Tech

September 5, 2012

New NASA book reveals pressure suits are height of fashion

NASA has published a colorful, picture-filled book that details the development and use of the protective clothing worn by test pilots, astronauts and others as they soar high above Earth.

“Dressing for Altitude: U.S. Aviation Pressure Suits – Wiley Post to Space Shuttle” provides a 526-page survey of the partial- and full-pressure suits designed to keep humans alive at the edge of space since their first use during the years before World War II. Pressure suits are not the spacesuits worn by spacewalking astronauts.

The book explores the challenges the clothiers-turned-engineers faced in designing a garment that could be relatively lightweight, flexible, inflatable, and still keep an ejecting pilot safe at high altitude and in the water.

“This work is designed to provide the history of the technology and explore the lessons learned through the years of research in creating, testing, and utilizing today’s high-altitude suits,” said Tony Springer of NASA’s Aeronautics Research Mission Directorate at the agency’s headquarters in Washington.

Dennis R. Jenkins, a writer, engineer and manager with 30 years of experience working on NASA programs, including the space shuttle, wrote the book and assembled its photographs and illustrations. Jenkins said he became interested in the topic especially after studying the work and dedication of Goodrich and David Clark Company, the two major companies responsible for most of the pressure suit’s development through the years.

“I knew little about pressure suits going into the book, so the entire process was a learning exercise to me,” Jenkins said.

 

To order printed copies of the coffee-table-style book from NASA’s Information Center, visit http://www.hq.nasa.gov/office/hqlibrary/ic/ic2.htm.

 

To download an e-book version of the book in PDF format at no charge, visit http://www.nasa.gov/connect/ebooks/.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>