Defense

September 5, 2012

ORS Office organizing three new programs

Tags:
Michael P. Kleiman
Kirtland AFB, N.M.


Perhaps the Operationally Responsive Space Office should consider changing its motto of “Employ. Deploy. Develop” to “Reaching the Reality of Rapid Response.”

In the past 14 months, the organization experienced success with its initial satellite, ORS-1, transitioned for operational use to U.S. Central Command in January, approximately six months after launch.

It also funded the liftoff and first 180 days of flight of the experimental Tactical Satellite-4, slated for transfer to U.S. Strategic Command less than one year after reaching orbit.

Not resting on its laurels, the ORS Office has implemented an aggressive strategy in designing, developing, launching and operating low-cost, rapid-reaction spacecraft through the ORS-2, ORS-3 and ORS-4 programs.

“Although ORS-1’s and TacSat-4’s operational performance in providing joint force commanders with enhanced battlespace awareness has exceeded expectations, our team’s focus has remained on producing affordable and quickly assembled and launched (within days to a week after receiving the warfighter’s request) satellites,” said Dr. Peter Wegner, ORS Office director. “Our three current programs (ORS-2, ORS-3 and ORS-4), will make huge strides in rapid response becoming a reality.”

Currently, in the development stage, ORS-2 will consist of a modular, rapidly configurable bus employing plug-and-play technology, as well as radar and electronic tactical support payloads.

The satellite, with a projected $20 million mission cost, will operate in a 45-degree inclination orbit 311 miles above the Earth.

Much of the ORS-2 program schedule has yet to be determined, but delivery of the modular bus has been planned for summer 2012.

Like its predecessor, ORS-2 will provide enhanced battlespace awareness to the JFC during its planned one-year mission.

On the other hand, project specifics for ORS-3 have been decided. Planned to launch from the Mid-Atlantic Regional Spaceport located at NASA’s Wallops Flight Facility, Wallops Island, Va., in August 2013, the satellite will feature a primary payload, the Air Force Space and Missile Systems Center’s Space Test Program Satellite-3 and 27 additional experiments comprised of free-flying systems and non-separating components. ORS-3 will employ CubeSat wafers, which enable secondary payloads to take advantage of excess lift capacity unavailable to the primary trial.

In addition, the third ORS mission, costing $27 million, will demonstrate launch vehicle flight safety architecture of the future through the Autonomous Flight Safety System payload, which uses launch vehicle orbital targeting and range safety planning processes to protect public safety from an errant launch vehicle during flight.
“I am really excited about the Autonomous Flight Safety System payload onboard ORS-3 because the apparatus will allow for real-time range safety calculations. For example, if the launch vehicle encounters an emergency immediately following liftoff, the AFSS will assist in immediately aborting the rocket, which ultimately prevents loss of life and property,” Wegner said. “Another unique aspect of ORS-3 is the 27 secondary experiments consisting of both separating (free-flying) and non-separating. Several universities and businesses have expressed interest in participating in the ORS-3 flight, which will use an integrated payload stack.”

Finally, the fourth ORS mission also has a definitive timetable with most pre-liftoff milestone dates established and the launch window no earlier than September 2013.

Using a three-stage sounding rocket known as Super Strypi will deliver to orbit an integrated payload stack of approximately 419 pounds, launched from the U.S Navy’s Pacific Missile Range Facility, Barking Sands, near Kekaha, Kauai County, Hawaii, and will operate in 97-degree orbit approximately 280 to 326 miles above the planet.
Like ORS-3, onboard payloads include the AFSS and CubeSat Wafers, which will accommodate an undetermined number of secondary experiments.

With a $10 to $12 million price tag, ORS-4 will function with decreased infrastructure comprised of the AFSS, global positioning system metric tracking, space-based telemetry relay, and automated flight planning.

“Since its inception in May 2007, the ORS Office has been committed 24/7/365 to providing space power focused on the timely satisfaction of Joint Force Commanders’ needs. Both ORS-1 and TacSat-4 have been resounding successes for us to build upon in achieving rapid, responsive and affordable space flight,” said Dr. Wegner. “I believe the next three ORS missions will enable us to accomplish that milestone. We are prepared to do so.”




All of this week's top headlines to your email every Friday.


 
 

 

Headlines December 17, 2014

News: U.S. Air Force tanker platform slated for year-end debut - Boeing is planning for first flight of its 767-2C – upon which the U.S. Air Force’s new KC-46 tanker will be based – by year’s end, six months late. Northrop Grumman wins $657.4 million deal to supply drones to South Korea - Northrop Grumman has won...
 
 

NASA launches new Micro-g NExT for undergraduates

NASA is offering undergraduate students an opportunity to participate in a new microgravity activity called Micro-g Neutral Buoyancy Experiment Design Teams. The deadline for proposals is Jan. 28, 2015. Micro-g NExT challenges students to work in teams to design and build prototypes of spacewalking tools to be used by astronauts for spacewalk training in the...
 
 
launch1

Storm fails to quench liftoff of secret reconnaissance satellite

The fiery launch of an Atlas V (541), among the most powerful of the venerable Atlas family, briefly dispelled the gloom over Californiaís Central Coast on the evening of Dec. 12. A team of personnel from United Launch Allianc...
 

 
Coast Guard photograph

Navy demonstrates unmanned helicopter operations aboard Coast Guard cutter

http://static.dvidshub.net/media/video/1412/DOD_102145893/DOD_102145893-512×288-442k.mp4 Coast Guard photograph An MQ-8B Fire Scout UAS is tested off the Coast Guard Cutter Bertholf near Los Angeles, Dec. 5 2014. The Coast...
 
 
GPS-OCX

GPS III, OCX successfully demonstrate key satellite command, control capabilities

Lockheed Martin and Raytheon successfully completed the fourth of five planned launch and early orbit exercises to demonstrate new automation capabilities, information assurance and launch readiness of the worldís most powerfu...
 
 

Aerojet Rocketdyne successfully demonstrates 3D printed rocket propulsion system for satellites

Aerojet Rocketdyne has successfully completed a hot-fire test of its MPS-120 CubeSat High-Impulse Adaptable Modular Propulsion System. The MPS-120 is the first 3D-printed hydrazine integrated propulsion system and is designed to provide propulsion for CubeSats, enabling missions not previously available to these tiny satellites. The project was funded out of the NASA Office of Chief...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>