HCCC, provides the Army logistician with the sensors and mission command tools needed to establish and maintain situational awareness even in hectic shipping environments.

“Where there’s a harbor and a mission, wherever the military wants to go, that’s where the Harbormaster will go,” said Maj. Michael J. Williams, former assistant product manager for HCCC. “It can conduct a humanitarian effort, or go into a full-spectrum operation where Marines fight and take the beach. The Harbormaster can follow quickly behind, in an Operation D-Day type of role, bringing in follow-on forces and supplies.”

HCCC will be part of an extensive Army, Navy and Marine training operation for a Joint Logistics Over-the-Shore, or JLOTS, exercise scheduled for mid-August at Fort Story, Va. During JLOTS, a ship-to-shore cargo delivery operation, flat-bottomed boats are used to drop connecting ramps into the water that meet up with larger deep-draft vessels stationed further out from shore in order to shuttle cargo back and forth.

Since the Harbormaster is intended to work in JLOTS operations, it rarely works alone. Usually the Army, Navy and other organizations such as the Military Sea Lift Command are also on location working side-by-side to coordinate traffic in the ocean, harbors and beaches that make up the littoral environment. The August JLOTS exercise will help Joint forces to rewrite the JLOTS operating manual to incorporate the HCCC system.

Soldiers train on a Rigid Wall Shelter during the Harbormaster Command and Control Center Battle Command System of Systems Integration Training, Sept. 8, 2011, at Fort Eustis, Va.

As of July, five of the seven Army units identified to receive HCCC will have been fielded, with the remaining two systems to be fielded by the end of fiscal year 2013. For their efforts in bringing the system from concept through to fielding, the HCCC team recently accepted a C4ISR Center of Excellence Team Award at Aberdeen Proving Ground, Md.

“Like an air traffic controller manages and coordinates the movement of air traffic to ensure that planes stay safe distances apart in the sky, this system will help Harbormaster Detachments manage the incoming flow of vessels and cargo needed in intense overseas contingency operations,” said Lt. Col. Carl Hollister, product manager for Command Post Systems and Integration, known as PdM CPS&I, which manages HCCC.

PdM CPS&I is assigned to Warfighter Information Network-Tactical, part of the Program Executive Office for Command, Control, Communications-Tactical.

Early in the year, the HCCC team trained and fielded to two Harbormaster Detachments, both Army Reserve units, at Port Chicago Calif. It was the first time the team provided new equipment training and Mission Command Systems Integration Training to two units at the same time. The training went off without a hitch, Williams said.

“The common operating picture provided by HCCC will help commanders synchronize the supply chain, speeding the delivery of cargo,” said Tonnesha Lewis, HCCC product lead. “Commanders will know the exact location of their ships at sea and when they will be arriving, enabling them to prioritize delivery of critical cargo.”

At the core of HCCC is the Rigid Wall Shelter, or RWS, which mounts on up-armored Humvee. The RWS is based on a Standard Integrated Command Post System,or SICPS, Command Post Platform, modified with different commercial, military and maritime radios and applications. The military radios in the RWS are self-enclosed, allowing instant connection as soon as the shelter is parked. The RWS connects to the Trailer Mounted Support System-Medium, or TMSS-M, that is comprised of a tent with a trailer supporting an 18 kilowatt generator and an environmental control unit. Together, the digital systems within the RWS and TMSS-M allow a commander to visualize the overall common operating picture.

Inside the HCCC tent, Soldiers leverage systems such as Global Command and Control System, known as the GCCS, which provides mission command at the highest levels of the Army and interfaces with Joint systems; and Battle Command Sustainment Support System, which provides actionable logistics information to commanders in near-real time. Outside the tent, a SIPR/NIPR Access Point satellite terminal provides satellite connectivity to the Army’s WIN-T tactical communications network and to commercial providers.

Harbormaster Command and Control Center is a deployable and tactically mobile system is used to manage harbors, ports and beaches – the littoral environment- in Overseas Contingency Operations.

The Harbormaster Trailer-mounted Sensor Platform, or HTSP, system is part of the Harbormaster’s radar sensor. It has a hydraulic mast-mounted radar with two video cameras, one for day and an infrared for night. The HTSP can be placed high up on a hill for maximum view to monitor the movement of friendly and potentially unfriendly vessels, said Gerry O’Keefe, SICPS project lead and former HCCC project lead.

Because terrain features can block communications, or because at times the operation is just too large, HCCC also has a main and a remote configuration to cover multiple mission requirements. It is flexible in its ability to support the Harbormaster mission in a variety of operational environments, O’Keefe said.

“This system provides the communication and mission command tools needed in the littoral environment to manage the scores of vessels that bring in supplies to Joint watercraft operations,” Hollister said. “Together the elements of HCCC give commanders a real-time picture of the activities on the sea and shoreline, increasing their situational awareness and ability to make timely decisions that enable successfully managed logistics operations.”

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines October 29, 2014

News: Unmanned rocket explodes just six seconds after taking off - A NASA rocket due to be visible across the East Coast on its way to the International Space Station has blown up on the Launchpad. IG: Former chief of wounded warrior office broke law, DOD regs - The Defense Department inspector general has recommended “corrective action”...
 
 

News Briefs October 29, 2014

F-35C makes first landing at Virginia Beach Navy base The Navy says an operational F-35C joint strike fighter has landed at Naval Air Station Oceana for the first time. Naval Air Station Oceana is the Navy’s master jet base on the East Coast. The Navy says the plane came to the Virginia Beach base Oct....
 
 

Time to turn to American technology for space launch

For the first time since the Cold War, the United States has deployed armored reinforcements to Europe. To counter Russia’s aggression, several hundred troops and 20 tanks are now in the Baltic. Yet the U.S. military is still injecting millions into the Russian military industrial complex. In late August, the United Launch Alliance – the...
 

 
Air Force photograph by Joe Davila

Boeing, Air Force demonstrate Minuteman III readiness in flight test

Air Force photograph by Joe Davila Boeing supported the launch of an unarmed Minuteman III intercontinental ballistic missile at Vandenberg Air Force Base, Calif., on Sept. 23, 2014. Boeing supported the U.S. Air Force’s succ...
 
 

Pentagon going to court for refusing to release Sikorsky data

PETALUMA, Calif. – The Pentagon is refusing to release any data on any prime contractors participating in the 25-year-old Comprehensive Subcontracting Plan Test Program. The American Small Business League launched a program in 2010 to expose the fraud and abuse against small businesses the CSPTP had allowed. As a test the ASBL requested the most...
 
 
Northrop Grumman photograph

Raytheon Griffin C flight tests demonstrate in-flight retargeting capability

Northrop Grumman photograph Northrop Grumman has received a contract from the U.S. Marine Corps for low-rate initial production of the AN/TPS-80 Ground/Air Task Oriented Radar (G/ATOR). G/ATOR is the first ground-based multi-mi...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>